MAURY USCG vessel records Sign in
← All vessels

ELANDRA SEA

ELANDRA SEA is a 2013 tank ship. The Coast Guard has recorded 14 inspections since 2014, most recently in April 2024, along with 1 deficiency and 3 operational controls.

Records from 2014 to 2024. Most recent: inspection, 5 April 2024.

Built
2013
Last inspected
5 April 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9635779 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7A2274
1256872
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1256872

Inspections, by type

…with no type recorded4
Years with a record 8 calendar years (2014–2024)
The 14 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it13368 - Convention (Subpart B), Net Ton
60857 - Displacement, Metric Ton
49999 - Dead Weight, Metric Ton
29939 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 14

5 April 2024 COC-CHEM Renew · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7889746
23 December 2022 COC-CHEM Renew · PSC B
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7610828
2 March 2021 COC-CHEM Renew · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7148715
22 July 2019 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6755451
8 June 2019 COC-CHEM & TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6707198
14 March 2019 ISPS II Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6641759
3 May 2018 COC-CHEM & TVE Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6404462
14 April 2017 Ballast Water Examination · ISPS II Exam · COE-Offshore · COC-TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6124284
9 April 2017 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6120496
29 July 2016 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5959288
29 July 2016 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5966125
24 June 2016 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5917581
13 January 2016 COE-Offshore · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5796437
11 August 2014 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4951139

Deficiency record · 1

Fire Fighting › Fixed Deck Foam System › Valves
Issued 14 April 2017 Resolved
FOR TANKERS OF 20000 TONNES DEADWEIGHT AND UPWARDS, A FIXED DECK FOAM FIRE-EXTINGUSHING SYSTEM SHALL BE PROVIDED COMPLYING WITH THE PROVISIONS OF THE FIRE SAFETY SYSTEMS CODE. WHILE CONDUCTING THE FIRE DRILL DECK FOAM MONITORS PRODUCED FOAM WHILE VALVES FOR FOAM PUMPS WERE SHUT. DRILL WAS INTENDED TO PRODUCE WATER FROM FOAM MONITORS ALONE. SOLAS74(14CONS.)II-2/10.8.1.1 FSS CODE 14.2.3.4 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 18 April 2017
Resolved 18 April 2017
Resolution: Valve isolating flushing line from water line was opened and overhauled. Test was conducted in presence of class with no foam reported.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.