Records from 2001 to 2026. Most recent: inspection, 2 June 2026.
Documentation record
Registered dimensions (L × B × D)53.5 ft × 20.0 ft × 4.9 ft
Registered tonnagegross 48 / net 42
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCOLLINS SEAFOOD INC · LAROSE, LA, UNITED STATES · built 1974
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 30 September 2025 · expires 30 September 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it48 - Regulatory (Subpart C or D), Gross Ton
42 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
2 June 2026
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8387631
8 May 2025
Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8131189
22 April 2024
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7921529
14 July 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7744739
19 September 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7562262
9 August 2021
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7281943
21 April 2020
Initial Certification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6943453
5 August 2010
Industry Initiated Exam · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3815470
3 August 2010
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3814177
3 August 2010
Spot Check (Safety)
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3814254
3 August 2010
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3815601
3 March 2004
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 2017505
18 February 2001
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 1522376
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 September 2022
Resolved
Improper gasket material was found on door leading into engine space. Replace gasket material with firm rubber material.
46 CFR 140.610 (b)
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2022
Resolved 21 September 2022
Resolution: Received photographic evidence from vessel rep of repaired gasket
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 September 2022
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists. The low hydraulic steering fluid level alarm was inoperable.
46 CFR 143.230(a)(6)
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2022
Resolved 21 September 2022
Resolution: Vsl rep sent video of low hydraulic steering alarm operating.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 September 2022
Resolved
A fixed fire pump must be capable of a pressure of 50 psi. Fire pump only reached a pressure of 35 psi.
46 CFR 142.325(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2022
Resolved 3 January 2023
Resolution: Vessel rep provided photographic evidence of fire pump being installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 August 2021
Resolved
Each towing vessel shall be maintained and operated to minimize fire hazards and ensure the bilge are kept free from accumulation of combustible and flammable materials. The starboard generator was leaking diesel fuel from the fuel injector onto a soaked absorbent pad that was touching the generator.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 August 2021
Resolution: Vessel had a tech onsite as MI were leaving. Tech replaced the crush washers for the high pressure fuel line and tested generator.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 9 August 2021
Resolved
A fixed fire pump must be capable of delivering water from the two highest hydrants at 50 PSI and flow rate of 80 gallons per minute. Vessel's fire pump gauge shows 30 PSI at the pump with fire station operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 17 December 2021
Resolution: New single phase pump installed and tested w/o a pressure gauge.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 August 2021
Resolved
At least two lifebuoys on a towing vessel greater than 26ft must be fitted with a floating electric water light and each life buoy with a floating electric water light must have a lanyard of 3-6 ft. Vessel only had one floating electric water light and the light was directly connected to the lifebuoy w/o 3-6 ft of line.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: The light with proper line was attached to the ring buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 9 August 2021
Resolved
All lifesaving equipment must be tested and maintained IAW 199.190 with all inspections and tests of lifesaving must be recorded in the TVR, official log or IAW TSMS. Vessel has not done any lifesaving equipment checks nor maintained any records for lifesaving.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: Logs have been started sat.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 9 August 2021
Resolved
The EPRIB must be stowed in its float-free bracket with controls set for automatic activation and be mounted so it will float free. Vessel did not have the hydrostatic release marked with its expiration date.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: The hydrostatic release was instaled properly.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 9 August 2021
Resolved
All fire extinguishing systems and fire detection systems shall be inspected, maintained and tested IAW Chapter 7 & 8 of NFPA 10 and recorded in the TVR, offical logbook, or IAW TSMS. Vessel had not been inspecting fire extinguishing systems monthly nor maintained records for monthly maintenance.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: Logs have been started properly.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 9 August 2021
Resolved
Company shall ensure that refresher training must be repeated annually and may be covered over time. Vessel personal were not aware of training requirement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: Company has developed a plan for training.
10 - Safety of Navigation › N/A - No Subsystem › Monitoring of voyage or passage plan
Issued 9 August 2021
Resolved
The officer in charge of a navigational watch (OICNW) shall conduct a navigation assessment for the intended route and ops prior to getting underway. Vessel's OICNW
have not been conducting and logging the required navigation assessments when compared to the logbook record of operations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: Vessel developed a Nav assessment that covers the requirements.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 9 August 2021
Resolved
Vessel shall meet the communication requirements of 33 CFR 164.72. Vessel did not have the MMSI number programed into the radios nor did the vessel have a radio safety equipment certificate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: The MMSI was programmed in to the radio
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 9 August 2021
Resolved
Vessels subject to the Bridge-to-Bridge act must have on board a radio operator who holds a restricted radiotelephone operator permit or higher class license. Vessel's captain did not have a restricted license or higher. 47 CFR 80.163
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: A new Captain was placed on the vessel.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 9 August 2021
Resolved
Vessel must be operated IAW applicable laws and regs to afford protection against hazards to life, property, and environment. Vessel's septic system was spraying the machinery space and flowing into the vessel's bilge.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: The septic system was repaired and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 9 August 2021
Resolved
Gauges must be equipped at the machinery location for both MDE. Both Port and Starboard MDE did not have RPM gauge installed in the machinery location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 12 January 2022
Resolution: Gauges installed and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2021
Resolved
Essential systems or equipment must be regularly examined and if a component is found unsatisfactory, it must be repaired or replaced. Three (3) cotter pins were missing from the rudder's steer gear.
Action required: 10 - Deficiency Rectified
Due 8 September 2021
Resolved 9 August 2021
Resolution: Vessel placed cotter pins into the rudder assembly during inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 August 2021
Resolved
Electrical systems must minimize system failure, fire and shock hazards. Vessel's port machinery room electrical outlets requires a cover over the outlets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2021
Resolved 13 January 2022
Resolution: Cover installed over outlet.