Records from 2016 to 2026. Most recent: inspection, 25 June 2026.
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 27 June 2026
Resolved
A hazmat employer shall ensure that each of its hazmat employees is trained in accordance with the requirements prescribed in this subpart.
Hazmat employee training must include the following: (1) General awareness/familiarization training (2) Function-specific training (3) Safety training (4) Security awareness training.
Provide evidence of hazmat training for the licensed and unlicensed employees performing hazmat duties on the PACIFIC MARINE 1.
49 CFR 172.702
Action required: 705 - Other - as specified
Due 29 June 2026
Resolved 29 June 2026
Resolution: The crew and company provided certification for 8 hour HAZMAT refresher training.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 27 June 2026
Resolved
The following vessels must have on board a properly installed, operational Coast Guard type-approved AIS Class A device:
(i) A self-propelled vessel of 65 feet or more in length, engaged in commercial service.
The AIS is inoperable.
33 CFR 164.46(b)
Action required: 705 - Other - as specified
Due 29 June 2026
Resolved 29 June 2026
Resolution: A FCC technician was onboard and repaired the AIS.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 27 June 2026
Resolved
The actions and observations noted in this section shall be entered in the official log book. This section contains no requirements which are not made in other portions of this subchapter, the items being merely grouped together for convenience.
(a) Onboard training, musters, and drills: held in accordance with subchapter W (Lifesaving appliances and Arrangements) of this chapter.
(c) Drafts and Load Line Markings. Prior to leaving port, ocean, coastwise, and Great Lakes services only. See § 97.15-5.
(d) Verification of vessel compliance with applicable stability requirements. After loading and prior to departure and at all other times necessary to assure the safety of the vessel. See § 97.15-7.
(e) Loading doors. Where applicable, every closing and any opening when not docked. See § 97.15-17.
(f) Hatches and other openings. All openings and closings, or leaving port without closing. Except vessels on protected waters. See § 97.15-20.
(g) Emergency Lighting and Power Systems. Weekly and semi-annually. See § 97.15-30.
The entries required above were not found in the logbook for the vessel.
46 CFR 97.35-5
Action required: 705 - Other - as specified
Due 29 June 2026
Resolved 29 June 2026
Resolution: MSU Saipan provided the USCG logbooks with the required blank entries. The crew familiarized themselves with the logbooks and logged entries.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 27 June 2026
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
IAW 46 CFR 199.60; Radio lifesaving appliances. Radio lifesaving appliance installations and arrangements must meet the requirements of 47 CFR part 80.
The HF radio is not connected to primary power.
46 CFR 90.27-1
Action required: 17 - Rectify deficiencies prior to departure
Due 29 June 2026
Resolved 29 June 2026
Resolution: A FCC technician was onboard and completed repairs to the HF power sources.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 June 2026
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter.
IAW 46 CFR 112.05-5(a); The emergency lighting requirements of § 112.15-1 (b), (c), (f), and (g) must be met. Requirements of Subpart 112.39 must be met by the relay-controlled, battery-operated lanterns. Emergency power supply must be at least 6 hours.
The stbd side emergency light in the lazarette was found inoperable.
46 CFR 90.25-1
Action required: 17 - Rectify deficiencies prior to departure
Due 29 June 2026
Resolved 29 June 2026
Resolution: The crew repaired the emergency lighting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 June 2026
Resolved
Shutoff valves must be installed in the fuel supply lines, one as close to each tank as practicable, and one as close to each fuel pump as practicable. Valves must be accessible
at all times.
The port side fuel tank remote fuel shutoff valve was inoperable when tested.
46 CFR 56.50-75(B)(4)
Action required: 17 - Rectify deficiencies prior to departure
Due 29 June 2026
Resolved 29 June 2026
Resolution: The remote fuel shutoff valves were tested and found operational.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 27 June 2026
Resolved
Each pump must be capable of delivering water simultaneously from the two highest outlets at a Pitot tube pressure of approximately 50 PSI. Fire pump was unable to prime and produce required pressure to the fire main system.
