Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 September 2014
Resolved
Vessel was carrying freight for hire without a Certificate of Inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 February 2015
Resolved 7 October 2016
Resolution: Company (or master) was issued/excepted LOW for carrying freight for hire w/out COI.
Construction/Loadline › Hull › Hull Plating
Issued 17 May 2012
Resolved
Vessel missed required drydock and internal structural examination (due by 30Apr2012). Vessel restricted from commercial operations until credit given for drydock and internal structural examination.
Action required: 705 - Other - as specified
Resolved 7 October 2016
Resolution: Cleared old requirement. Entered Special Note.
Construction/Loadline › Hull › Bottom Plating
Issued 17 August 2011
Resolved
Complete damage survey of underwater body and submit temporary repair plan prior to departure from Whittier, AK. Survey and temp repair plan shall be witnessed and approved by cognizant Officer in Charge Marine Inspection.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 August 2011
Resolution: 23AUG11: Vessel is allowed to operate under the conditions of the letter from Ronald E Long marine Surveys, LLC, with temporary repairs with one change: Total allowed cargo weight reduced to 54, 000lbs instead of the 66, 000lbs proposed in the letter.
Construction/Loadline › Hull › Bottom Plating
Issued 17 August 2011
Resolved
Crop and renew hull plating in way of #2 stbd hold.
23AUG11: Vessel is allowed to operate under the conditions of the letter from Ronald E Long marine Surveys, LLC, with temporary repairs with one change: Total allowed cargo weight reduced to 54, 000lbs instead of the 66, 000lbs proposed in the letter. Vessel is to complete permanent repairs to the hull and may not carry cargo after 01NOV11
Action required: 705 - Other - as specified
Due 6 November 2011
Resolved 8 December 2011
Construction/Loadline › Hull › Longitudinal Frame
Issued 17 August 2011
Resolved
Crop and renew 2 bent longitudinals and 1 bent cross member in way of #2 stbd hold.
23AUG11: Vessel is allowed to operate under the conditions of the letter from Ronald E Long marine Surveys, LLC, with temporary repairs with one change: Total allowed cargo weight reduced to 54, 000lbs instead of the 66, 000lbs proposed in the letter. Vessel is to complete permanent repairs to the hull and m
Action required: 705 - Other - as specified
Due 6 November 2011
Resolved 8 December 2011
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 1 April 2011
Resolved
Replace liferaft hydrostatic release unit.
Due 8 April 2011
Resolved 8 April 2011
Resolution: Rcvd fax receipt indicating new HRU purchase.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 1 April 2011
Resolved
Renew vessel name/hailing port @ stern of vessel.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 April 2011
Resolved
Provide proof that user fees are paid.
Due 1 May 2011
Resolved 7 April 2011
Resolution: Cleared. Spoke w/ User Fee desk & verified in MISLE.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 April 2011
Resolved
Replace stern light globe.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Construction/Loadline › Structures › Door
Issued 1 April 2011
Resolved
Install transverse V bar where missing @ bow ramp.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Stability › Weathertight Integrity › General
Issued 1 April 2011
Resolved
Install centerline bridge window.
Due 1 May 2011
Resolved 6 September 2011
Resolution: Rcvd call fm [name withheld] that window replaced.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 1 April 2011
Resolved
Install latch to breaker panel on bridge.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 1 April 2011
Resolved
Secure fridge.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 April 2011
Resolved
Properly terminate or remove dead-ended wire in vicinity of fridge.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 1 April 2011
Resolved
Install grate supports @ bilge well of cargo hold.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 1 April 2011
Resolved
Provide copy of supervisory training certificate.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 1 April 2011
Resolved
Provide copy of employer drug & alcohol program policy.
Due 1 May 2011
Resolved 31 October 2011
Resolution: Rcvd e-mail copy of policy. Administratively examined/cleared.
Electrical › Electric Supply System (service) › Battery Installation
Issued 1 April 2011
Resolved
Install isolation switches for batteries.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 April 2011
Resolved
Install lagging to generator manifold.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 1 April 2011
Resolved
Wire Fireboy to automatically shutdown generator when actuated.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 April 2011
Resolved
Run wires beneath electrical breaker in conduit or replace with shielded marine cable.
