MAURY USCG vessel records
← All vessels

JAMES JOSEPH

JAMES JOSEPH is a 2014 tank barge. The Coast Guard has recorded 22 inspections since 2014, most recently in March 2026, along with 38 deficiencies.

Records from 2014 to 2026. Most recent: inspection, 24 March 2026.

Built
2014
Last inspected
24 March 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 24 March 2026
Operational controls None recorded without a removal date
Years with a record 12 calendar years (2014–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

1270804
Flag
UNITED STATES
Maury page id
psix-1270804

Documentation record

Registered dimensions (L × B × D)214.0 ft × 40.0 ft × 12.0 ft
Registered tonnagegross 867 / net 867
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMAY SHIP REPAIR CONTRACTING CORP · STATEN ISLAND, NY, UNITED STATES · built 2014
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 4 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it867 - Simplified, Gross Ton
867 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

22 inspections, each with its date, unit and type; 38 deficiencies with the resolution recorded against each; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 22

24 March 2026 Annual Survey · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8330328
10 June 2025 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8156235
12 December 2024 Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8046709
20 June 2024 Drydock Exam · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7937492
4 May 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7907477
26 February 2024 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7870051
20 April 2023 Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7672098
16 March 2023 MTSA Verification · Deficiency Check · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7651461
14 March 2022 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7411213
22 March 2021 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7160496
8 March 2021 Administrative Inspection
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7151945
4 September 2020 Exemption · Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7049339
27 May 2020 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6961824
27 December 2019 Administrative Inspection · Deficiency Check · COI Inspection · Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6879693
17 January 2019 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6611553
25 September 2018 Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6547936
17 September 2018 Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6542930
2 April 2018 Periodic Inspection · Administrative Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6383680
26 April 2017 Administrative Inspection · In-Service Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6133610
28 February 2017 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6095837
29 March 2016 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5842576
18 February 2014 MTSA Verification · Construction Oversight · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4812030

