CYCLADIC SPIRE is a 2013 freight ship. The Coast Guard has recorded 13 inspections since 2016, most recently in May 2026, along with 3 deficiencies and 1 operational control.
Records from 2016 to 2026. Most recent: inspection, 21 May 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it20254 - Convention (Subpart B), Gross Ton 10566 - Convention (Subpart B), Net Ton 32976 - Dead Weight, Ton 42064 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 13
21 May 2026PSC B
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8373706
17 November 2025Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8271436
22 November 2024PSC B
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8034356
12 June 2023PSC B
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7694952
31 August 2021Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7300878
18 August 2021PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7290208
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 February 2019Resolved
13199 - THE MACHINERY, BOILERS AND OTHER PRESSURE VESSELS ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THERE ARE SEVERAL PINHOLE LEAKS IN THE SEA WATER COOLING LINE FOR AIR CONDITIONING AND REFRIGERATION. SOLAS 74 (14) II-1.26/1-40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2019
Resolution: The sea water cooling pipe line and sprinkler pipe line were replaced. The included Class Report has further information.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 February 2019Resolved
13199 - AFTER ANY SURVEY OF THE SHIP UNDER REGULATIONS 7, 8, 9 OR 10 HAS BEEN COMPLETED, NO CHANGE SHALL BE MADE IN THE STRUCTURAL ARRANGEMENTS, MACHINERY, EQUIPMENT, AND OTHER ITEMS COVERED BY THE SURVEY. THERE ARE TEMPORARY REPAIRS AND FABRICATED PIPING ON THE MAIN ENGINE HEAT EXCHANGER SEAWATER COOLING LINE, GENERATOR HEAT EXCHANGER SEAWATER COOLING LINE, AND LUBE OIL HEAT EXCHANGER SEAWATER COOLING LINE. SOLAS 74 (09) I/11(B), 40AC
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2019
Resolution: The sea water cooling pipe line and sprinkler pipe line were replaced. The included Class Report has further information.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 26 February 2019Resolved
07124 - FIRE-FIGHTING SYSTEMS AND APPLIANCES SHALL BE KEPT IN GOOD WORKING ORDER AND READILY AVAILABLE FOR IMMEDIATE USE. THERE IS A PINHOLE LEAK IN THE SPRINKLER LINE IN THE PAINT LOCKER. 74 SOLAS (09) II-2/14.2.1.2-40AC
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2019
Resolution: The sea water cooling pipe line and sprinkler pipe line were replaced. Further information can be found on the Class Report.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.