Due 1 May 2011
Resolved 19 August 2011
Resolution: Examined/cleared.
Documentation › Certificates/Documents › Stability Letter
Issued 1 April 2011
Resolved
Vessel restricted to operating within the recommendations noted in Coastwise Corporation letter dated 31Mar2011 until new stability letter is received.
Action required: 705 - Other - as specified
Resolved 7 October 2016
Resolution: Cleared old requirement. Entered Special Note.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 15 March 2011
Resolved
Provide guard for rotating belt on generator.
46CFR177.960
Due 27 March 2011
Resolved 1 April 2011
Resolution: Examined/cleared.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 15 March 2011
Resolved
Provide proper servicing on portable fire extinguishers
46CFR176.810(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 March 2011
Resolution: Owner provided servicing report.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 15 March 2011
Resolved
Repair leak on port exhaust pipe
46CFR172.430(b)
Due 27 March 2011
Resolved 6 September 2011
Resolution: Rcvd call fm [name withheld] that leak repaired.
Stability › Incline Test › General
Issued 25 October 2010
Resolved
Submit data for lightship calculation to USCG Marine Safety Center for determination if a deadweight survey or full stability test is required. Submission required due to superstructure change in 2005 (plywood to aluminum house) & removing port & stbd cargo hold fuel tanks fm svc. Must be completed prior to renewal of COI (27Mar2011). MSC Technical Note 04-95 should be consulted for guidance.
Due 27 March 2011
Resolved 1 April 2011
Resolution: Incline test completed on 15Mar2011. Vsl restricted to operating w/in Coastwise Corp ltr dtd 31Mar2011 recommendations pending receipt of new stability ltr fm MSC.
Construction/Loadline › Hull › Longitudinal Frame
Issued 23 July 2010
Resolved
Install inboard longitudinals 2 each to bay 1 and bay 3 (Port Wing Void 2).
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Hull › Longitudinal Frame
Issued 23 July 2010
Resolved
Install 2 inboard longitudinals to bay 1 (Port Wing Void 3).
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 23 July 2010
Resolved
Make temporary repairs to aft cargo hold bulkhead in way of holes (2).
Due 23 July 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 23 July 2010
Resolved
C/R cargo hold aft bulkhead.
Due 15 October 2010
Resolved 2 November 2010
Resolution: Examined/cleared.
Construction/Loadline › Hull › Hull Plating
Issued 23 July 2010
Resolved
C/R transom sideshell to good metal.
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Hull › Longitudinal Frame
Issued 19 July 2010
Resolved
Reinstall inboard longs #1 & 2 in way of bay 1 of stbd wing void #3.
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Hull › Longitudinal Frame
Issued 19 July 2010
Resolved
Reinstall inboard long #2 in way of bay 3 of stbd wing void #3.
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Hull › Longitudinal Frame
Issued 18 June 2010
Resolved
C/R both deck beams (Port Wing Void 2).
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 30 April 2010
Resolved
Install guards to external exhaust pipes (port & stbd).
Due 4 June 2010
Resolved 2 November 2010
Resolution: Examined/cleared.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 16 April 2010
Resolved
Mount 3 BII fire extinguishers in proper brackets.
Condition: Improper Installation
Due 16 May 2010
Resolved 30 April 2010
Resolution: Examined/cleared.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 16 April 2010
Resolved
Permanently mount BI fire extinguisher.
Due 16 May 2010
Resolved 30 April 2010
Resolution: Examined/cleared.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 16 April 2010
Resolved
Install handle to access hatch of lifejacket storage.
Due 16 May 2010
Resolved 30 April 2010
Resolution: Examined/cleared.
Documentation › Markings/Placards › Lifejacket Placard
Issued 16 April 2010
Resolved
Post appropriate lifejacket donning placards.
Due 16 May 2010
Resolved 9 August 2010
Resolution: Examined & cleared.
Engineering › Bilge Water Management System › Pump
Issued 16 April 2010
Resolved
Prove proper operation of fixed hydraulic bilge pump.
Due 16 May 2010
Resolved 30 April 2010
Resolution: Examined/cleared.
