Records from 2017 to 2026. Most recent: inspection, 15 April 2026.
Documentation record
Tonnage as PSIX records it7969 - Convention (Subpart B), Gross Ton
2391 - Convention (Subpart B), Net Ton
2879 - Dead Weight, Ton
7969 - Regulatory (Subpart C or D), Gross Ton
2391 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Inspection history · 7
15 April 2026
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8352601
24 January 2026
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8301137
11 August 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7978516
9 July 2024
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7941336
25 November 2020
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7098410
19 November 2018
PII Safety Exam · Ballast Water Examination · Administrative Inspection · Deficiency Check · ISPS II Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6583758
19 January 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6069133
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 25 November 2020
Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed fixed water based fire extinguishing system not in the automatic mode, and water supply valves in the secured position. 74 SOLAS (04) II-2 / 14.2.1.1
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 7 December 2020
Resolved 7 December 2020
Resolution: Ship Master provided satisfactory pictures properly secured cylinders onboard and invoices of removed cylinders (19).
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 25 November 2020
Resolved
Cylinders must always be secured and when not in use, must be stored in a rack in an upright position with the valve protection cap in place. PSCO observed cylinders loosely tied down with rope, not secured in a rack in multiple areas of the ship. 46 CFR 147.60(b)(1)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 November 2020
Resolved
Ships shall be maintained in compliance with mechanical requirements of a classification society which is recognized by the Administration. PSCO observed main propulsion engine actively leaking water from the engine block. 74 SOLAS (04) II-1 / 3-1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 December 2020
Resolved 9 December 2020
Resolution: Master provided Flag and RO report addressing the repair plan to be completed within a 3-month period.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 19 November 2018
Resolved
02134- To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2025(a)(3), or ballast with water from a U.S. public water system, according to the schedule in paragraph (b) of this section. Subject vessel, of keel laid date 08NOV2001 and ballast water capacity of 13364.3 m3, is past its compliance date per the implementation schedule in 33 CFR 151.2035. As vessel is past its compliance date, discharge of untreated ballast into U.S. waters is not permitted.
Cite: 33 CFR 151.2035
Action Taken: 15c
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 21 June 2019
Resolution: Received amaendments to BWT plan. MSU Texas City added special note regarding no discharge.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 19 November 2018
Resolved
15105- A vessel equipped with ballast water tanks that operates in the waters of the United States must maintain a ballast water management plan that has been developed specifically for the vessel and that will allow those responsible for the plans implementation to understand and follow the vessel's ballast water management strategy and comply with the requirements of this subpart. Vessel’s ballast water management plan does not
reference the must up-to-date version of the U.S. regulations.
Cite: 33 CFR 15.2050(g)
Action Taken: 50c
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 June 2019
Resolution: Received amendments to plan