Deficiency record · 38

07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 March 2026 Resolved
The owner, master, or person-in-charge of a tank vessel must ensure that portable and semi-portable extinguishers are inspected and maintained in accordance with NFPA 10. During the inspection of the cargo pump prime mover space one fire extinguisher gauge was discovered in the red. Satisfactory evidence could not be provided of adequate monthly servicing. Replace/renew fire extinguisher identified during inspection and provide sufficient documentation (photo/email statement)once it is back on station and ready for immediate use.46 CFR 31.10-18(a) NFPA 10
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 March 2026
Resolution: Barge provided images showing fire extingsuisher back on station and ready for immediate use.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 7 January 2025 Resolved
No person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel tests and inspects the equipment. Vessel representatives presented hose test records attesting to insufficient test psi. (150spi) for both port and starboard cargo hoses and the vapor hose. Prior to transfer operations ensure all cargo hoses are tested to the required psi (1.5x MAWP) Test target based on service pressure of 200psi is 300psi. Provide documentation attesting to sufficient hose test.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 January 2025
Resolution: Received satisfactory certificate attesting to 1.5x MAWP at 300 psi.Vsl will proivded documentation for other hoses on board.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 7 January 2025 Resolved
Cargo operations shall be fully recorded without delay in the Oil Record Book so that all the entries in the book appropriate to that operation are completed. Each completed operation shall be signed by the person or persons in charge of the operations concerned and each completed page shall be signed by the master or other person having charge of the ship. Oil Record Book entries were found to be incomplete and missing required signatures. Provide objective evidence of proper entry and maintenance of the Oil Record Book.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 February 2025
Resolved 13 February 2025
Resolution: Subsequent oil record book entries sighted as correct.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 January 2025 Resolved
The cargo tank safety relief valves shall be inspected at least once in every 2 years. The safety relief valve discs must be lifted from their seats in the presence of a marine inspector by either liquid, gas, or vapor pressure at least once every 5 years to determine the accuracy of adjustment and, if necessary, must be reset. Vessel did not have documentation of recent testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 February 2025
Resolved 3 March 2025
Resolution: Objective evidence of completion of testing received.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 7 January 2025 Resolved
On a tank barge, each cargo tank must be equipped with an overfill device. The aft cargo tank meter stick was found inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2025
Resolved 10 January 2025
Resolution: Recieved video evidence of all meter sticks working properly.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 7 January 2025 Resolved
All cargo tank hatches must be clearly marked in not less than three inch lettering “Danger—Keep Out”. Cargo tank hatches were not labeled "Danger-Keep Out".
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 February 2025
Resolved 13 February 2025
Resolution: Warning signs labeled IAW requirements
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 February 2024 Resolved
Markings. Each lifebuoy must be marked in block capital letters with the name of the vessel required to be marked. 1 Lifebuoy was found with faded lettering.46CFR199.70(a)2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 26 February 2024
Resolved 26 February 2024
Resolution: [name withheld] to send picture of stenciled life buoy
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 20 April 2023 Resolved
The District Commander or Captain of the Port determines that the vessel does not satisfy the conditions for vessel operation and cargo transfers specified in 160.113. FW Rake Port side hatch cover missing dog. Hatch is bent and not making a watertight seal. 33CFR160.111(b)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 28 April 2023
Resolved 28 April 2023
Resolution: replaced dog and bent back hatch. all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 20 April 2023 Resolved
The District Commander or Captain of the Port determines that the vessel does not satisfy the conditions for vessel operation and cargo transfers specified in 160.113. AFT Rake STBD Side hatch missing dog. 33cfr160.111(b)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 28 April 2023
Resolved 28 April 2023
Resolution: replaced missing dog.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 20 April 2023 Resolved
The District Commander or Captain of the Port determines that the vessel does not satisfy the conditions for vessel operation and cargo transfers specified in 160.113. 4S VOID: missing dog and bent latching bracket. 33 CFR 160.111(b)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 28 April 2023
Resolved 28 April 2023
Resolution: replaced dog and latching bracket. all sat
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 20 April 2023 Resolved
The District Commander or Captain of the Port determines that the vessel does not satisfy the conditions for vessel operation and cargo transfers specified in 160.113. 3S Void: Dog on void hatch missing 33cfr160.111(b)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 28 April 2023
Resolved 28 April 2023
Resolution: replaced dog, all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 20 April 2023 Resolved