Construction/Loadline › Structures › Door
Issued 16 April 2010
Resolved
Prove proper operation of bow ramp.
Due 16 May 2010
Resolved 30 April 2010
Resolution: Examined/cleared.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 16 April 2010
Resolved
Conduct underway drills.
Due 16 May 2010
Resolved 30 April 2010
Resolution: Witnessed/satisfactory.
Stability › Incline Test › General
Issued 2 April 2010
Resolved
Provide stability analysis, to include all lightship changes (i.e., new house in 2005, removing P/S fuel tanks from service), from 1995 to present.
Due 6 August 2010
Resolved 25 October 2010
Resolution: Cleared & reissued w/ better description/date. See activity #3782685 for more detail.
Documentation › Certificates/Documents › Stability Letter
Issued 2 April 2010
Resolved
Provide current stability letter for vessel.
Due 6 August 2010
Resolved 9 August 2010
Resolution: Found stability ltr dtd 04Mar95 issued to the ITSWOOT based on incline performed on the BLUE FOX (O.N. 274143). Entered into vsl certificates/documents.
Construction/Loadline › Hull › Weld
Issued 2 April 2010
Resolved
Weld plate on inboard transverse bulkhead in way of bay 3. (Stbd Wing Void 1).
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 2 April 2010
Resolved
Crop/renew improper insert to aft bulkhead. (Cargo Hold)
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Structures › Deck Plating
Issued 2 April 2010
Resolved
Vee/re-weld seam of aluminum deck (Wheelhouse/accommodation).
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Construction/Loadline › Structures › Deck Plating
Issued 2 April 2010
Resolved
Continuously weld seam of aluminum deck from engine room (Wheelhouse/accommodation).
Due 6 August 2010
Resolved 9 August 2010
Resolution: Examined/cleared.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 8 July 2009
Resolved
Secure B-II portable fire extinguisher in galley
Action required: 705 - Other - as specified
Due 8 August 2009
Resolved 1 August 2009
Resolution: B-II secured
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 8 July 2009
Resolved
Attach lanyard with quick clip on life ring light
Action required: 705 - Other - as specified
Due 8 August 2009
Resolved 1 August 2009
Resolution: Life ring lanyard clip attached
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 8 July 2009
Resolved
Secure air compressor (PV) in eng room.
Action required: 705 - Other - as specified
Due 8 August 2009
Resolved 1 August 2009
Resolution: Air compressor secured with straps
Construction/Loadline › Hull › Hull Plating
Issued 24 December 2008
Resolved
Vessel missed 2008 dry-dock & ISE due date. Vessel restricted from operating until DDX & ISE inspection completed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 January 2009
Resolution: Vessel removed from 18 month DDX & ISE because prior requirement completed in OCT 2007 inspection.
Documentation › Certificates/Documents › FCC SSL
Issued 8 April 2008
Resolved
Vsl did not have a valid FCC License on board. Vsl is required to apply for new license prior to getting underway.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Communications › Radio Communications › EPIRB
Issued 8 April 2008
Resolved
EPIRB hydrstatic release was expire. Vsl required to get valid hydrostatic release prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 8 April 2008
Resolved
First Aid kid had expired meds. Vsl required to replace first aid kit prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Lifesaving › Immersion Suits › Marking
Issued 8 April 2008
Resolved
Immersion suits were not marked with vsls name. Corrected onsite.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2008
Lifesaving › Immersion Suits › Serviceable
Issued 8 April 2008
Resolved
Vsl had 01 immersion suit that was not serviceable. Vsl is restricted to the carriage of 05 persons until a new immersion suit is onboard.
