ASTOMOS EARTH is a 2012 tank ship. The Coast Guard has recorded 12 inspections since 2016, most recently in February 2026, along with 9 deficiencies and 1 operational control.
Records from 2016 to 2026. Most recent: inspection, 2 February 2026.
- Built
- 2012
- Last inspected
- 2 February 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 9 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9607069 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3FZF2
1269386
Flag
PANAMA
—
Maury page id
psix-1269386
Inspections, by type
Years with a record
9 calendar years (2016–2026)
The 12 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it47950 - Convention (Subpart B), Gross Ton
55251 - Dead Weight, Metric Ton
73635 - Displacement, Metric Ton
14385 - Convention (Subpart B), Net Ton
55251 - Dead Weight, Metric Ton
73635 - Displacement, Metric Ton
14385 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 12
2 February 2026
Administrative Inspection · PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8301092
16 October 2025
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8247131
27 January 2025
COC-GAS Renew · PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8069931
4 October 2023
PSC B · COC-GAS Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7803170
20 November 2022
COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7595387
12 October 2021
COC-GAS Annual · Deficiency Check · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7323769
31 July 2020
COC-GAS Renew · PSC B · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7018432
2 March 2019
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6631985
2 March 2019
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6727696
20 September 2017
Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6267182
14 March 2017
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6104524
16 June 2016
ISPS II Exam · COC-GAS Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5906117
Deficiency record · 9
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 27 January 2025
Resolved
IN MEETING THESE REQUIREMENTS, THE COMPANY SHOULD ENSURE THAT 1. INSPECTIONS ARE HELD AT REQUIRED INTERVALS, 2. ANY NON-COMFORMITY IS REPORTED, WITH ITS POSSIBLE CAUSE, IF KNOWN, 3. APPROPRIATE CORRECTIVE ACTION IS TAKEN, AND 4. RECORDS OF THESE ACTIVITIES ARE MAINTAINED. THE TECHNICAL AND OPERATIONAL NATURE OF DEFICIENCIES 01, 02, 03, 04, 05, 06, AND 07 PROVIDE OBJECTIVE EVIDENCE OF A SERIOUS FAILURE OR LACK OF EFFECTIVENESS OF THE IMPLEMENTATION OF THE ISM CODE. A SAFETY MANAGEMENT AUDIT CARRIED OUT BY THE ADMINISTRATION, OR THE RO, WITH A COORESPONDING REPORT OF FINDINGS SATISFACTORY TO THE OCMI MUST BE SUBMITTED PRIOR TO THE CLEARANCE OF THESE DEFICEINCIES AND RELEASE FROM DETENTION.
74SOLAS(20) IX/13.1
ISM 10.1
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025
Resolved
GAS DETECTION EQUIPMENT SHOULD BE SO DESIGNED THAT IT MAY BE READILY TESTED. TESTING AND CALIBRATION SHOULD BE CARRIED OUT AT REGULAR INTERVALS. PSCO OBSERVED THAT WHILE TESTING THE SYSTEM THE PNEUMATIC LINE BETWEEN THE SUCTION PUMP AND THE POSIITON SELECTOR DEVICE WAS TAPED INTO PLACE, DUE TO IMPROPER TUBING SIZE AND BROKEN T-FITTING. THIS WAS DISCOVERED AFTER MULTIPLE ATTEMPTS WERE MADE TO GET AN ACCURATE TEST GAS READING OF 7.5% LEL BUT ONLY A MAX OF 5.5% LEL WAS OBSERVED.
74SOLAS(20) VII/13.1
93 IGC 13.6.6
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025
Resolved
THE CHANGNING OF THE SET PRESSURE UNDER THE PROVISIONS OF 8.2.6, AND THE COORESPONDING RESETTING OF THE ALARMS REFERRED TO IN 13.4.1, SHOULD BE CARRIED OUT UNDER THE SUPERVISION OF THE MASTER IN ACCORDANCE WITH PROCEDURES APPROVED BY THE ADMINISTRATION AND SPECIFIED IN THE SHIP'S OPERATING MANUAL. DURING THE COC EXAMINATION THE PSCO OBSERVED THE 0.050mPa GUAGE, IN HARBOUR, INSTALLED ON ALL OF THE CARGO TANK RELIEF VALVES. THE PSCO OBSERVED THAT THERE WAS AGED PAINT CONVERING THE MATING SURFACE BETWEEN THE AUXILLARY SETTING DEVICE AND THE PILOT ON CARGO TANKS NUMBER 2 AND 3, ON THE PORT SIDE, INDICIATING IT HAD BEEN RECENTLY REMOVED OR INSTALLED. THE SHIP'S RECORDS INDICATE THAT THE LAST TIME THE AUXILLARY SETTING DEVICES WERE REMOVED WAS ON 25DEC2024 WITH NO RECORD OF THEM BEING REINSTALLED. BASED ON THESE LOGS, PAINTED MATING SURFACES, AND STATEMENTS BY THE CREW, THE AUXILLARY SETTING DEVICES WERE INSTALLED, AND THE VESSEL OPERATED WITH THE INCREASED "IN HARBOUR" SETTINGS PRIOR TO THEIR ARRIVAL INTO PORT.
