Records from 2014 to 2016. Most recent: inspection, 1 February 2016.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Construction/Loadline › Markings › Load Line Mark
Issued 17 February 2016
Resolved
Load line (Plimsol Mark and Seasonal Tree) obscured an not easily visible from up close.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 28 April 2016
Resolution: Load line was re-painted.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 1 February 2016
Resolved
100% muster not achieved. After over an hour, drill was called.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 1 March 2016
Resolution: crew performed as expected during Abandon ship drill
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 5 March 2014
Resolved
Lifeboat self-contained air systems are down due to over-pressurization and blown rupture discs. Provide fully operational air systems for all lifeboats prior to commencing drilling activity. Noted that parts & technician have been requested. Cite 09 MODU 10.3.1, LSA 4.8. Action PTD (Prior to Drilling), a,c.
Action required: 705 - Other - as specified
Resolved 7 March 2014
Resolution: Discs replaced and bottles filled to proper pressure.
Lifesaving › Rescue Boat › Propulsion Starting System
Issued 5 March 2014
Resolved
Rescue boat only has one operational battery. Provide second operational battery. Parts have been ordered. Cite 09 MODU 10.8, LSA 5.1.1.1/4.4.6.2. Action 40a, c.
Due 19 March 2014
Resolved 11 March 2014
Resolution: Replaced battery as required.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 5 March 2014
Resolved
The roIl-down shutter for the Scullery window will not automatically close in case of a fire. Provide temporary mitigation/procedures to secure this A-Class boundary opening until permanent repairs can be made. Affect final repairs and prove that the shutter will fully close without outside assistance in case of a fire. Cite 09 MODU 9.2.4. Action 16a,c.
Due 31 March 2014
Resolved 31 March 2014
Resolution: Shutter was operational on 12Mar & extended due date to 31Mar for Class follow-up/verification. Class witnessed satisfactory testing.
Electrical › Electric Generation Source (emergency) › Generator
Issued 5 March 2014
Resolved
The second means of starting for the Emergency Generator is not operational (air starter). Parts have been ordered. Prove proper operation of the air start system for the E-Gen. Cite 09 MODU 5.5.2. Action 16a,c.
Due 19 March 2014
Resolved 10 March 2014
Resolution: Air start repaired/operational.
Engineering › Diesel Engine (auxiliary) › Emergency shutdown
Issued 5 March 2014
Resolved
Provide test arrangement to prove operation of the low oil pressure alarm for the Emergency Generator. Prove set point for the same. Provide documentation to show that Flag and Class are satisfied with an alarm only in place of a shut-down for a low oil pressure situation with the E-Gen. Cite 09 MODU 4.3.7. Action 50a,b,c.
Due 5 April 2014
Resolved 10 March 2014
Resolution: Low L/O pressure set-point proven and the alarm only arrangement is acceptable to Class/Flag per documentation provided.
Fire Fighting › Means of Escape › Handrails/Handholds
Issued 5 March 2014
Resolved
Provide interior and exterior steps to prove easy and safe egress through the Oceaneering ROV Control Van escape hatch. Provide handle for ROV Maintenance Van escape hatch. Cite 09 MODU 9.4.1.3. Action 50a,c.
Due 5 April 2014
Resolved 14 March 2014
Resolution: Steps provided/installed for the Control Van escape hatch and handle installed for the Maintenance Van escape hatch.
Documentation › Certificates/Documents › MODU Safety Certificate
Issued 3 March 2014
Resolved
Provide corrected IMO MODU Safety Certificate. Current certificate references that survival suits are onboard but have been removed due to work location. Certificate is to be amended to reflect current equipment or survival suits are to be placed back into service to comply with the Certificate. Cite 09 MODU 1.6.7/1.4. Action 50a,c.
Due 5 April 2014
Resolved 18 March 2014
Resolution: Corrected MODU Safety Certificate provided.