Action required: 705 - Other - as specified
Resolved 10 April 2008
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 8 April 2008
Resolved
None of the fire ext. were mounted. Vsl required to ensure that fire ext are mounted prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Lifesaving › Lifejacket/PFD (Type IV) › Condition
Issued 8 April 2008
Resolved
Vsl required to have line attached to one RLB. Required vsl to attach line prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Engineering › Fuel Oil Service System › Valve
Issued 8 April 2008
Resolved
Emergency F/O shutoff did not completely close the valve. Vsl required to ensure that valves can be completely closed remotely prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 8 April 2008
Resolved
No guard was on stbd MDE. Vsl required to place a guard on MDE pulley prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Lifesaving › Lifejacket/PFD (Type IV) › Lights
Issued 8 April 2008
Resolved
Water light on the RLB did not have the proper battery. Vsl required to ensure that proper battery is installed prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Communications › Alarms/Indicators › Bilge Alarm
Issued 8 April 2008
Resolved
Vsl did not have a visual alarm at the operator's station for the high water alarm. Vsl required to have a visual alarm installed prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Electrical › Electrical Distribution System (service) › Junction Box
Issued 8 April 2008
Resolved
A junction box in the galley did not have a cover. Vsl required to have a cover on the j-box prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 8 April 2008
Resolved
ER did not have metallic supports for the wiring. Vsl required to install metallic supports for wiring in ER prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Electrical › Lighting (service) › Lighting Fixture
Issued 8 April 2008
Resolved
Light in the ER did not have a cover. Vsl required to install cover on the light prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Electrical › Electrical Distribution System (service) › Cable
Issued 8 April 2008
Resolved
Vsl had jumpers between the batteries because one of the batteries was not keeping a charge. Vsl required remove the jumpers and correct the battery problem prior to getting u/w.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 8 April 2008
Resolved
Vsl did not have current tables onboard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Navigation › Piloting/Steering › US Coast Pilot
Issued 8 April 2008
Resolved
Vsl did not have current US Coast Pilot onboard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 April 2008
Resolved
Vessel missed 2007 annual inspection. Vessel is restricted from operating until completing annual exam to the satisfaction of attending Coast Guard marine inspector.
Due 30 April 2008
Resolved 10 April 2008
Resolution: Completed sat annual inspection.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 3 April 2008
Resolved
Provide copy of vessel logs from 27 June 2007 to present.
Due 30 April 2008
Resolved 7 April 2008
Resolution: Rcvd copies of vsl logs.
Construction/Loadline › Hull › Hull Plating
Issued 27 March 2006
Resolved
Provide plans for rearrangement of engine space day tanks and battery rack replacements prior to scheduled dry dock.
Action required: 705 - Other - as specified
Resolved 4 April 2007
Engineering › Steering Gear System › Linkage
Issued 22 March 2006
Resolved
Make proper repairs/replace rudder assembly fitting for port rudder connection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2006
Resolved 4 April 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 March 2006
Resolved
Remove old wiring for bilge system.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 26 April 2006
Resolved 4 April 2007
Communications › Radio Communications › EPIRB
Issued 22 March 2006
Resolved
Affix new EPIRB registration sticker to EPIRB.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 April 2006
Resolved 4 April 2007
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 22 March 2006
Resolved
Provide Training, Drills and Lifesaving maintenance logs.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2006
Resolved 27 March 2006
Construction/Loadline › Hull › Side Shell
Issued 22 March 2006
Resolved
Provide plans prior to next scheduled dry dock exam ro replacement of side plate and inboard manhole of main fuel tanks.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 4 April 2007
Construction/Loadline › Structures › Manhole
Issued 22 March 2006
Resolved
Provide permanent arrangement to secure engine compartment access cover.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2006
Resolved 4 April 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 July 2005
Resolved
Complete wiring installation in new pilot house.
Action required: 705 - Other - as specified
Due 30 July 2005
Resolved 27 March 2006
Documentation › Markings/Placards › Lifejacket Placard
Issued 13 July 2005
Resolved
Complete labeling and placards for lifesaving and firefighting equipment.
Action required: 705 - Other - as specified
Due 30 July 2005
Resolved 27 March 2006
Construction/Loadline › Hull › Bottom Plating
Issued 17 February 2005
Resolved
Clean engine compartment bilges for ins pection when vessel pulled to replace skegs.
