The 5 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it92752 - Convention (Subpart B), Gross Ton 60504 - Convention (Subpart B), Net Ton 181415 - Dead Weight, Ton 206429 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 5
3 March 2021Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7149385
2 March 2021Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7148639
24 February 2021PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7145376
26 March 2018Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6378861
30 December 2016PII Safety Exam · Ballast Water Examination · Deficiency Check · ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6059813
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 1 March 2021Resolved
09211 - Machinery, boilers and other pressure vessels, associated piping systems and fittings shall be installed and protected to reduce to a minimum any danger to persons on board. A steam return line on the forward area of the part deck in the engine room was found with a leak dripping hot water on the hand rail. 74 SOLAS (14) II-2/26.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 March 2021
Resolution: Received class report attesting to repairs.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 March 2021Resolved
99101 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. PSCO observed an active pinhole leak on the NO. 1 bilge/ballast pump and water pooled around the NO. 2 ballast water pump. 74 SOLAS (14) I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 March 2021
Resolution: Received class report attesting to repairs.
02105 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Hydraulic oil was observed pooled in the discharge containment under both steering gear pumps and drained to a deck drain in the aft of the steering gear room. 74 SOLAS (14) I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 March 2021
Resolution: Received class report attesting to repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 March 2021Resolved
13199 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. PSCO observed a hard patch on the engine cooling sea water pipe on the third deck of the engine room. 74 SOLAS (14) I/11(a)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 March 2021
Resolution: Received class report attesting to repairs.
Communications › Radio Communications › EPIRB
Issued 30 December 2016Resolved
The administration shall ensure radio equipment require by this chapter is maintained to provide the availability of the functional requirements of Reg. 4. PSCO observed that the batteries in the SART and EBIRB will expire prior to departing the port. 74 SOLAS (14) IV/15.5. 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 December 2016
Resolution: Tech report received. Placed in docs.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.