ASTOMOS EARTH is a 2012 tank ship. The Coast Guard has recorded 12 inspections since 2016, most recently in February 2026, along with 9 deficiencies and 1 operational control.
Records from 2016 to 2026. Most recent: inspection, 2 February 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it47950 - Convention (Subpart B), Gross Ton 55251 - Dead Weight, Metric Ton 73635 - Displacement, Metric Ton 14385 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 12
2 February 2026Administrative Inspection · PSC B · COC-GAS Annual
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 27 January 2025Resolved
IN MEETING THESE REQUIREMENTS, THE COMPANY SHOULD ENSURE THAT 1. INSPECTIONS ARE HELD AT REQUIRED INTERVALS, 2. ANY NON-COMFORMITY IS REPORTED, WITH ITS POSSIBLE CAUSE, IF KNOWN, 3. APPROPRIATE CORRECTIVE ACTION IS TAKEN, AND 4. RECORDS OF THESE ACTIVITIES ARE MAINTAINED. THE TECHNICAL AND OPERATIONAL NATURE OF DEFICIENCIES 01, 02, 03, 04, 05, 06, AND 07 PROVIDE OBJECTIVE EVIDENCE OF A SERIOUS FAILURE OR LACK OF EFFECTIVENESS OF THE IMPLEMENTATION OF THE ISM CODE. A SAFETY MANAGEMENT AUDIT CARRIED OUT BY THE ADMINISTRATION, OR THE RO, WITH A COORESPONDING REPORT OF FINDINGS SATISFACTORY TO THE OCMI MUST BE SUBMITTED PRIOR TO THE CLEARANCE OF THESE DEFICEINCIES AND RELEASE FROM DETENTION.
74SOLAS(20) IX/13.1
ISM 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 28 January 2025
Resolved 29 January 2025
Resolution: PSCO returned onboard, satisfactory audit was conducted, no further action needed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025Resolved
GAS DETECTION EQUIPMENT SHOULD BE SO DESIGNED THAT IT MAY BE READILY TESTED. TESTING AND CALIBRATION SHOULD BE CARRIED OUT AT REGULAR INTERVALS. PSCO OBSERVED THAT WHILE TESTING THE SYSTEM THE PNEUMATIC LINE BETWEEN THE SUCTION PUMP AND THE POSIITON SELECTOR DEVICE WAS TAPED INTO PLACE, DUE TO IMPROPER TUBING SIZE AND BROKEN T-FITTING. THIS WAS DISCOVERED AFTER MULTIPLE ATTEMPTS WERE MADE TO GET AN ACCURATE TEST GAS READING OF 7.5% LEL BUT ONLY A MAX OF 5.5% LEL WAS OBSERVED.
74SOLAS(20) VII/13.1
93 IGC 13.6.6
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 28 January 2025
Resolved 29 January 2025
Resolution: PSCO returned and found vessel to be satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025Resolved
THE CHANGNING OF THE SET PRESSURE UNDER THE PROVISIONS OF 8.2.6, AND THE COORESPONDING RESETTING OF THE ALARMS REFERRED TO IN 13.4.1, SHOULD BE CARRIED OUT UNDER THE SUPERVISION OF THE MASTER IN ACCORDANCE WITH PROCEDURES APPROVED BY THE ADMINISTRATION AND SPECIFIED IN THE SHIP'S OPERATING MANUAL. DURING THE COC EXAMINATION THE PSCO OBSERVED THE 0.050mPa GUAGE, IN HARBOUR, INSTALLED ON ALL OF THE CARGO TANK RELIEF VALVES. THE PSCO OBSERVED THAT THERE WAS AGED PAINT CONVERING THE MATING SURFACE BETWEEN THE AUXILLARY SETTING DEVICE AND THE PILOT ON CARGO TANKS NUMBER 2 AND 3, ON THE PORT SIDE, INDICIATING IT HAD BEEN RECENTLY REMOVED OR INSTALLED. THE SHIP'S RECORDS INDICATE THAT THE LAST TIME THE AUXILLARY SETTING DEVICES WERE REMOVED WAS ON 25DEC2024 WITH NO RECORD OF THEM BEING REINSTALLED. BASED ON THESE LOGS, PAINTED MATING SURFACES, AND STATEMENTS BY THE CREW, THE AUXILLARY SETTING DEVICES WERE INSTALLED, AND THE VESSEL OPERATED WITH THE INCREASED "IN HARBOUR" SETTINGS PRIOR TO THEIR ARRIVAL INTO PORT.