Action required: 705 - Other - as specified
Due 30 September 2005
Resolved 7 October 2005
Resolution: Steam cleaned bilges and pumped mixture to 55 gallon drums.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 27 May 2004
Resolved
Service portable fire extinguishers
Condition: Improper/Lack of Maintenance
Due 6 June 2004
Resolved 28 October 2004
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 27 May 2004
Resolved
Provide self priming or exhaust prime fire pump as directed in MSO Anchorage letter dated July 24, 2003
Due 6 June 2004
Resolved 28 October 2004
Resolution: Observed test of pump, sat.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 27 May 2004
Resolved
Replace aft ring bouy waterlight line LEGACY COMPONENT DESC: Buoyant Lifeline
Due 6 June 2004
Resolved 28 October 2004
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 27 May 2004
Resolved
Repair inop Fireboy discharge light, properly install fixed fire extinguisher per manufacturer's instructions, (vertical mount and connected to engine shutdown). Verify installation and operation with Yukon Fire technician.
Condition: Improper Installation
Due 6 June 2004
Resolved 28 October 2004
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 27 May 2004
Resolved
Install vent covers for P/S engine room ducts.
Due 6 June 2004
Resolved 28 October 2004
Resolution: Covers installed sat.
Lifesaving › Lifebuoys › Stowage
Issued 27 May 2004
Resolved
Repair hole in port fwd ring buoy
Due 6 June 2004
Resolved 28 October 2004
Resolution: Repair sat.
Fire Fighting › Fire Pumps
Issued 20 June 2003
Resolved
INSTALL FIXED FIRE PUMP (ELECTRICAL OR ENGINE DRIVEN) WITH A MINIMUM OF 2 FIRE HYDRANTS IN ACCORDANCE WITH 46 CFR 95.10-15. PORTABLE FIRE PUMP IS NOT RELIABLE AND NO LONGER ACCEPTABLE, ONLY AS A TEMPORARY PUMP UNTIL THIS ITEM IS CORRECTED. SUBMIT PLANS NOT LATER THAN 20JUL03. LEGACY COMPONENT DESC: Arrangement
Due 20 July 2003
Resolved 27 May 2004
Resolution: Reissued new requirement. Portable pump approved last year was not installed, required pump IAW ANCMS letter 24JUL03.
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 20 June 2003
Resolved
SUBMIT FOR APPROVAL, FIRE EXTINGUISHING PLANS TO MEET MINIMUM CUBIC FOOT TO AGENT REQUIREMENTS AND SHUTDOWN TO MAIN ENGINES/GENERATOR. LEGACY COMPONENT DESC: Quantity of Halon
Due 20 July 2003
Resolved 27 May 2004
Resolution: MA2-1500 installed horizontally, should be vertical.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 20 June 2003
Resolved
MAKE PERMANENT REPAIRS TO WASTED STEEL AT THE PORT MAIN ENGINE EXHAUST AND THE AFT HOUSE CONNECTION. LEGACY COMPONENT DESC: Piping (exhaust)
Due 20 July 2003
Resolved 27 May 2004
Resolution: repaired
Engineering › Fuel Oil Storage/Transfer System
Issued 20 June 2003
Resolved
REPAIR STARBOARD FUEL OIL REMOTE SHUTDOWN LEGACY COMPONENT DESC: Valve
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 May 2004
Resolution: witnessed repaired
Fire Fighting › Fixed Fire Detection System
Issued 20 June 2003
Resolved
REPLACE SMOKE DETECTORS AND/OR BATTERIES LEGACY COMPONENT DESC: Smoke Detectors
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 May 2004
Resolution: witnessed repaired
Electrical › Electric Generation Source (service)
Issued 20 June 2003
Resolved
REPAIR BATTERY TRAY LINER FLANGES. LEGACY COMPONENT DESC: Metallic Enclosure/Frame
Due 20 July 2003
Resolved 27 May 2004
Resolution: repaired
Electrical › Lighting (service)
Issued 20 June 2003
Resolved
REPLACE MISSING COVERPLATES IN ENGINE ROOM AND HOUSE LEGACY COMPONENT DESC: Outlet Box
Due 20 July 2003
Resolved 27 May 2004
Resolution: witnessed repaired
Construction/Loadline
Issued 19 March 2001
Resolved
RELOCATE ER BILGE ALARM CLOSER TO BILGE.
