Records from 2014 to 2026. Most recent: inspection, 24 May 2026.
Inspection history · 31
24 May 2026
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8379392
1 October 2025
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8244626
26 September 2025
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8240625
17 October 2024
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8071558
16 October 2024
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8019680
29 May 2024
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7922587
15 May 2024
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7912335
21 November 2023
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7828033
14 November 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7824912
26 September 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7798492
25 September 2023
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7798049
18 September 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7793824
26 July 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7753090
22 February 2023
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7640024
12 May 2022
PSC A
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7448899
12 May 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7449056
7 July 2019
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6738237
2 July 2019
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6733654
11 February 2019
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6623493
11 February 2019
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6623800
27 October 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6569232
30 May 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6428769
11 April 2018
ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6389396
16 February 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6356442
3 May 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6137782
13 March 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6104050
13 April 2016
In-Service Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5853756
17 February 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5816472
6 November 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5758958
4 August 2015
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5205745
15 October 2014
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5005375
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 26 September 2025
Resolved
The construction and means for securing the weathertightness of cargo and other hatchways in position 1 and 2 shall be at least equivalent to the requirements of regulations 15 and 16 of this aneex. PSCO observed a missing and damaged cargo vent cover located portside on cargo hold #3.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 September 2025
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 26 September 2023
Resolved
The equipment required by this part is maintained in operable condition. Vessel reported port side anchor can not be released by gravity.
33 CFR 164.11(r)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 November 2023
Resolution: Vessel provided documentation attesting to repairs.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 12 May 2022
Resolved
33 CFR 164.46- INOP AIS LOD ISSUED 046-22
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2022
Resolution: vsl provided tech report attesting to repairs. AIS system functioning as designed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 12 May 2022
Resolved
The load lines shall be permanently marked on the sides of the the ship to the satisfaction of the administration. The PSCO observed 02 load lines on the ships hull, with only one marking approved by the load line certificate.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2022
Resolved 21 May 2022
Resolution: Vessel provided documentation attesting to the correction of the load line def.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 July 2019
Resolved
FOR EMERGENCY GENERATING SETS, A SECOND SOURCE OF ENERGY SHALL BE PROVIDED FOR AN ADDITIONAL THREE STARTS WITHIN 30 MINUTES. PSCO OBSERVED SECONDARY MEANS OF STARTING WAS INOPERABLE.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 July 2019
Resolved 7 July 2019
Resolution: ABS report attesting to rectification was recieved. See documents.
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 7 July 2019
Resolved
ALL SHIPS OF 500 GROSS TONNAGE AND UPWARDS SHALL HAVE A GYRO-COMPASS BEARING REPEATER OR OTHER MEANS TO TAKE BEARINGS OVER AN ARC OF THE HORIZON OF 360 DEGREES. [name withheld] WING GYRO COMPASS WAS INOPERABLE.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 July 2019
Resolution: ABS report attesting to rectification was recieved. See documents.
Fire Fighting › Ventilation Systems › Fans
Issued 3 May 2017
Resolved
CO2 space is required adequate space ventilation. During inspection of vessel CO2 room space, the space ventialtion was inoperable. 74 SOLAS(14 CONS) II-1/10.4.3 17ab
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 May 2017
Resolved 3 May 2017
Resolution: Class report provided.
Lifesaving › Rescue Boat › Rudder/Tiller/Steering
Issued 3 May 2017
Resolved
Rescue boats shall have sufficient mobility and maneuverability. During the lifeboat exam, primary sterring was identified as inoperable due to mechanical failure. 74 SOLAS (14 CONS) III/31.2 LSA CODE 5.5.1.1.7
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 8 June 2017
Resolution: Received class documentation attesting to repairs
Engineering › Thrusters › Shaft
Issued 3 May 2017
Resolved
The condition of thsip and its equipment shall be maintained to ensure that the ship will be fit to oriceed to sea. Bow thruster is inoperable. Company has been informed and is developing repair plan, but class has not been informed or approved plan. 74 SOLAS (!4 CONS) I/11(a) 40ab
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 8 June 2017
Resolution: Class issued condition allowing vessel to sail until bow thruster can be repaired in drydock, to be corrected by 01 Sep 2017
Engineering › Electric Propulsion System › Remote Control Circutry
Issued 14 April 2016
Resolved
During a pre arrival drill the vessel switched engine control from the bridge to local control. Vessel then lost electronic communication for main engine in the ECR and on the bridge. vessel was unable to switch back control. A third party technician determined the malfunction was found to be a faulty pressure transmitter.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 14 April 2016
Resolved 14 April 2016
Resolution: Vessel replaced the faulty pressure transmitter.