Records from 2017 to 2026. Most recent: inspection, 29 January 2026.
Inspection history · 9
29 January 2026
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8303592
28 August 2025
PSC B · COC-CHEM & TVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8214265
20 August 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7985520
9 August 2024
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7977932
31 July 2024
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7967623
9 January 2023
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7619154
7 November 2022
Ballast Water Examination
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7590348
31 October 2022
COC-CHEM Renew · PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7584131
19 July 2017
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6209421
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 31 July 2024
Resolved
The inert gas system referred to in chapter II-2 of the convention shall be designed, constructed and tested to the satisfaction of the administration. PSCO observed inop transformer in #2 feed pump compressor.
74 SOLAS (CONS 2020) II-2/5.5.1.1
FSS Code CH 15 2.2.1.1
Action required: 15 - Rectify deficiencies by next port
Due 7 August 2024
Resolved 8 August 2024
Resolution: Class witnessed operation
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 31 July 2024
Resolved
In meeting these requirements, the company should ensure that any non-conformity is reported, with its possible cause if known. Vessel did not follow SMS procedures "following an event the master shall call the ship superintendent, or his alternate" for the issue with the #2 feed pump compressor.
74 SOLAS (CONS 2020) IX/ 3.1
ISM Code 10.2.2
Action required: 15 - Rectify deficiencies by next port
Due 7 August 2024
Resolved 8 August 2024
Resolution: Class investigated. Recommended internal audit.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 31 July 2024
Resolved
A fixed inert gas system in accordance with the requirements of the FSS CODE, automatic shutdown of cargo pumps shall be provided to operate on predetermined limits of pressure in the inert gas main being reached. IG main low low alarm could not be demonstrated. Cannot load cargoes that require inerting.
74 SOLAS (CONS 2020) II-2/5.5.1.1
FSS CODE CH 15 2.2.4.5.3
Action required: 705 - Other - as specified
Due 7 August 2024
Resolved 8 August 2024
Resolution: Class witnessed operation.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 31 July 2024
Resolved
Hoses that transfer vapors must have flanges that have a bolt hole arrangement with requirements for 150 pound class ANSI B16.5 flagnes and one diameter (0.625 inch) stud located midway between bolt holes and in line with the bolt hole pattern. PSCO observed vapor hose without stud.
46 CFR 39.2001 (i) (5)
Action required: 10 - Deficiency Rectified
Due 31 July 2024
Resolved 31 July 2024
Resolution: Crew removed vapor hose line from cargo operation use.
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 7 November 2022
Resolved
The master, owner, operator, agent, or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the following ballast water management methods: Install and operate a ballast water management system (BWMS) that has been approved by the Coast Guard under 46 CFR part 162. The BWMS must be installed in accordance with § 151.2035(b) of this subpart. Following installation, the master, owner, operator, agent, or person in charge of the vessel subject to this subpart must properly maintain the BWMS in accordance with all manufacturer specifications. Unless otherwise expressly provided for in this subpart, the master, owner, operator, agent, or person in charge of vessels employing a Coast Guard-approved BWMS must meet the applicable ballast water discharge standard (BWDS), found in § 151.2030 of this subpart, at all times of discharge into the waters of the United States.
The vessel reported an inoperable ballast water management system to USCG Sector North Carolina and would not be able to rectify the deficiency while operating in the waters of the United States. The vessel must complete a ballast water exchange in an area 200 nautical miles from any shore between ballast water discharge events into the waters of the United States. 33 CFR 151.2025(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 January 2023
Resolution: Received technician report attesting to repairs for BWMS and proper operation.