46 CFR 95.10-5(c)
Action required: 17 - Rectify deficiencies prior to departure
Due 29 June 2026
Resolved 29 June 2026
Resolution: The fire pump was tested and found operational at 55 psi.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 27 June 2026
Resolved
Each machinery space must be ventilated to ensure that, when machinery or boilers are operating at full power in all-weather including heavy weather, an adequate supply of air is maintained for the operation of the machinery and for the safety, efficiency, and comfort of the crew. Stbd engine room dampener is seized and unable to fully cycle open or close.
46 CFR 58.01-45.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 June 2026
Resolved 29 June 2026
Resolution: The crew repaired the fire dampener and cycled it for the MI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 June 2026
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
The stbd ring buoy life light was found with conductors soldered instead of the screw down connection.
46 CFR § 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 June 2026
Resolved 29 June 2026
Resolution: The operator replaced the batteries with new batteries and connected via the screw down posts.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 June 2026
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter.
The flexible fill piping on the fuel tanks is not bonded from the metal hull to metal tank.
46 CFR § 90.25-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 June 2026
Resolved 29 June 2026
Resolution: The crew installed a bonding wire from metal to metal.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 June 2026
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
The vessel markings were found faded on the ring buoys.
46 CFR § 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 June 2026
Resolved 29 June 2026
Resolution: The crew members renewed the markings on the ring buoys.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 27 June 2026
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
Three flares were found onboard. The vessel is required to have a minimum of 12 onboard.
46 CFR § 90.27-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 June 2026
Resolved 29 June 2026
Resolution: 12 flares were found onboard in a watertight container.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 27 June 2026
Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of subchapter F (Marine Engineering) of this chapter.
The bilge overboard skin valve was found installed after a flexible hose at the side shell. 46 CFR 56.50(c)(3)(iv) prohibits this installation.
46 CFR § 90.20-1
Action required: 17 - Rectify deficiencies prior to departure
Due 27 June 2026
Resolved 2 July 2026
Resolution: The operator connected a skin valve and non return valve to the threaded connection that is welded to the side shell plate.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 8 June 2026
No resolution recorded
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date, except as required in paragraph (b) of this section.
The vessel opeator missed two annual vessel inspections. The COI is no longer valid and the vessel is not permitted to carry freight for hire.
46 CFR § 91.27-1
Action required: 17 - Rectify deficiencies prior to departure
Due 8 June 2026 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2024
Resolved
Shutoff valves must be installed in the fuel supply lines, one as close to each tank as practicable, and one as close to each fuel pump as practicable. Valves must be accessible
at all times. Remote shutoff valves at the operating station are not labeled for immediate identification.
46 CFR 56.50-75(B)(4)
Action required: 705 - Other - as specified
Due 7 August 2024
Resolved 15 November 2024
Resolution: Remote shutoff valves at the operating station were found labeled
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 August 2024
Resolved
Each pump must be capable of delivering water simultaneously from the two highest outlets at a Pitot tube pressure of approximately 50 PSI. Fire pump was unable to prime and produce required pressure to the fire main system.
46 CFR 95.10-5(c)
Action required: 705 - Other - as specified
Due 7 August 2024
Resolved 15 November 2024
Resolution: Witnessed the crew test the fire pump which operated at 60 psi.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 August 2024
Resolved
Each machinery space must be ventilated to ensure that, when machinery or boilers are operating at full power in all-weather including heavy weather, an adequate supply of air is maintained for the operation of the machinery and for the safety, efficiency, and comfort of the crew. Engine room dampeners are seized and unable to fully cycle open or close.
46 CFR 58.01-45.
Action required: 705 - Other - as specified
Due 7 August 2024
Resolved 15 November 2024
Resolution: The crew renewed the gaskets to the dampers and greased each lever. The dampers were tested and found satisfactory for service.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2024
Resolved
Indication of the rudder angle must be provided both at the main steering station in the pilothouse and in the steering-gear compartment. The rudder angle indicator at the main steering station in the pilothouse is not functional.
46 CFR 58.25-25(a).
Action required: 705 - Other - as specified
Due 7 August 2024
Resolved 15 November 2024
Resolution: The rudder angle indicator at the main steering station in the pilothouse is functional and was tested by the crew.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 August 2024
Resolved
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. The starboard battery voltage meter is not functional at the operators station.
