Records from 2016 to 2023. Most recent: inspection, 10 February 2023.
Inspection history · 6
10 February 2023
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7634739
15 March 2021
Deficiency Check
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7156424
8 December 2020
PSC B · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7108085
15 January 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6337990
19 November 2016
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6042422
20 July 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5946962
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 10 February 2023
Resolved
All ships of 500 gross tonnage and upwards shall have a gyro compass heading repeater or other means, to supply heading information visually at the emergency steering position. Gyro compass in steering gear room has incorrect heading, compaired to bridge gyro.
74 SOLAS(2020) V/19.2.5.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2023
Resolved 8 March 2023
Resolution: PSCDO received documentation steering gear gyro has been repaired and properly operational.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 13 December 2020
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids.
Significant fuel oil leaks observed coming from number 2 and 5 aft fuel injectors of main propulsion engine.
IAW: 74 SOLAS (14) II-2/4.1.1
Action: 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 December 2020
Resolution: RO attended vessel, conducted operational test following repairs. Survey report (see "LETTER FROM CLASS NK") accepted.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 December 2020
Resolved
After any survey of the ship under regulations 7, 8, 9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration.
Temporary repair, in the form of a soft patch, found on pipe for port galley drainage located within engine room bottom level. Soft patch is immediately before overboard valve.
IAW: 74 SOLAS (14) I/11(b)
Action: 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 March 2021
Resolution: MSD Brownsville received NKK Class report satisfying the requirement.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 13 December 2020
Resolved
The purpose of this regulation is to maintain and monitor the effectiveness of the fire safety measures the ship is provided with. For this purpose, the following functional requirements shall be met: fire protection systems and fire-fighting systems and appliances shall be maintained ready for use.
Manual valve located after eductor for high-expansion foam system discharge to engine room found in closed position.
IAW: 74 SOLAS (14) II-2/14.1.1
Action required: 10 - Deficiency Rectified
Resolved 13 December 2020
Resolution: Opened valve
Construction/Loadline › Hull › Side Shell
Issued 20 July 2016
Resolved
33CFR 151.2050(f) Remove fouling organisms from the vessel's hull, piping, and tanks on a regular basis and dispose of any removed substances in accordance with local, state and federal regulations. Marine growth was present on the vessel's hull from bow to stern, port and starboard sides from the water line and above. 40c.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 November 2016
Resolved 19 November 2016
Resolution: NKK Class Report certifies that the deficiency was cleared during rcent dry dock.