Records from 2016 to 2022. Most recent: inspection, 7 March 2022.
Inspection history · 7
7 March 2022
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7401233
21 May 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6687480
27 May 2018
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6426061
10 May 2018
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6410746
10 May 2017
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6138768
16 February 2016
Ballast Water Examination · ISPS II Exam · Deficiency Check · PII Safety Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5813708
3 February 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5809227
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 10 May 2018
Resolved
0830- Pipes wires(insulat)-accident prevention. The machinery, boilers, and other pressure vessels, associated piping snd fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. Steam leak in boiler piping in vacinity of the incinerator. 74Solas(14) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 May 2018
Resolution: PSC NOLA received a class report from NK satisfying the requirement.
Operations/Management › Mandatory Ship Reporting Systems › Entry Report
Issued 10 May 2018
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 May 2018
Resolution: PSC NOLA received a class report from NK satisfying the requirement.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 10 May 2018
Resolved
2060-Dangerous goods/ harmfull sub pack. All other types of cargo spaces shall be fitted with either a fixed fire detection and fire alarm system or a sample extraction smoke detection system complying with the requirments of the FSS code. Ship was not fitted with a fixed fire detection system or sample extraction smoke detection syatem in the cargo holds that are authorized for the carriag of dangerous goods. 74solas(2014) II-2/19.3.3
Condition: Design Flaw
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 May 2018
Resolution: PSC NOLA received a class report from NK satisfying the requirement.
Documentation › Safety Management System › Reports and Analysis Procedures
Issued 10 May 2018
Resolved
2060- dangerous goods/harmfull sub pack. The company should ensure that any non-conformity is reported appropriate corrective action is taken, and records of these activities are maintained. Vessel was unable to produce records pertaining to deficiency numbers 02 or 03. Vessel's crew was also unable to provide procedures for ensuring dangerous goods, when carried on board, have not caught fire. 74solas(14) IX/3.1
Ref. ISM A/10.2
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 May 2018
Resolution: PSC NOLA received a class report from NK satisfying the requirement.
Lifesaving › Lifeboat Equipment › Fishing Tackle
Issued 16 February 2016
Resolved
0611 74 SOLAS (2014 Cons.) III/31.1.1.1 LSA IV 4.4.8.26 Except where otherwise stated the normal equipment of every lifeboat shall consist of: one set of fishing tackle. Lifeboat does not have one set of fishing tackle.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 March 2016
Resolved 17 February 2016
Resolution: Vessel received new fishing kit
Construction/Loadline › Markings › Load Line Mark
Issued 16 February 2016
Resolved
The ring, lines and letters shall be painted in white or yellow on a dark ground. The ring lines and letters were not painted white or yellow.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 February 2016
Resolved 17 February 2016
Resolution: Vessel painted load lines.