46 CFR 111.01-1(a)(1).
Action required: 705 - Other - as specified
Due 7 August 2024
Resolved 15 November 2024
Resolution: The starboard battery voltage meter was replaced and found operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 August 2024
Resolved
Automatic bilge pumps must - Be provided with bilge high level alarms that annunciate in the machinery spaces and at a manned control location and are independent of the pump controls. Engine room high level visual alarm was not operational at the operating station. Audible alarm was functional.
46 CFR 62.35-10(a)(1)
Action required: 705 - Other - as specified
Due 7 August 2024
Resolved 15 November 2024
Resolution: All high level bilge alarms in every void, engine room, and lazarette were tested and found operational.
01 - Certificates & Documentation › 012 - Crew Certificates › Evidence of Basic Training
Issued 6 August 2024
Resolved
A hazmat employer shall ensure that each of its hazmat employees is trained in accordance with the requirements prescribed in this subpart.
Hazmat employee training must include the following: (1) General awareness/familiarization training (2) Function-specific training (3) Safety training (4) Security awareness training.
Provide evidence of hazmat training for the licensed and unlicensed employees performing hazmat duties on the PACIFIC MARINE 1.
49 CFR 172.702
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: All employees completed required HAZMAT training and were able to provide evidence of completion with a certificate.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 6 August 2024
Resolved
The following vessels must have on board a properly installed, operational Coast Guard type-approved AIS Class A device:
(i) A self-propelled vessel of 65 feet or more in length, engaged in commercial service.
Install a class A AIS device at the operating station.
33 CFR 164.46(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 13 December 2024
Resolution: A new AIS antenna was installed and the system is operational.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 6 August 2024
Resolved
The actions and observations noted in this section shall be entered in the official log book. This section contains no requirements which are not made in other portions of this subchapter, the items being merely grouped together for convenience.
(a) Onboard training, musters, and drills: held in accordance with subchapter W (Lifesaving appliances and Arrangements) of this chapter.
(c) Drafts and Load Line Markings. Prior to leaving port, ocean, coastwise, and Great Lakes services only. See § 97.15-5.
(d) Verification of vessel compliance with applicable stability requirements. After loading and prior to departure and at all other times necessary to assure the safety of the vessel. See § 97.15-7.
(e) Loading doors. Where applicable, every closing and any opening when not docked. See § 97.15-17.
(f) Hatches and other openings. All openings and closings, or leaving port without closing. Except vessels on protected waters. See § 97.15-20.
(g) Emergency Lighting and Power Systems. Weekly and semi-annually. See § 97.15-30.
The entries required above were not found in the logbook for the vessel.
46 CFR 97.35-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: All log entries were made using a Coast Guard official logbook.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
(1) Drills must, as far as practicable, be conducted as if there were an actual emergency.
(2) Every crewmember must participate in at least one abandon-ship drill and one fire drill every month.
The crew members were participating in drills once every three months instead of once a month. Provide evidence of monthly drills IAW 46 CFR 199.180.
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: All crew members completed required drills and the drills were found logged.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
As per 46 CFR 199.180(h); When musters are held, details of abandon-ship drills, fire drills, drills of other lifesaving appliances, and onboard training must be recorded in the vessel's official logbook. Logbook entries must include—
(i) The date and time of the drill, muster, or training session;
(ii) The survival craft and fire-extinguishing equipment used in the drills;
(iii) Identification of inoperative or malfunctioning equipment and the corrective action taken;
(iv) Identification of crewmembers participating in drills or training sessions; and
(v) The subject of the onboard training session.
Provide logbook entries for all drills conducted with the crew.
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: All drills were found logged and up to date.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
Training material must be on board each vessel and must consist of a manual of one or more volumes written in easily understood terms and illustrated wherever possible, or of audiovisual training aids, or of both as follows:
(2) The training material must explain in detail—
(i) The procedure for donning lifejackets, immersion suits, and anti-exposure suits carried on board;
(ii) The procedure for mustering at the assigned stations;
(iii) The procedure for boarding, launching, and clearing the survival craft and rescue boats;
(v) The procedure for releasing survival craft from launching appliances;
(vii) The illumination in the launching areas;
(viii) The use of all survival equipment;
(x) With the assistance of illustrations, the use of radio lifesaving appliances;
(xiv) The hazards of exposure and the need for warm clothing;
(xvii) All other functions contained in the muster list and emergency instructions; and
(1) Every crewmember with emergency duties assigned on the muster list must be familiar with their assigned duties before the voyage begins.
