Records in 2017. Most recent: inspection, 12 July 2017.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 13 July 2017
Resolved
CITE: 74 SOLAS (2014) I/II(A) CODE: 0999 ACTION: 40AC
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. PIN-HOLE LEAKS IN THE SEWAGE DRAIN LINE LEADING TO SEWAGE HOLDING TANK AND MSD.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 July 2017
Resolved 14 July 2017
Resolution: Pipe was renewed.
Engineering › Generator (propulsion/auxiliary-electric) › Generator Voltage Regulator Circuitry
Issued 13 July 2017
Resolved
CITE: 74 SOLAS (2014) I/II(A) CODE: 1499 ACTION: 40AC
THE COOLANT HOSES ARE LEAKING IN THE EMERGENCY GENERATOR.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 July 2017
Resolved 14 July 2017
Resolution: Hoses were repaired.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 13 July 2017
Resolved
CITE: MARPOL ANNEX VI/16.6.1 CODE: 2199 ACTION: 40AC
EACH INCINERATOR SUBJECT TO THIS PARAGRAPH SHALL BE APPROVED BY THE ADMINISTRATION TAKING INTO ACCOUNT THE STANDARD SPECIFICATION FOR SHIPBOARD INCINERATORS DEVELOPED BY THE ORGANIZATION. THE INCINERATOR FAILED TO IGNITE.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 July 2017
Resolved 14 July 2017
Resolution: Incinerator was repaired.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 July 2017
Resolved
CITE: 74 SOLAS (01) II-2/2.2.8 CODE: 1499 ACTION: 40AC
THE FOLLOWING BASIC PRINCIPLE UNDERLINE THE REGULATIONS IN THIS CHAPTER HAVING REGARD TO THE TYPE OF SHIPS AND THE POTENTIAL FIRE HAZARD INVOLVED TO MINIMIZE THE POSSIBILITY OF IGNITION. HYDRAULIC SUPPLY LINES IN TOP OF PUMP ROOM ARE LEAKING.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 July 2017
Resolved 14 July 2017
Resolution: lines were tighted and the leaks were stopped.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 July 2017
Resolved
CITE: 74 SOLAS (2014) I/11(a) CODE: 1820 ACTION: 10C
CONDITION OF SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED SEA W/OUT DANGER TO SHIP OR PERSONS ON BOARD. #3 CARGO PUMP WOULD NOT START.
Action required: 705 - Other - as specified
Due 13 July 2017
Resolved 13 July 2017
Engineering › Generator (propulsion/auxiliary-electric) › Auto Transformer Circuitry
Issued 13 July 2017
Resolved
CITE: 74 SOLAS (01) II-2/43.3.1.3 CODE: 1499 ACTION: 10C
WHERE THE EMERGENCY SOURCE OF ELECTRICAL POWER IS A GENERATOR, IT SHALL BE CAPABLE OF BEING AUTOMATICALLY STARTED AND SUPPLYING THE REQUIRED LOAD AS QUICKLY AS IS SAFE AND PRACTICABLE SUBJECT TO A MAXIMUM OF 45 S. THE EMERGENCY GENERATOR WOULD NOT TAKE A LOAD IN 45 SECONDS.
Action required: 705 - Other - as specified
Due 13 July 2017
Resolved 13 July 2017
Deck/Cargo › Inert Gas System › IGS Blower
Issued 12 July 2017
Resolved
CITE: 74 SOLAS (2001) II-2/62.7.2 CODE: 1199 ACTION: 60AC
AT LEAST TWO BLOWERS SHALL BE FITTED WHICH TOGETHER SHALL BE CAPABLE OF DELIVERING TO THE CARGO TANKS AT LEAST THE VOLUME OF GAS REQUIRED BY PARAGRAPH 3. THE #2 BLOWER IS INOPERABLE.
Action required: 60 - Rectify deficiencies prior to movement
Due 14 July 2017
Resolved 14 July 2017
Resolution: Blower was repaired.
Deck/Cargo › Ballast › Vents
Issued 12 July 2017
Resolved
CITE: 74 SOLAS (2014) I/II(a) CODE: 0940 ACTION: 40ac
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMIAN FIT TO PROCEED TO SEA WITHOU DANGER TO THE SHIP OR PERSONS ON BOARD. #1 STBD BALLAST WATER TANK VENT HAS PUNCTURES BACKSIDE OF TANK UNPROTECTED BY FLAME SCREEN.
Action required: 15 - Rectify deficiencies by next port
Due 13 July 2017
Resolved 14 July 2017
Resolution: Vent was repaired.