MAURY USCG vessel records
← All vessels

CRYSTAL SUNRISE

CRYSTAL SUNRISE is a 2013 tank ship. The Coast Guard has recorded 10 inspections since 2016, most recently in March 2026, along with 1 deficiency.

Records from 2016 to 2026. Most recent: inspection, 27 March 2026.

Built
2013
Last inspected
27 March 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9631682
9V2024
1272359
Flag
SINGAPORE
Maury page id
psix-1272359

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspections, by type

Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Tonnage as PSIX records it46949 - Convention (Subpart B), Gross Ton
14085 - Convention (Subpart B), Net Ton
54070 - Dead Weight, Metric Ton
72883 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 10

27 March 2026 Administrative Inspection · COC-GAS Annual
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8332934
18 February 2025 COC-GAS Renew · Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8080391
17 January 2024 Administrative Inspection · PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7849476
12 March 2023 PSC B · COC-GAS Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7649519
8 June 2022 COC-GAS Annual · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7467980
18 April 2021 COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7174574
28 March 2020 COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6929242
8 March 2019 COC-GAS Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6634904
16 June 2017 Ballast Water Examination · COC-GAS Annual · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6154758
30 May 2016 Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5887211

Deficiency record · 1

07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 8 March 2019 Resolved
On ships carrying flammable or toxic products, a water spray system for cooling, fire prevention, and crew protection should be installed to cover exposed cargo tank domes. On initial test, witnessed inadequate coverage of tank top #1. Vessel maintenance records indicate testing and purging of system conducted on 6 Mar 2019. Ship crew cleared all in-line filters. Preventative maintenance requires 3 month intervals. Work carried out in Oct 2018, Jan 2019, and, March 2019, less than 3 months in preparation for COC exam. Ships crew cleared sand/organic material from strainer on tank top #1. System operating as required with adequate coverage on all required areas. 74 SOLAS (14) VII Ref IGC 93 / 11.3.1.1
Action required: 10 - Deficiency Rectified
Due 8 March 2019
Resolved 8 March 2019

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.