Provide emergency procedures for all required equipment onboard as per 49 CFR 199.180(a).
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: Training material was updated for all systems and is kept in a binder onboard for all crew.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification and periodic inspection, and shall include, as applicable, a demonstration of— The proper servicing of each inflatable liferaft and inflatable lifejacket has been serviced as required under this chapter; The ability of crew to effectively carry out abandon-ship and fire-fighting procedures.
The life raft was not onboard due to servicing. Provide the annual servicing certificate and install the life raft for the inspection. MI shall witness the crew perform abandon-ship and fire-fighting procedures IAW 46 CFR 199.45(b).
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: The life raft was onboard and recently serviced by a third party for annual servicing.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
IAW 46 CFR 199.60; Radio lifesaving appliances. Radio lifesaving appliance installations and arrangements must meet the requirements of 47 CFR part 80.
The HF radio is not connected to emergency power.
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: The HF radio was found connected to emergency power and primary power.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
IAW 46 CFR 199.70(b)(2)(iii); The lifejackets stowage positions must be marked with the words “ LIFEJACKETS” or “CHILD LIFEJACKETS” as appropriate, or with the appropriate symbol from IMO Resolution A.760(18).
Each lifejacket, immersion suit, and anti-exposure suit container must be marked in block capital letters and numbers with the quantity, identity, and size of the equipment stowed inside the container.
The life jacket stowage containers located fwd of the operating station are not marked accordingly.
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: All life jacket stowage containers were properly marked with the contents and number of life jackets.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
IAW 46 CFR 199.110(c); Each muster station and embarkation station must be adequately illuminated by lighting with power supplied from the vessel's emergency source of electrical power.
The life raft embarkation station is not adequately illuminated with emergency power. One dim light was found installed facing the life raft.
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: The crew renewed the existing light on the aft main deck facing the life raft stowage and installed a new deck light facing the waterside for embarkation.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
IAW 46 CFR 199.80(a); Clear instructions must be provided on the vessel that detail the actions each person on board should follow in the event of an emergency.
There are no posted emergency procedures for crew members onboard.
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: Emergency procedures were found posted at the operating station.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 6 August 2024
Resolved
All lifesaving appliances and arrangements must be in accordance with subchapter W (Lifesaving Appliances and Arrangements) of this chapter.
IAW 46 CFR 199.60(a); Radio lifesaving appliance installations and arrangements must meet the requirements of 47 CFR part 80.
The FCC station authorization and FCC Safety Certificate are expired.
46 CFR 90.27-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: All FCC certificates were renewed by the FCC tech from Guam.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 6 August 2024
Resolved
Each general alarm contact maker must be marked in accordance with requirements in subchapter J (Electrical Engineering Regulations) of this chapter.
There is no general alarm contact maker onboard.
46 CFR 97.37-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: A general alarm was installed at the operating station and tested.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 6 August 2024
Resolved
All self-propelled vessels shall have permanently exhibited for the guidance of the officer in charge of the vessel the following plans:General arrangement plans showing for each deck the fire control stations, the fire extinguishing appliances, means of access to different compartments, decks, etc., and the ventilating systems including particulars of the master fan controls, the positions of dampers, the location of the remote means of stopping fans, and identification numbers of the ventilating fans serving each section.
A general arrangement plan was not found onboard.
46 CFR 97.36-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: The general arrangement plan was printed and is kept in a binder onboard at the operating station.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 August 2024
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter.
IAW 46 CFR 112.05-5(a); The emergency lighting requirements of § 112.15-1 (b), (c), (f), and (g) must be met. Requirements of Subpart 112.39 must be met by the relay-controlled, battery-operated lanterns. Emergency power supply must be at least 6 hours.
Provide enough lights throughout machinery spaces to allow essential operations and observations under emergency conditions and to allow restoration of service. Provide at least one working light in the steering gear room.
46 CFR 90.25-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 September 2024
Resolved 15 November 2024
Resolution: All emergency lighting was tested and found satisfactory.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 April 2024
Resolved
Each vessel must undergo drydock and internal structural exams as per Table 91.40-3(a). The PACIFIC MARINE I was due for a dry dock and internal structural exam on March 31, 2024. The vessel is not permitted to operate until a dry dock and internal structural exam is completed.