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Lifesaving
Issued 19 March 2001
Resolved
MAINTAIN TRAINING LOGBOOK TO INCLUDE DATE AND TYPE OF TRAING CONDUCTED.
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Construction/Loadline
Issued 19 March 2001
Resolved
REPAIR HOLE IN PORT SIDESHELL AFT OF FUEL TANK.
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Engineering
Issued 19 March 2001
Resolved
SECURE P/S MDE KEEL COOLER LINES TO PREVENT VIBRATION.
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Engineering
Issued 19 March 2001
Resolved
REPLACE STBD FO FLAME SCREEN.
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Electrical
Issued 19 March 2001
Resolved
REPLACE MISSING ELECTRICAL COVERPLATES THROUGHOUT VESSEL
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Construction/Loadline
Issued 19 March 2001
Resolved
REPLACE ROTTEN REAR CABIN DOOR.
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Navigation
Issued 19 March 2001
Resolved
RECORD EMERGENCY STEERING, FIRE DRILLS, AND EPIRB TESTS IN BRIDGE LOG
Condition: Unknown
Due 19 March 2001
Resolved 19 March 2001
Construction/Loadline
Issued 7 May 1999
Resolved
CLEAN-OUT BILGES OF SORBENTS AND OILY WATER. 46 CFR 176.830
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Construction/Loadline
Issued 7 May 1999
Resolved
REPLACE BILGE MANIFOLD MANIFOLD VALVE HANDLES IN WELL DECK. 46 CFR 182.510
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Accommodation/Occupational Safety
Issued 7 May 1999
Resolved
INSTALL APPROVED TYPE III MARINESANITATION DEVICE. 46 CFR 176.818 / _x001C_ 33 CFR 159.7
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Accommodation/Occupational Safety
Issued 7 May 1999
Resolved
REPLACE CRACKED AND FOGGED BRIDGE WINDOWS (3). 46 CFR 177.1010
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Lifesaving
Issued 7 May 1999
Resolved
REPLACE STERN RING BUOY WATERLIGHT BATTERY. 46 CFR 180.70
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Engineering
Issued 7 May 1999
Resolved
PROVIDE GENERATOR EXHAUST PROTECTION. 46 CFR 177.970
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Engineering
Issued 7 May 1999
Resolved
REPLACE STBD MAIN DECK FLAME SCREEN.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Engineering
Issued 7 May 1999
Resolved
REPLACE STBD MAIN MDE FUEL LINE FROM ELBOW TO FILTER. 46 CFR 182.770
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Navigation
Issued 7 May 1999
Resolved
PROVIDE CURRENT TIDE, TIDAL CURRENT AND COAST PILOT PUBLICATIONS. 46 CFR 184.420
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Construction/Loadline
Issued 27 December 1998
Resolved
MAKE PERMANENT REPAIRS TO HULL BOTTOM PLATING IWO STBD VOIDS #2 AND 3. CONDUCT NDT TO REPAIRS PRIOR TO REFLOATING VESSEL. ALL REPAIRS TO BE MADE TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 27 December 1998
Resolved 27 December 1998
Construction/Loadline
Issued 24 March 1998
Resolved
Gouge and reweld washed out welds on forward bottom plating.
Condition: Unknown
Due 1 April 1998
Resolved 3 April 1998
Engineering
Issued 24 March 1998
Resolved
Replace 2 fuel oil flame screens.
Condition: Unknown
Due 1 April 1998
Resolved 3 April 1998
Fire Fighting
Issued 24 March 1998
Resolved
Replace gasket on fire pump._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 April 1998
Resolved 3 April 1998
Construction/Loadline
Issued 24 March 1998
Resolved
Remove deck access plates and prepare for CG internal inspection.
Condition: Unknown
Due 1 April 1998
Resolved 3 April 1998
Documentation
Issued 24 March 1998
Resolved
Provide current current light list.
