NORDERNEY is a 2012 freight ship. The Coast Guard has recorded 8 inspections since 2017, most recently in May 2026, along with 9 deficiencies and 1 operational control.
Records from 2017 to 2026. Most recent: inspection, 11 May 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Tonnage as PSIX records it1966 - Convention (Subpart B), Net Ton 8440 - Displacement, Metric Ton 5489 - Dead Weight, Metric Ton 4591 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
Inspection history · 8
11 May 2026Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8367842
11 May 2026Administrative Inspection · Deficiency Check · PSC B
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8370837
16 February 2024Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7866746
13 February 2024Administrative Inspection · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7865111
10 February 2024Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7863685
05 - Radio Communications › N/A - No Subsystem › Operation of GMDSS equipment
Issued 11 May 2026Resolved
There shall be available at all times while the ship is at sea, a supply of electrical energy sufficient to operate the radio installations and to charge any batteries used as part of a reserve source or sources of energy for the radio installation.
PSCO Observed GMDSS backup battery supply unable to hold a charge in battery operation.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 13 May 2026
Resolution: Vessel replaced batteries and resolved the issue.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 13 February 2024Resolved
OIL FUEL PIPES WHICH IF DAMAGED WOULD ALLOW OIL TO ESCAPE FROM A STORAGE, SETTLING, SERVICE TANK HAVING CAPACITY OF 500L AND ABOVE SHALL BE FITTED WITH COCK VALVE DIRECTLY ON TANKS CAPABLE OF BEING CLOSED IN EVENT OF FIRE. PSCO OBSERVED MAIN ENGINE SERVICING AND SETTLING TANK IN PURIFIER ROOM AND HFO TANK IN ENGINE ROOM PERMENENTLY MOUSED OPEN.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 February 2024
Resolved 15 February 2024
Resolution: PSCO OBSERVED CHIEF ENGINEER ROOM MOUSING. CLEARED ON THE SPOT.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 February 2024Resolved
STRUCTURAL FIRE PROTECTION SYSTEMS SHALL BE KEPT IN GOOD WORKING ORDER SO AS TO ENSURE REQUIRED PERFORMANCE IF FIRE OCCURES; STRUCTURAL FIRE PROTECTION INCLUDING FIRE-RESISTING DIVISIONS AND PROTECTION OF OPENING AND PENETRATIONS IN THESE DIVISIONS. PSCO FOUND 06 BOUNDARIES IN ENGIRE ROOM WITH PERMENANT OR TEMP HOLD BACKS.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 15 February 2024
Resolved 15 February 2024
Resolution: CHIEF ENGINEER REMOVED ALL TIEBACKS ON DOORS. CLEARED ON THE SPOT.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 13 February 2024Resolved
THE COMPANY AND SHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONA SAFETY MANAGEMENT CODE. FOR THE PURPOSE OF THIS REGULATION, THE REQUIREMENTS OF THE CODE SHALL BE TREATED AS MANDATORY. PSCO OBSERVED HEAT DETECTION TEST IN PURIFIER ROOM WITH AN OPEN FLAME. SMS STATED TESTING MUST UTILIZE A HEAT FUN. MASTER TO PROVIDE TRAINING TO CREW ON UTILIZATION OF SMS.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 February 2024
Resolved 15 February 2024
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 July 2021Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purposethe following functional requirements shall be met: means shall be provided to limit the accumulation of flammable vapours and the ignitability of combustible materials should be restricted. PSCO found two (02) 45-gallon trash bags filled with oily rags. Additionally oil and oil soaked rags were found sporadically throughout the engine room indicating leaks. 74 SOLAS (2009) II-2/4
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2024
Resolution: Oily Rags were removed ashore.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 30 July 2021Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision if the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO found missing lagging throughout the engine room as well as improper pipe insulation and utilizing aluminum foil and duct tape. This was especially apparent forward of the main engine. 74 SOLAS (2009) I/11
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2021
Resolved 13 February 2024
Resolution: Insulation was properly installed by crew.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 30 July 2021Resolved
Oil filtering equipment shall be of a design approved by the Administration and shall be such as will ensure that any oily mixture discharged into the sea after passing through the system has an oil content not exceeding 15 ppm. In considering the design of such equipment, the Administration shall have regard to the specification recommended by the Organization. While testing oil content meter the crew could not demonstrate a continuous reading of 18 months as per the systems type approval. Additionally the crew could not provide the manufacturers manual. MARPOL Annex I/Regulation 14.6
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2021
Resolved 13 February 2024
Resolution: Manual was probided, OWS was ran and history was confirmed to store up to 2 years.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 30 July 2021Resolved
Each incinerator on a ship constructed on or after 01 July 2000 shall meet the requirements contained in Appendix VI to this Annex. Each incinerator subject to this paragraph shall be approved by the Administration taking into account the standard specifications for sipboard incinerators developed by the Organization. PSCO observed significant refractory material missing within the combustion chamber. MARPOL Annex VI/Regulation 6.1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2021
Resolved 13 February 2024
Resolution: Refractory within the incenerator was restored.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 July 2021Resolved
Muster and embarkation stations shall be adequately illuminated by lighting supplied from emergency source of electrical power. While testing emergency lighting at port side life raft embarkation, the emergency lighting did not work. PSCO found damaged and burnt electrical plug. 74 SOLAS (2014) III/11.4
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2021
Resolved 13 February 2024
Resolution: New lamp installed. Cable socket connector replaced.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.