46 CFR 91.40-3
Action required: 17 - Rectify deficiencies prior to departure
Due 1 May 2024
Resolved 6 August 2024
Resolution: The credit dry dock and ISE were completed in CNMI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 May 2023
Resolved
Each life buoy must be marked with VSL name. Marked VSL name on the new life buoys.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 4 May 2023
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 2 May 2023
Resolved
VSL must have Marine Charts of the operation area. Current charts are water damaged. Replace damaged marine charts.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 4 May 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 May 2023
Resolved
Life ring must have lifeline, non kinking, not less than 5/16" diameter. Replace deteriorated lifeline.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 5 May 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 2 May 2023
Resolved
Replace two portable CO2 with deteriorated exterior.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 5 May 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 2 May 2023
Resolved
Replace inoperable temperature gauge for STBD propulsion engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 May 2023
Resolved 5 May 2023
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 6 December 2022
Resolved
VSL sustained hull damage (12" weld crack)on top of the side wall of the cargo deck area, 2 FT from the engine room FWD BULKHD.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 December 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 31 March 2022
Resolved
Each life buoy must be marked with VSL name. Marked VSL name on the new life buoys.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2022
Resolved 5 April 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 31 March 2022
Resolved
Each life jacket must have have approved light attached to the front. Install missing lights and repair inoperable lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2022
Resolved 5 April 2022
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 March 2022
Resolved
Electrical installations must ensure maintenance of service necessary for safety under normal and emergency conditions. Repair ship generator and demonstrate proper operations.
Action required: 705 - Other - as specified
Resolved 14 June 2022
Resolution: Repairs are completed, operational test is SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 31 March 2022
Resolved
Repair inoperable RPM gauge for STBD propulsion engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2022
Resolved 13 April 2022
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 31 March 2022
Resolved
Remove oil absorbent pads from engine room bilge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2022
Resolved 5 April 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 31 March 2022
Resolved
Bilge pipe manifold must be labeled for each compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2022
Resolved 5 April 2022
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 14 March 2021
Resolved
Provide current Notice to Mariner publication.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 18 March 2021
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 March 2021
Resolved
Replace inoperable pressure gauge on fire pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 March 2021
Resolved 30 March 2021
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 14 March 2021
Resolved
Replace deteriorated hydraulic hose on head tank for steering hydraulic system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 30 March 2021
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 14 March 2021
Resolved
Unusual non - metallic noise from steering gear pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 30 March 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 March 2021
Resolved
Re-label missing breaker names on breaker panel in the wheel house.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 30 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 March 2021
Resolved
Attach missing life jacket lights on those life jackets identified without lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 18 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 March 2021
Resolved
Replace two ring life buoys with damaged outer protection cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 18 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 14 March 2021
Resolved
Missing 12 hand rocket parachute flares.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 18 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 March 2021
Resolved
Crew unable to demonstrate shut down on propulsion engines and generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 30 March 2021
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 14 March 2021
Resolved
Missing warning sign for ventilation blower breaker shut down for engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 30 March 2021
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 14 March 2021
Resolved
Medical certification for master is expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 30 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 March 2021
Resolved
Air filters for port & starboard propulsion engines are clogged.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2021
Resolved 30 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 September 2020
Resolved
Main propulsion engines must be suitable for intended service. Starboard engine sustained damage to cylinder head gasket. Conduct repairs I.A.W. engine manufacture procedure.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 October 2020
Resolution: Satisfactory repairs and sea trail.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 September 2020
Resolved
Starboard pulley on cargo ramp failed due to corroded fastener. Replace damage fastener with in-kind fastener and show proper ramp operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2020
Resolved 9 November 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 July 2020
Resolved
Replace damaged valve (FV-5) after engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 28 July 2020
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 July 2020
Resolved