The District Commander or Captain of the Port determines that the vessel does not satisfy the conditions for vessel operation and cargo transfers specified in 160.113. 2P Void: Dog on void hatch bent. 33CFR160.111(b)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 28 April 2023
Resolved 28 April 2023
Resolution: replaced dog, all sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 16 March 2023 Resolved
Cargo pump relief valves and pressure gauges may be omitted, however, a suitable device shall be fitted to stop the pumping before the designed pressure of the pipping is exceeded. Barge did not have letter attesting that the cargo pump doesn't exceed the MAWP of the cargo piping. Barge must provide letter prior to cargo discharge operations. 46 CFR 36.10-1
Action required: 705 - Other - as specified
Due 31 March 2023
Resolved 17 March 2023
Resolution: Provided letter attesting to the cargo pump max pressure not exceeding the MAWP of the cargo piping.
04 - Emergency Systems › N/A - No Subsystem › Emergency towing arrangements and procedures
Issued 16 March 2023 Resolved
If you are the owner or operator of a tank barge or a vessel towing it and this section applies to you by virtue of paragraph (a) of this section, you must have installed an emergency retrieval system or some other measure acceptable to the Coast Guard, as provided in paragraph (b)(3) of this section. Barges current emergency retrieval system is worn excessively and is unfit for service. Barge is restricted to fair weather within 20nm of shore.
Action required: 60 - Rectify deficiencies prior to movement
Due 16 April 2023
Resolved 28 April 2023
Resolution: Replaced towing line, all sat
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 March 2022 Resolved
The owner, master, or person in charge of a tank vessel must ensure that portable and semi-portable extinguishers are inspected and maintained in accordance with NFPA 10. Annual servicing was overdue by one month. 46 CFR 31.10-18(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 March 2022
Resolved 18 March 2022
Resolution: Received scanned copy of Sea Safety fire extinguishing servicing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 March 2021 Resolved
Non-metallic flexible hoses must have factory assembled fittings requiring no further adjustment or field attachable fittings. Hose and fittings must comply with SAE J1475. Fuel hoses installed on the generator and cargo pump engine have double hose clamps installed.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 April 2021
Resolved 25 March 2021
Resolution: Reviewed videos and pictures of new hose and fitting installation.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 22 March 2021 Resolved
The owner, operator, or master shall provide the Officer in Charge, Marine Inspections with all current valid certificates and registers of cargo gear. Vessel did not have certificate of most recent cargo gear crane and ancillary equipment inspection.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2021
Resolved 24 March 2021
Resolution: Received and reviewed via email servicing certificate for cargo related crane equipment.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 22 March 2021 Resolved
Cargo pump pressure gauge shall be tested at least once annually for accuracy. Vessel representative did not have documentation attesting to annual accuracy test.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2021
Resolved 24 March 2021
Resolution: Received and reviewed email copy of new cargo pump gauge receipt.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 January 2020 Resolved
A Vessel Response Plan must cover all geographic areas of the United States in which the vessel intends to handle, store, or transport oil, including port areas and offshore transit areas. The vessel does not have Charleston listed on its Vessel Response Plan, and has transferred cargo in Beaufort, SC. Request drill records of most recent annual and tri-annual drills outlined in vessel's VRP. VRP must reflect all geographic areas of the United States in which the vessel intends to handle, store, or transport oil, including port areas and offshore transit areas
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2020
Resolved 18 February 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 December 2019 Resolved
A minimum of one remote manual shutdown is required for any tank vessel equipped with an internal combustion engine driven cargo pump on the weather deck. Remote shutdown was identified by operator as inconsistent and is to be replaced. Operational test to be conducted after installation of new remote shutdown.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2020
Resolved 24 January 2020
Resolution: New emergency shutdown installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 27 December 2019 Resolved
Cargo pump pressure gauge shall be tested at least once a year for accuracy. The two existing gauges have not been calibrated. Require calibration or replacement of gauges.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2020
Resolved 24 January 2020
Resolution: cargo piping gauges replaced
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 27 December 2019 Resolved
Within 10 feet of a cargo pipe flange, electrical equipment must be approved intrinsically safe, explosionproof, or purged and pressurized if the location is in the weather. Dogs on machinery space door must be replaced for proper closure so the machinery space is not considered a weather location.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2020
Resolved 24 January 2020
Resolution: New dogs placed on machinery space door.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 January 2019 Resolved
Each cargo tank of a tank barge must have a high-level indicating device, unless the barge complies with 46CFR39.2009:(1) indicates visually the level of liquid in the cargo tank when the liquid level is with in 1 meter. Rising stick in #3 cargo tank has fallen down and could not be tested. Barge is prohibited from loading cargo in #3 Tank 46CFR 39.2003 (b)(1)
Action required: 705 - Other - as specified
Resolved 18 January 2019