Condition: Unknown
Due 1 April 1998
Resolved 3 April 1998
Engineering
Issued 17 June 1997
Resolved
Repair and prove operation of the fwd stbd emergency fuel shut off
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Fire Fighting
Issued 17 June 1997
Resolved
Label fixed extinguishing system indicator on the bridge
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Lifesaving
Issued 17 June 1997
Resolved
Label Distress Signal Kit in accordance with 46 CFR 185.614
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Lifesaving
Issued 17 June 1997
Resolved
Stencil/label ring bouys with vessel name and hailing port
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Fire Fighting
Issued 17 June 1997
Resolved
Stencil/label fire axe with vessel name
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Construction/Loadline
Issued 17 June 1997
Resolved
Repair hole in weld around port exhaust at stern
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Construction/Loadline
Issued 17 June 1997
Resolved
Repaint name of vessel on Port & Stbd bow and stern
Condition: Unknown
Due 17 June 1997
Resolved 17 June 1997
Construction/Loadline
Issued 23 August 1996
Resolved
Portside shell plating, deck plating, frames and longitudnals in an area abeam of the pilot house, above the waterline, sustained damage due to a collision with another vessel.
Condition: Unknown
Due 29 August 1996
Resolved 29 August 1996
Construction/Loadline
Issued 4 March 1995
Resolved
Prove operation of bilge system.
Condition: Unknown
Due 4 March 1995
Resolved 10 March 1995
Engineering
Issued 4 March 1995
Resolved
Provide guards over pulleys on front of main engines.
Condition: Unknown
Due 4 March 1995
Resolved 10 March 1995
Engineering
Issued 4 March 1995
Resolved
Provide proper size vents to engine room.
Condition: Unknown
Due 10 March 1995
Resolved 10 March 1995
Documentation
Issued 4 March 1995
Resolved
Provide liferaft launching instructions.
Condition: Unknown
Due 4 March 1995
Resolved 10 March 1995
Fire Fighting
Issued 4 March 1995
Resolved
Relocate fixed HALON fire extinguisher in engine room to suitable location.
Condition: Unknown
Due 4 March 1995
Resolved 10 March 1995
Navigation
Issued 4 March 1995
Resolved
Provide compass deviation table.
Condition: Unknown
Due 7 April 1995
Resolved 10 April 1995
Engineering
Issued 4 March 1995
Resolved
Provide insulation or guarding around engine exhaust pipes aft of deck house.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Engineering
Issued 4 March 1995
Resolved
provide adequate flame screen on port side aft fuel tank vent.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Construction/Loadline
Issued 4 March 1995
Resolved
Securely mount electric submersible bilge pumps in engine room.
Condition: Unknown
Due 7 April 1995
Resolved 10 April 1995
Lifesaving
Issued 4 March 1995
Resolved
Properly mark survival suit stowage on bridge.
Condition: Unknown
Due 7 April 1995
Resolved 10 April 1995
Electrical
Issued 4 March 1995
Resolved
Block batteries in engine room from moving.
Condition: Unknown
Due 7 April 1995
Resolved 10 April 1995
Fire Fighting
Issued 4 March 1995
Resolved
Install fixed HALON fire extinguisher discharge indicator to bridge.
Condition: Unknown
Due 7 April 1995
Resolved 10 April 1995
Electrical
Issued 4 March 1995
Resolved
Provide proper wire trays in engine room for electrical wiring in overhead.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Electrical
Issued 4 March 1995
Resolved
Provide permanent wiring system for cargo deck electric submersible bilge pumps.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Lifesaving
Issued 4 March 1995
Resolved
Provide hand grabs and nonskid surface of deck on top of deck house in way of liferaft and EPIRB.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Electrical
Issued 4 March 1995
Resolved
Properly secure wiring to lighting and other equipment on mast.
Condition: Unknown
Due 10 April 1995
Resolved 10 April 1995
Fire Fighting
Issued 14 December 1990
Resolved
SERVICE ALL FIRE EXTINQUISHERS.
Condition: Unknown
Due 14 December 1990
Resolved 14 December 1990
Engineering
Issued 14 December 1990
Resolved
REMOVE THE FRESHWATER PUMP TO ELIMINATE XONNECTIONS NOT IN JUNCTION BOXES. DO THE SAME FOR CLUTCH TO GENERATOR IN FORECASTLE.