Remove all flammables (paint, trash, carboards) from the engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 21 July 2020
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 17 July 2020
Resolved
Connect electrical wire to engine room light fixture.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 21 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 17 July 2020
Resolved
Install missing gauges for generator and propulsion engines in the engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 13 August 2020
Resolution: Conducted def check on missing gauges for both engines. Installation and tests were satisfactory
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 July 2020
Resolved
Provide proof of annual service performed for all fire fighting extinguishers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 21 July 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 July 2020
Resolved
Replace (03) damaged ring life buoys.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 21 July 2020
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 July 2020
Resolved
Repair air bound fire pump and demonstrate proper operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 21 July 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 17 July 2020
Resolved
Replace damaged gaskets for cargo deck manhole covers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2020
Resolved 21 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 June 2020
Resolved
Main propulsion shaft must be equivalent to standard established by ABS. VSL lost port shaft due to shaft failure (Broken). Replace port shaft with in-kind shaft and be prepared to conduct operational test to be attested by the attending MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2020
Resolution: Shaft was replaced with in-kind shaft; SS material, 9'8" in lenght with 2 1/2" diameter.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 21 March 2019
Resolved
VSL must meet radio installation in 47CFR80. Onboard SSB is nonoperational. Repair SSB and show proper operation to attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 27 March 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 March 2019
Resolved
At least have of life buoy must have CG approved self-igniting light as required by 46CFR199.70. Replace non CG approve light on life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 22 March 2019
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 March 2019
Resolved
VSL must be equipped with independent driven fire pump as required by 46CFR95.10-5. Repair non operational fire pump and show proper pump operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 22 March 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 March 2019
Resolved
Repair damaged and holes flexible non metallic hose on port fuel tank.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 22 March 2019
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 21 March 2019
Resolved
Install missing cutter pin on port hydraulic ram connecting pin.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 22 March 2019
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 21 March 2019
Resolved
Each life raft must be service annual as required by 46CFR199.190. Provide current proof of annual service conducted on life raft.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 27 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 June 2018
Resolved
Replace damaged hydraulic hose on hydraulic oil reservoir in STBD engine room.
Due 26 June 2018
Resolved 16 June 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 June 2018
Resolved
Repair wasted and holed exhaust muffler on port and STBD engines.
Due 26 June 2018
Resolved 19 June 2018
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 12 June 2018
Resolved
Replace wasted bulkhead penetration fitting on aft engine room bulkhead.
Due 26 June 2018
Resolved 16 June 2018
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 8 June 2017
Resolved
Stern light and anchor lights are inoperable. Conduct repairs and show proper light operations to MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 June 2017
Navigation › Piloting/Steering › Marine Charts
Issued 8 June 2017
Resolved
Missing marine charts. Provide up-to- date marine charts.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 June 2017
Lifesaving › Hand Flares › Quantity
Issued 8 June 2017
Resolved
Vessel requieres to have 6 red & 6 orange flares or 12 combinations as requried by 46 CFR 117.68. Found 8 day & night flares on board. Provide additional flares.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 June 2017
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 8 June 2017
Resolved
Ring life buoy must have a life line as required by 46 CFR 117.70(c). Install a 60', buoyant, non-kinking, dark color, life line to ring life buoy.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 June 2017
Electrical › Electric Supply System (service) › Battery Installation
Issued 8 June 2017
Resolved
Battery must be maintain in optimal condition for its service as required by 46 CFR 111.01-1. Replace low voltage battery for generator.
Due 22 June 2017
Resolved 20 June 2017
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 8 June 2017
Resolved
receptacle outlet must have plug opening uncovered as required by 46 CFR 111.79. Install missing outlet cover engine room forward bulkhead.
Due 22 June 2017
Resolved 20 June 2017
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 8 June 2017
Resolved
Engine room space must made of A-60 structure. Engine room over head where wires and tubes penetrate bulkhead deck to wheel house must meet A-60 requirements.
Due 21 June 2017
Resolved 20 June 2017
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 8 June 2017
Resolved
Vessel must have operable propulsion engine RPM gauges. Show proper operation of the RPM gauges in wheel house and engine room.
Due 21 June 2017
Resolved 20 June 2017
Construction/Loadline › Structures › Deck Plating
Issued 8 June 2017
Resolved
Found 9" crack on main deck, port side of wheel house. Repair crack IAW guidance on provided NVIC 7-68.
Due 21 June 2017
Resolved 20 June 2017
Fire Fighting › Remote Fuel Shutoff › General
Issued 8 June 2017
Resolved
Found inoperable emergency shutdown for port propulsion engine. Conduct repairs and show proper engine shut down operation.
