MAURY USCG vessel records
← All vessels

NAVIG8 UNIVERSE

NAVIG8 UNIVERSE is a 2013 tank ship. The Coast Guard has recorded 17 inspections since 2016, most recently in November 2025, along with 15 deficiencies and 5 operational controls.

Records from 2016 to 2025. Most recent: operational control imposed, 21 November 2025.

Built
2013
Last inspected
21 November 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 21 November 2025
…with no type recorded5
Operational controls None recorded without a removal date
Years with a record 7 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9489106
1271361
Flag
SINGAPORE
Maury page id
psix-1271361

Documentation record

Tonnage as PSIX records it29478 - Convention (Subpart B), Gross Ton
45112 - Dead Weight, Metric Ton
56583 - Displacement, Metric Ton
11676 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

GRAND ANN Towing Vessel · MISLE 200692 · 21 March 2016 · activity 5838883LASM-25 Tank Barge · MISLE 364893 · 21 March 2016 · activity 5838883

Inspection history · 17

21 November 2025 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8272067
3 September 2025 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8226149
30 April 2025 COC-CHEM & TVE Annual · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8117886
9 May 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7909446
3 May 2024 PSC B
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7905856
28 April 2024 COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7901344
3 June 2020 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6965340
1 June 2020 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6964461
1 June 2020 COE-Administrative
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6965375
23 August 2019 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6792810
15 August 2019 ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6777818
9 August 2018 COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6501072
27 January 2017 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6078454
5 January 2017 Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Renew
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6064239
11 August 2016 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5970012
21 March 2016 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5837782
21 March 2016 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5838883

Deficiency record · 15

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 1 May 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. No. 1 port, No. 2 port, No. 5 stbd, No. 7 stbd COT + Butterworth hatches, No. 8 stbd COT + Butterworth hatches, No. 10 port and stbd COT hatches are not vapor tight. Leaking IG and Cargo Vapor; activated combustible gas meters, and cargo residuals were noted on deck. Temporary repairs have been effected; awaiting permanent repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 May 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. Vessel's LO Purifier No. 2 found modified with a T-handle temporarily epoxied in place. T handle has been removed and temporary repairs have been effected; awaiting permanent repairs.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 1 May 2024 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service in which they are intended... installed and protected to reduce to a minimum any danger to persons on board. Steam condensate line in fuel purifier room fixed with two soft patches, actively leaking. Line has been temporarily blanked off and is awaiting permanent repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 April 2024 Resolved
01 – 15109 – In meeting these requirements, the company should ensure that inspections are held at appropriate intervals, any non-conformities are reported with its probable cause, if known, appropriate corrective actions are taken, and records of these activities are maintained. Considering the deficiencies issued on the CG-5437 B on 28 April 2024 as objective evidence, an expanded ISM exam was conducted, revealing the following major non-conformity: The vessel failed to ensure that non-conformities are identified during inspections, reported by the crew, corrected and corresponding records maintained. An external audit is required.
Condition: Invalid
Action required: 30 - Ship detained
Due 29 April 2024
Resolved 1 May 2024
Resolution: Vessel provided external ISM audit report to the satisfaction of the reviewing office.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 28 April 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. No. 1 port, No. 2 port, No. 5 stbd, No. 7 stbd COT + Butterworth hatches, No. 8 stbd COT + Butterworth hatches, No. 10 port and stbd COT hatches are not vapor tight. Leaking IG and Cargo Vapor; activated combustible gas meters, and cargo residuals were noted on deck.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 28 April 2024
Resolved 1 May 2024
Resolution: Deficiency cleared due to temporary repairs. Deficiency #12 has been assigned in its place.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations… Vessel’s MDO purifier found with a hole in its drain hose, and LO purifier No.1 with drain hose failure. LO purifier No. 2 found modified with a T-handle temporarily epoxied in place.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 28 April 2024
Resolved 1 May 2024
Resolution: Deficiency cleared due to temporary repairs. Deficiency #13 has been assigned in its place.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 28 April 2024 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service in which they are intended… installed and protected to reduce to a minimum any danger to persons on board. Steam condensate line in fuel purifier room fixed with two soft patches, actively leaking.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 April 2024
Resolved 1 May 2024
Resolution: Deficiency cleared due to temporary repairs. Deficiency #14 has been assigned in its place.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations… No. 1 Aux boiler fresh oil hose found with hole, wrapped with duct tape
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 April 2024
Resolved 1 May 2024
Resolution: Vessel effected repairs and provided class report to the satisfaction of the reviewing office.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2024 Resolved
The machinery, boilers and other pressure vessels… shall be of a design and construction adequate for the service intended. Emergency generator found with slow coolant leak in 03 locations.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2024
Resolved 1 May 2024
Resolution: Vessel effected repairs and provided class report to the satisfaction of the reviewing office.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 28 April 2024 Resolved
Piping systems and fittings shall be at a design and construction adequate for the service for which they are intended, and shall be so installed and protected as to reduce to a minimum any danger to persons on board. 04 condensate lines in the purifier room missing lagging. Exposed pipe registering as much as 115° C.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 April 2024 Resolved
All electrical apparatus shall be so constructed and so installed as to not cause injury when handled or touched in a normal manner. 75 amp scrubber, 75 amp BWTS, and 250 amp BWTS breakers found installed inset in panel.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 28 April 2024 Resolved
The condition of the ship shall be maintained with the provisions of the present regulations to ensure that the shill will remain fit to proceed to sea without danger to the persons on board. Found 2 steps in engine room with temporary repairs, one wasted through.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2024 Resolved
Piping systems shall be of a design and construction adequate for the service for which they are intended. Generator No. 1 condensate collector lines found with fiberglass tape around connections point.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 April 2024 Resolved
Piping systems shall be of a design and construction adequate for the service for which they are intended. Cargo tank dehumidifier control air piping found wasted and leaking air. Crew has wrapped the pipe with tape. Taped repair not adequate, air continues to leak.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2024
Resolved 9 May 2024
Resolution: Received class report attesting to repairs.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 5 January 2017 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. The nitrogen generator is operating at a reduced capacity. Vessel shall not conduct cargo operations involving cargos that requie inerting. 70ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 January 2017
Resolution: PSC NOLA received a class report from DNV-GL satisfying the requirement.

Ownership record