Records from 2014 to 2022. Most recent: inspection, 18 December 2022.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
18 December 2022
PSC B · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7607318
17 December 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7617176
9 March 2018
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6366078
5 March 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6366368
23 June 2014
Damage Survey · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4897423
27 May 2014
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4870428
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 18 December 2022
Resolved
Unless expressly provided otherwise, every ship shall be provided with a main steering gear and an auxilary steering gear to the satisfaction of the administration. PSCO observed a hydraulic alarm during steering gear test. Crew was unable to identify the cause of the alarm.
SOLAS 74(a), 2014 cons. II-1/29.1
60ac
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 December 2022
Resolution: Recieved, Reviewed and accepted the BV Class report stating that repairs were made to the satisifcation of class.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 18 December 2022
Resolved
The arrangements for the storage, distribution and utilization of other flammable oils employed under pressure in power transmission systems, control and activating systems and heating systems shall be such as to ensure the safety of the ship and persons on board. PSCO observed hydraulic leaks and seepage from the #1 valve block gaskets and the #2 filter housing.
74 SOLAS (a) 2014 cons. II-2/4.2.4
60ac
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 December 2022
Resolution: Recieved, Reviewed and accepted the BV Class report stating that repairs were made to the satisifcation of class.
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 18 December 2022
Resolved
To assist in casualty investigations ships, when engaged on international voyages shall be fitted with a voyage data recorder (VDR). PSCO observed the VDR has errors. Vessel did not notify the CG of inoperable equipment prior to arrival.
SOLAS 74(a) 2014 cons. V/20.1
17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2022
Resolution: Recieved, Reviewed and accepted the BV Class report stating that repairs were made to the satisifcation of class.
Pollution Prevention/Response › Prevention Equipment › Means of Removal from within Coaming
Issued 23 June 2014
Resolved
Any discharge into the sea of oil or oily mixtures from ships of 400 GT and above shall be prohibited except when all of the following conditions are satisfied. Cargo hold #2 contains an oily water/cargo mix. Vessel is to provide class approved plan on discharge of cargo hold residue to ensure the conditions of MARPOL Annex I/15.2.1-15.2.5
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2014
Resolution: Received, reviewed, and accepted class report from [name withheld] stating that the water in hold #2 had been transferred to the Hold Washing tank using hold bilge system/ejector. The vessel will discharge the contaminated water to an approved facility.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 23 June 2014
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Portside in way of #1 and #2 cargo holds CO2 extinguishing system piping damaged from cargo loading.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2014
Resolution: Received, reviewed and accepted class report from [name withheld] stating that an app. 4'' section of damaged CO2 piping had been replaced by Brady Marine Repair Co. The repair was carried out by an ABS approved welder.
Stability › Unintentional Flooding › General
Issued 23 June 2014
Resolved
Whenever an accident occurs to a ship that affects the safety of the ship, the master or owner of the ship shall report at the earliest opportunity to the Admin, the nominated surveyor or RO, who shall cause investigations to be initiated to determine whiter a survey is necessary. Vessel is to provide class report attesting to the stability of the vessel with water/cargo mix in cargo hold #2
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2014
Resolution: Received, reviewed and accepted class report from [name withheld] attesting to the stability of the vessel with water/cargo mix in hold #2.