Due 21 June 2017
Resolved 20 June 2017
Engineering › Sea-water System (primary cooling) › Piping
Issued 8 June 2017
Resolved
Wasted and holed salt water pipe to port engine exhaust muffler. Repair wasted pipe.
Due 21 June 2017
Resolved 20 June 2017
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 28 October 2016
Resolved
Missing hotline number for EAP display.
Due 30 November 2016
Resolved 1 December 2016
Resolution: Submitted proof of EAP display.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 28 October 2016
Resolved
Provide proof training for new crewmembers before assuming safety sensitive position.
Due 30 November 2016
Resolved 1 December 2016
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 28 October 2016
Resolved
Provide proof of 1 hour EAP training for supervisors/DER.
Due 30 November 2016
Resolved 30 November 2016
Resolution: Company rep submitted proof of supervisor/DER training.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 28 October 2016
Resolved
Missing SAP name and contact number
Due 30 November 2016
Resolved 1 December 2016
Resolution: Provided proof of local counselor contact number.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 20 October 2016
Resolved
Vessel sailed short in October 2016 trip from Saipan to Guam (short one deckhand).
Duration of voyage was 16 hours.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 October 2016
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 20 October 2016
Resolved
No proof of DAPI enrollment or negative drug test of vessel crew.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 28 October 2016
Resolution: DAPI audit completed this date. All sat.
Documentation › Certificates/Documents › FCC SSL
Issued 20 October 2016
Resolved
Vessel Captain could not provide FCC Radio Opertors license to USCG.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 March 2019
Communications › Alarms/Indicators › Bilge Alarm
Issued 20 October 2016
Resolved
Audible high water bilge alarm inopertive at operators station.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 October 2016
Engineering › Bilge Water Management System › Not Installed
Issued 20 October 2016
Resolved
No installed fixed bilge pump or manifold in aft steering compartment (lazarettte).
Action required: 705 - Other - as specified
Due 25 November 2016
Resolved 12 June 2018
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 20 October 2016
Resolved
Hydrostatic release unit was improperly installed. Vessel rep is to also provide expiration date of hydro-release unit.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 October 2016
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 20 October 2016
Resolved
Vessel missing second required lifebuoy light as required by COI.
Due 27 October 2016
Resolved 27 October 2016
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 20 October 2016
Resolved
Remove all oil and oily debris from lazarette/steering gear compartment.
Due 27 October 2016
Resolved 27 October 2016
Resolution: Temporary patches. Vessel will have make permanent repairs at Drydock to bulkhead.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 20 October 2016
Resolved
Aft machinery space bulkhead observed holed in various locations.
Bulkhead is required to be watertight.
Due 27 October 2016
Resolved 27 October 2016
Resolution: Temporary patches. Vessel will have make permanent repairs at Drydock to bulkhead.
Navigation › Piloting/Steering › Marine Charts
Issued 20 October 2016
Resolved
Charts for operating area (Saipan & Guam) were outdated and not corrected.
Vessel Captain was not familiar with using CG BNM's or chart corrections.
Due 27 October 2016
Resolved 27 October 2016
Navigation › Piloting/Steering › Coast Guard Light List
Issued 20 October 2016
Resolved
Tide Tables were also missing onboard.
Due 27 October 2016
Resolved 27 October 2016
Operations/Management › Drills/Instruction › Not Conducted
Issued 20 October 2016
Resolved
Captain was not able to provide records of completion for required emergency drills, trainging and musters (Sub W).
Due 27 October 2016
Resolved 27 October 2016
Deck/Cargo › Mooring/Anchoring › Anchor Shackle
Issued 20 October 2016
Resolved
Anchor shackles wasted and threads of pin rusted. Crew unable to unscrew pin.
Due 27 October 2016
Resolved 27 October 2016
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 October 2016
Resolved
Dead-end wiring under operators console (behind starboard hatch cover).
Due 27 October 2016
Resolved 27 October 2016
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 October 2016
Resolved
Broken deck railing on starboard quarter.
Due 27 October 2016
Resolved 27 October 2016
Operations/Management › Pollution › Control of Garbage
Issued 20 October 2016
Resolved
No records of shipboard garbage disposal.