Resolution: Rep retrieved rising stick and adjusted.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 5 April 2018 Resolved
#2 stbd void tank cover was damaged that diminished the tanks watertight integrity. O/O notified and rendered 30days to make effective permanent repair or replacement.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 May 2018
Resolved 8 May 2018
Resolution: Attending Marine inspector witnessed the void hatch closed in proper position.
Construction/Loadline › Structures › Cofferdam
Issued 2 April 2018 Resolved
Company failed to make barge available for Internal Structural Exam.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 April 2018
Resolved 5 April 2018
Resolution: Attending marine inspectors satisfactorily conducted the ISE. No Sail cleared.
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 2 April 2018 Resolved
The 208VAC showed the presence of a ground. Determine ground and rectify.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 April 2018
Resolved 4 April 2018
Resolution: O/O completed maintenance to the electrical to the satisfaction of the attending marine inspector.
Engineering › Pressure Vessel › Relief Valve
Issued 2 April 2018 Resolved
The relief valve on the pressure vessel is set to relieve at 170 and the MAWP of the pressure vessel is 165. Obtain the proper relief valve for the pressure vessel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 5 April 2018
Resolution: Attending marine inspector witnessed satisfactory testing of relief valve on pressure vessel.
Electrical › Electric Generation Source (service) › Generator
Issued 2 April 2018 Resolved
Make generator available to conduct overspeed and low lube oil pressure shutdowns on the generator prior to use of equipment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 4 April 2018
Resolution: Attending Marine Inspectors witnessed proper operation of generator and all shut downs.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 30 March 2016 Resolved
CARGO PUMP EMERGENCY SHUT DOWN INOPERABLE. 46 CFR 32.50-35
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2016
Resolution: Repaired cable pull to emergency cargo pump shutdown.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 30 March 2016 Resolved
ONE METER STICK MISSING ON #4 CARGO TANK. 46 CFR 39.2003(b)(1)(2)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2016
Resolution: one meter stick replaced.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 30 March 2016 Resolved
CARGO PUMP PORT HOLE OPEN TO HAZARDOUS ZONE. 46 CFR 32.60-20(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2016
Resolution: Port hole sealed
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 30 March 2016 Resolved
PUMP ROOM VENTILATION FAN GUARD IS NOT IN PLACE. 46 CFR 58.01-20
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2016
Resolution: Guard for vent fan installed
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 30 March 2016 Resolved
TRANSFER PROCEDURES ARE NOT ON BOARD. 33 CFR 155.720
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2016
Resolution: Transfer procedured are on board.
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 29 March 2016 Resolved
All pressure vessels need to be inspected and tested by a Coast Guard Marine Inspector prior to use. Pressure vessel needs to be inspected/tested by USCG before it can be used or added onto the Certificate of Inspection.
Action required: 705 - Other - as specified
Resolved 29 August 2016
Resolution: Witnessed satisfactory hydrostatic test of the pressure vessel. Issued CG-858 to add pressure vessel to the COI and placed it on a 5-year internal inspection interval since it is new and can be internally inspected.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 18 February 2014 Resolved
Electrical distribution system utilizes an ungrounded neutral. Install appropriate transformer with ground detection at 208v and 120v levels.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 January 2015
Resolved 3 February 2015
Resolution: Conducted def check ivo Vane Bros., Court St Brooklyn NY. Electrician onboard demonstrated that the ground detection lights were properly installed with appropriate fuses.
Electrical › Electric Supply System (service) › Battery Installation
Issued 18 February 2014 Resolved
Batteries must be constructed to take into account the environmental conditions of a marine installation, including temperature, vibration, and shock.
Due 29 January 2015
Resolved 2 February 2015
Resolution: Inspector attended vessel to check on the status of the def. Batteries and associated cables have been replaced with marine grade batteries and cables.
Accommodation/Occupational Safety › Ventilation › General
Issued 18 February 2014 Resolved
Vessel observed using an electric blower fan through an open cargo pump pressure gauge porthole to cool the cargo pump engine room compromising the gastight bulkhead. Cargo pump engine room was uncomfortably warm despite exterior freezing temperatures. Engine can reach 200 deg F during normal operations. Install sufficient ventilation in compliance with the vessel's approved hazardous zone plan.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 17 February 2015
Resolved 8 April 2015
Resolution: MIs attended vessel and observered proper installation and operation of ventilation to ensure adequate supply of air to maintain safety and comfort of crew.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 18 February 2014 Resolved
Vessel opened the cargo pump pressure gauge porthole to cool of the cargo pump engine room compromising the gastight bulkhead. The porthole needs to be permanently closed.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 February 2015
Resolved 3 February 2015
Resolution: Porthole closed with nuts and bolts and vessel rep instructed to keep the porthole closed unless the barge is certified gas free. Hinged porthole must be replaced with a fixed window type by next credit drydock. Note added to vessel details.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.