74 SOLAS (20) VIII/13.1
93 IGC 8.2.7
Condition: Placed in Improper Service
Action required: 30 - Ship detained
Due 28 January 2025
Resolved 29 January 2025
Resolution: PSCO returned and found vessel to be satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025Resolved
THE CONTROL SYSTEM SHOULD ALSO BE PROVIDED WITH FUSIBLE ELEMENTS DESIGNED TO MELT AT TEMPERATURES BETWEEN 98 DEGREES CELCIUS AND 104 DEGREES CELCIUS WHICH WILL CAUSE THE EMERGENCY SHUTDOWN VALVES TO CLOSE IN THE EVENT OF FIRE. PSCO OBSERVED FUSIBLE PLUGS ON PORT AND STARBOARD MANIFOLDS WERE PAINTED OVER. EXTENSIVE CORROSION THAT ENCAPSULATED THE FUSIBLE PLUGS WERE OBSERVED ON TANKS 2, 3, AND 4.
74 SOLAS(20) VII/13.1
93 IGC 5.6.4
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 28 January 2025
Resolved 29 January 2025
Resolution: PSCO returned and found vessel to be satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025Resolved
THE VESSEL'S WATER-SPRAY SYSTEM SHOULD BE CAPABLE OF COVERING ALL REQUIRED AREAS, TO INCLUDE EXPOSED CARGO TANK DOMES, WITH A UNIFORMLY DISTRIBUTED WATER SPRAY OF AT LEAST 10 L/M² PER MINUTE FOR HORIZONTAL PROJECTED SURFACES. AT THE #1 CARGO TANK TOP, PSCO OBSERVED 5 OF THE 6 WATER-SPRAY NOZZLES CLOGGED AND UNABLE TO PROVIDE UNIFORM, ADEQUATE WATER-SPRAY TO THE HORIZONTAL SURFACE OF THE TANK TOP. AFTER ALLOWING THE CREW TIME TO CLEAR NOZZLES, A RETEST OF THE SYSTEM FOUND 3 NOZZLES STILL PROVIDING INADEQUATE COVERAGE OF THE TANK TOP.
74 SOLAS(2020)
VII/13.1
93 IGC 11.3.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 January 2025
Resolved 29 January 2025
Resolution: PSCO returned and found vessel to be satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025Resolved
THE CLOSURE TIME OF 30S FOR THE EMERGENCY SHUTDOWN VALVE REFERRED TO IN 5.6.4 SHOULD BE MEASURED FROM THE TIME OF MANUAL OR AUTOMATIC INITIATION TO FINAL CLOSURE. PSCO OBSERVED BOTH PORT AND STARBOARD MANIFOLD LINES HAVE VALVES THAT EXCEEDED 30S AS WELL AS 2 VALVES ON PORT SIDE WITH CLOSURE AT 14S & 20S. IN SHIPS MANUAL FZ8-UF1301F IT STATES "7 VALVES OF (P) OR (S) AT ONE SIDE ARE CLOSED IN 30 SECONDS WITHOUT EXCEPTION.
24 SOLAS(2020)
VII/13.1
93 IGC 5.6.5
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 January 2025
Resolved 29 January 2025
Resolution: PSCO returned and found vessel to be satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 January 2025Resolved
FLANGES, VALVES, AND OTHER FITTINGS SHOULD COMPLY WITH RECOGNIZED STANDARDS. THE SOCIETY OF INTERNATIONAL GAS TANKER AND TERMINAL OPERATORS LTD. (2ND EDITION, 2023) STATES THAT VALVES SHOULD HAVE A LOCAL VISUAL INDICATION OF THE CLOSING ELEMENT. PSCO OBSERVED THE FOLLOWING VALVES MISSING A VISUAL INDICATION OF CLOSURE: L103, L104, L105, L203, L204, L205, L303, L304, L305, L403.
74 SOLAS(2020)
VII/13.1
93 IGC 5.2.4.4
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 28 January 2025
Resolved 29 January 2025
Resolution: PSCO returned and found vessel to be satisfactory.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 12 October 2021Resolved
On ships carrying flammable products a water-spray system for cooling, fire prevention, and crew protection should be installed to cover loading manifolds and the area of their control valves. PSCO witnessed 4 clogged nozzles on the starboard manifold.
IGC Code (93) 11.3.1.3
10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 October 2021
Resolved 12 October 2021
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 12 October 2021Resolved
Hand hose lines and nozzles should be of weather-resistant construction or stored in weather-resistant housing or covers and be readily accessible. PSCO witnessed hydraulic arm that opens the weather resistant housing was rusted which prevented cover to open and be readily accessible.
IGC Code(93) 11.4.5
10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 October 2021
Resolved 12 October 2021
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.