Condition: Unknown
Due 14 December 1990
Resolved 14 December 1990
Documentation
Issued 24 November 1989
Resolved
STABILITY TEST HAVING BEEN COMPLETED SUBMITT CALCULATIONS TO MSC IN WASHINGTON DC FOR STABILITY REVIEW AND ISSUANCE OF STABILITY LETTER
Condition: Unknown
Due 24 November 1989
Resolved 24 November 1989
Construction/Loadline
Issued 31 August 1988
Resolved
REPAINT NAME ON STERN OF VESSEL AS PER 46 CFR 32.05-10.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Fire Fighting
Issued 31 August 1988
Resolved
PROVIDE A B-IV FIRE EXTINGUISHER FOR THE VESSEL AS PER 46 CFR 34.10-5(A) AND 34.50-10(A).
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Electrical
Issued 31 August 1988
Resolved
REPAIR HANDLE TO SHORE TIE BREAKER IN GENERATOR ROOM AS PER 46 CFR 111.55-1
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Deck/Cargo
Issued 31 August 1988
Resolved
REPAIR HYDRAULIC LINE TO ANCHOR WINCH AS PER 46 CFR 32.15-15.
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Accommodation/Occupational Safety
Issued 31 August 1988
Resolved
PROVIDE LAGGING FOR EXHAUST PIPE FOR DIESEL STOVE AS PER 46 CFR 92.20-50(C)
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Documentation
Issued 31 August 1988
Resolved
PROVIDE A STABILITY LETTER FOR THE VESSEL AS PER 46 CFR 31.10-30 AND 170.160
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Deck/Cargo
Issued 31 August 1988
Resolved
PROVIDE CONTAINMENT AROUND PORT AND STBD AFT CARGO TANK VENTS AS PER 33 CFR 155.310
Condition: Unknown
Due 31 August 1988
Resolved 31 August 1988
Construction/Loadline
Issued 6 August 1986
Resolved
INSTALL A SUITABLE INSULATION MATERIAL BETWEEN THE ENGINE ROOM OVERHEAD AND THE WOOD FRAMING OF THE DECK HOUSE/ACCOMODATIONS.
Condition: Unknown
Due 6 August 1986
Resolved 6 August 1986
Deck/Cargo
Issued 6 August 1986
Resolved
LOAD TEST THE PORT AND STARBOARD CARGO GEAR (BOOMS AND RIGGING)
Condition: Unknown
Due 6 August 1986
Resolved 6 August 1986
Accommodation/Occupational Safety
Issued 6 August 1986
Resolved
PRIOR TO PLACING THE ACCOMODATING SPACE HEATER/STOVE IN OPERATION, INSTALL A SUITABLE INSULATION MATERIAL BETWEEN ANY WOODWORK OR OTHER COMBUSTIBLE MATERIALS.
Condition: Unknown
Due 6 August 1986
Resolved 6 August 1986
Construction/Loadline
Issued 6 August 1986
Resolved
UPON COMPLETION OF HYDRAULIC STEERING SYSTEM INSTALLATION, MAKE THE AFT ENGINE ROOM BULKHEAD WATER TIGHT.
Condition: Unknown
Due 6 August 1986
Resolved 6 August 1986
Construction/Loadline
Issued 11 June 1985
Resolved
AFFIX CAPTIVE CHAIN OR OTHER SEWRINS DEVICE TO LAZARETTE HATCH.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Electrical
Issued 11 June 1985
Resolved
SEVERE LOOSE ELECTRICAL CABLE IN CARGO HOLD.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Construction/Loadline
Issued 11 June 1985
Resolved
REPAINT VESSEL'S NAME ON HULL.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Fire Fighting
Issued 11 June 1985
Resolved
RECHARGE FOUR (4), BII HALON FIRE EXTINGUISHERS.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Lifesaving
Issued 11 June 1985
Resolved
AFFIX RETROREFLECTIVE TAPE, 100' LINE AND DETABHABLE LINK TO LIFEFLOAT.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Navigation
Issued 11 June 1985
Resolved
MOVE STERN LIGHT TO MORE VISIBLE/UNOBSTRUCTED LOCATION.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Construction/Loadline
Issued 11 June 1985
Resolved
PATCH WASTED AREA IN MAIN DECK.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985