74 SOLAS (20) VIII/13.1
93 IGC 8.2.7
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025
Resolved
THE CONTROL SYSTEM SHOULD ALSO BE PROVIDED WITH FUSIBLE ELEMENTS DESIGNED TO MELT AT TEMPERATURES BETWEEN 98 DEGREES CELCIUS AND 104 DEGREES CELCIUS WHICH WILL CAUSE THE EMERGENCY SHUTDOWN VALVES TO CLOSE IN THE EVENT OF FIRE. PSCO OBSERVED FUSIBLE PLUGS ON PORT AND STARBOARD MANIFOLDS WERE PAINTED OVER. EXTENSIVE CORROSION THAT ENCAPSULATED THE FUSIBLE PLUGS WERE OBSERVED ON TANKS 2, 3, AND 4.
74 SOLAS(20) VII/13.1
93 IGC 5.6.4
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025
Resolved
THE VESSEL'S WATER-SPRAY SYSTEM SHOULD BE CAPABLE OF COVERING ALL REQUIRED AREAS, TO INCLUDE EXPOSED CARGO TANK DOMES, WITH A UNIFORMLY DISTRIBUTED WATER SPRAY OF AT LEAST 10 L/M² PER MINUTE FOR HORIZONTAL PROJECTED SURFACES. AT THE #1 CARGO TANK TOP, PSCO OBSERVED 5 OF THE 6 WATER-SPRAY NOZZLES CLOGGED AND UNABLE TO PROVIDE UNIFORM, ADEQUATE WATER-SPRAY TO THE HORIZONTAL SURFACE OF THE TANK TOP. AFTER ALLOWING THE CREW TIME TO CLEAR NOZZLES, A RETEST OF THE SYSTEM FOUND 3 NOZZLES STILL PROVIDING INADEQUATE COVERAGE OF THE TANK TOP.
74 SOLAS(2020)
VII/13.1
93 IGC 11.3.2
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025
Resolved
THE CLOSURE TIME OF 30S FOR THE EMERGENCY SHUTDOWN VALVE REFERRED TO IN 5.6.4 SHOULD BE MEASURED FROM THE TIME OF MANUAL OR AUTOMATIC INITIATION TO FINAL CLOSURE. PSCO OBSERVED BOTH PORT AND STARBOARD MANIFOLD LINES HAVE VALVES THAT EXCEEDED 30S AS WELL AS 2 VALVES ON PORT SIDE WITH CLOSURE AT 14S & 20S. IN SHIPS MANUAL FZ8-UF1301F IT STATES "7 VALVES OF (P) OR (S) AT ONE SIDE ARE CLOSED IN 30 SECONDS WITHOUT EXCEPTION.
24 SOLAS(2020)
VII/13.1
93 IGC 5.6.5
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025
Resolved
FLANGES, VALVES, AND OTHER FITTINGS SHOULD COMPLY WITH RECOGNIZED STANDARDS. THE SOCIETY OF INTERNATIONAL GAS TANKER AND TERMINAL OPERATORS LTD. (2ND EDITION, 2023) STATES THAT VALVES SHOULD HAVE A LOCAL VISUAL INDICATION OF THE CLOSING ELEMENT. PSCO OBSERVED THE FOLLOWING VALVES MISSING A VISUAL INDICATION OF CLOSURE: L103, L104, L105, L203, L204, L205, L303, L304, L305, L403.
74 SOLAS(2020)
VII/13.1
93 IGC 5.2.4.4
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 12 October 2021
Resolved
On ships carrying flammable products a water-spray system for cooling, fire prevention, and crew protection should be installed to cover loading manifolds and the area of their control valves. PSCO witnessed 4 clogged nozzles on the starboard manifold.
IGC Code (93) 11.3.1.3
10c
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 12 October 2021
Resolved
Hand hose lines and nozzles should be of weather-resistant construction or stored in weather-resistant housing or covers and be readily accessible. PSCO witnessed hydraulic arm that opens the weather resistant housing was rusted which prevented cover to open and be readily accessible.
IGC Code(93) 11.4.5
10c
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,