Records from 2013 to 2026. Most recent: inspection, 19 January 2026.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.0 ft
Registered tonnagegross 705 / net 705
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · CARUTHERSVILLE, MO, UNITED STATES · built 2013
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 December 2025 · expires 31 January 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it705 - Simplified, Gross Ton
705 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
19 January 2026
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8298348
9 May 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7909338
26 December 2023
Internal Structural Exam · MTSA Verification · Examination of Repairs · COI Inspection · Drydock Exam · Cargo Tank Internal
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7842587
4 April 2019
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6656086
18 January 2019
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6612104
17 January 2019
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6612008
20 December 2018
Examination of Repairs · Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6599602
25 September 2018
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6552706
2 January 2018
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6332357
6 November 2017
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6321511
31 January 2017
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6086477
30 November 2015
Periodic Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5772384
14 October 2014
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5058318
31 March 2014
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4825990
22 March 2014
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4821824
21 March 2014
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4987347
8 November 2013
Initial Construction-Excluding Oversight · MTSA Verification · Internal Structural Exam · Administrative Inspection · Drydock Exam · Cargo Tank Internal · Initial Certification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4760891
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other cargo/timber/deck/construction
Issued 17 January 2019
Resolved
Vessel operator reported a leak discovered on the above cargo tank pipeline. O/O to make temp repair to allow safe transit to local repair shipyard (Houston, TX) and complete permanent repairs to the satisfaction of the attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 January 2019
Resolved 22 January 2019
Resolution: Witnessed satifactory Hydro-test to cargo tank pipe line.
Deck/Cargo › Towing › Tackle
Issued 22 March 2014
Resolved
Replace timber head on stern that was pulled off during grounding. No damage to deck noted during inspection.
Action required: 705 - Other - as specified
Due 22 April 2014
Resolved 31 March 2014
Resolution: Timber head replaced.