Records from 2014 to 2025. Most recent: inspection, 10 March 2025.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 5
10 March 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8087984
13 April 2021
PSC B
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7168736
25 March 2021
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7162658
29 May 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6427325
3 March 2014
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4804781
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 10 March 2025
No resolution recorded
Every ship shall have scales of draughts marked clearly at the bow and stern. PSCO observed that the paint on the draught marks had become unreadable. SOLAS 74 II-1/ 5.6
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 13 April 2021
Resolved
The master, owner, operator, agent, or person in charge of a vessel subject to this sub part must submit a ballast water report to the National Ballast Information Clearinghourse (NBIC). Port State Control Officer observed the vessel did not submit an NBIC report prior to entering and while in United State's waters.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 13 April 2021
Resolved 13 April 2021
Resolution: PSCO informed master of Ballast water regulations and Master submitted NBIC report.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 3 March 2014
Resolved
0710-Fire prevention-Maintenance, testing and inspections shall be carried out based on the guidance developed by the Organization having due regard to ensuring the reliability of fire-fighting systems and appliances. PSCO noted (04) smoke/heat detectors covered w/plastic covers in the Engine Room, rendering those detectors in operable in the event of a dangerous condition-SOLAS 74 (a) II-2/14.
Action required: 705 - Other - as specified
Due 1 April 2014
Resolved 23 November 2014
Resolution: PSC NOLA received proper documentation from company satisfying the requirement.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 3 March 2014
Resolved
1020-Fire alarm-The Fire control panel in Fire Control Room identified a "Main power fault" dated 01/22/14, in which no responsible party was aware of fault code. The Control Panel on Bridge, however, did not have a fault or any outstanding alarms-SOLAS 74 (a) II-2/14.
Action required: 705 - Other - as specified
Due 3 March 2014
Resolved 3 March 2014
Resolution: Alarm indicator in the Fire Control Room was reset.
Documentation › Certificates/Documents › IOPP Certificate
Issued 3 March 2014
Resolved
0150-Oil pollution prevention (IOPP)-The IOPP Certificate shall be drawn up in a form corresponding to the model given in appendix II. The IOPP form A supplement does not indicate the maximum capacity in kW or kcal/h for the incinerator-MARPOL 73/78 2011 CONS. ANX I/9.
Action required: 705 - Other - as specified
Due 1 April 2014
Resolved 5 March 2014
Resolution: Received proper documentation satisfying the requirement.
Construction/Loadline › Markings › Load Line Mark
Issued 3 March 2014
Resolved
1220-Freeboard marks-The ring, lines and letters shall be painted in white or yellow on a dark background. PSCO noticed that on the port and starboard sides of the hull the deck line was not painted accordingly-ICLL 96' ANX I CH. I/8.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 November 2014
Resolution: PSC NOLA received proper documentation from vessel satisfying the requirement.