Due 30 November 2016
Resolved 27 October 2016
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 20 October 2016
Resolved
PFD's observed padlocked in storage containers. Contractor equipment was also obstructing storage containers.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 October 2016
Engineering › Reduction Gearing/Clutches › Shaft
Issued 20 October 2016
Resolved
Vibration Dampner on Port tailshaft failed.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 October 2016
Electrical › Electric Generation Source (service) › Power Requirement
Issued 20 October 2016
Resolved
Explain purpose of micro-switches installed on both main propulsion engines.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 October 2016
Resolution: Micro-switches were removed.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 20 October 2016
Resolved
Starboard navigation light cover is bent and obstructing arc of visibility of light.
Due 4 November 2016
Resolved 27 October 2016
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 20 October 2016
Resolved
Amber stern towing light inoperative.
Due 25 November 2016
Resolved 12 June 2018
Resolution: Need proper vertical filament bulb instead of round bulb.
Deck/Cargo › Cargo Stowage › General
Issued 20 October 2016
Resolved
Cargo on deck appears to violate conditions of COI for carrying cargo. Vessel rep to provide information to CG Marine Inpector on how current cargo configuration meets allowable Stability parimeters.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2016
Resolved 27 October 2016
Resolution: 20' Container was removed at Port of Guam. Generator was relocated.
Fire Fighting › Fire Main › Condition
Issued 20 October 2016
Resolved
Soft on fire main piping. Also observed leaking.
Action required: 705 - Other - as specified
Due 25 November 2016
Resolved 12 June 2018
Engineering › Bilge Water Management System › Piping
Issued 20 October 2016
Resolved
Soft patches on bilge piping in machinery space, in way of starboard main propulsion engine.
Action required: 705 - Other - as specified
Due 25 November 2016
Resolved 12 June 2018
Communications › Audible Communications › Bell
Issued 13 March 2016
Resolved
Vessel shall have operational bell as required by NAV Rules. Repair and demonstrate proper bell operation.
Due 28 March 2016
Resolved 15 March 2016
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 13 March 2016
Resolved
All hand fire extinguisher shall be service annual as required by NFPA. Found service tag on 5-portable CO2s with last service 01 Mar 2015.
Due 28 March 2016
Resolved 17 March 2016
Electrical › Lighting (emergency) › Lighting Fixture
Issued 13 March 2016
Resolved
Engine room shall have emergency light system as required by 46 CFR 112.43. Found inoperable emergency light in engine room. Repair and demonstrate proper emergency light operation.
Due 28 March 2016
Resolved 15 March 2016
Electrical › Lighting (service) › Lighting Fixture
Issued 13 March 2016
Resolved
Found light fixture in steering gear compartment missing light bulb and protective cover. Repair and demonstrate proper light operation as required by 46 CFR 111.75
Due 28 March 2016
Resolved 17 March 2016
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 13 March 2016
Resolved
Vessel must have first aid kit with up-to-date contents as required by 46 CFR108.707. replace all identified items with expired dates.
Due 28 March 2016
Resolved 16 March 2016
Lifesaving › Lifejacket/PFD (Type II) › Marking
Issued 13 March 2016
Resolved
Lifejacket shall be marked with the name of vessel as required by 46 CFR 91.25-15. Marked all child lifejackets with vessel name.
Due 28 July 2016
Resolved 16 March 2016
Lifesaving › Lifebuoys › Serviceable
Issued 13 March 2016
Resolved
Found dried and deteriorated grab lines on 3- lifebuoys. Replace grab lines with in-kind material. 46 CFR 199.211
Due 28 March 2016
Resolved 17 March 2016
Engineering › Steering Gear System › Hydraulic Hose
Issued 13 March 2016
Resolved
Hydraulic hose shall not be subjected to twisting as required by 46 CFR 58.30-20. Re- install steering hydraulic hose on the support brackets and away from the bilge.
Due 28 March 2016
Resolved 17 March 2016
Navigation › Collision/Grounding Avoidance › Day Shapes
Issued 13 March 2016
Resolved
Vessel must have proper day shapes for towing evolution as required by NAV RULES. Provide proper day shapes for towing on board.
Due 28 March 2016
Resolved 17 March 2016
Communications › Radio Communications › VHF Radiotelephone
Issued 13 March 2016
Resolved
Vessel operates within Sea Area A1 must upgrade to VHF-DSC radio as required by 47CFR80.905 & MSIB 15-15.
Due 13 June 2016
Resolved 12 June 2018