TAINO is a 2018 freight ship. The Coast Guard has recorded 40 inspections since 2016, most recently in August 2025, along with 18 deficiencies — 3 with no resolution recorded —, 3 operational controls and 5 casualty investigations between 2019 and 2020.

Records from 2016 to 2025. Most recent: inspection, 19 August 2025.

Built
2018
Last inspected
19 August 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 19 August 2025
…with no type recorded7
…past their stated due date2
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9721970
WDJ6598
1278329
Flag
UNITED STATES
Maury page id
psix-1278329

Documentation record

Registered dimensions (L × B × D)689.6 ft × 105.8 ft × 59.1 ft
Registered tonnagegross 37,462 / net 11,339
ITC dimensions (L × B × D)689.6 ft × 105.8 ft × 59.1 ft
ITC tonnagegross 37,462 / net 11,339
BuilderVT HALTER MARINE INC · PASCAGOULA, MS, UNITED STATES · built 2018
Hull materialSteel
PropulsionDual Fuel (Diesel & Liquefied
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portJACKSONVILLE, FL
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 11 February 2026 · expires 28 February 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11339 - Convention (Subpart B), Net Ton
37462 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 40

19 August 2025 Packaged Hazmat Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8213137
12 August 2025 Packaged Hazmat Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8208012
5 August 2025 Packaged Hazmat Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8202779
29 July 2025 Packaged Hazmat Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8197289
2 July 2025 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8173552
8 April 2025 Administrative Inspection · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8109574
17 March 2025 ACP COI Oversight · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8094743
29 May 2024 Administrative Inspection · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7923074
28 November 2023 COI Inspection · Drydock Exam · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7830412
16 March 2023 Annual Inspection · ACP Annual Oversight
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7651405
13 January 2023 Bulk Liquid Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7621121
15 August 2022 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7534510
13 August 2022 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7532237
3 May 2022 Bulk Liquid Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7444375
13 December 2021 Underwater Inspection in lieu of Drydock · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7364599
13 December 2021 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7366026
2 March 2021 Bulk Liquid Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7148890
22 January 2021 Bulk Liquid Transfer Monitor
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7128956
12 January 2021 Deficiency Check · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7124078
15 December 2020 ACP Periodic Oversight · Periodic Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7108831
7 December 2020 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7107769
6 December 2020 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7107404
24 November 2020 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7101309
24 November 2020 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7104332
23 November 2020 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7103774
16 November 2020 In-Service Inspection · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7098759
4 September 2020 ACP Additional Oversight – Risk Assessment
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7050127
4 September 2020 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7050191
4 March 2020 Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6920429
18 February 2020 In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6913264
21 January 2020 Administrative Inspection · Annual Inspection · ACP Annual Oversight
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6885993
8 January 2020 Examination of Repairs · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6887076
26 November 2019 Construction Oversight · Administrative Inspection · Initial Construction-Excluding Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6862642
4 September 2019 Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6805607
16 April 2019 In-Service Inspection · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6665133
27 February 2019 Administrative Inspection · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6633500
25 February 2019 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6631642
7 January 2019 Bulk Liquid Transfer Monitor
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6606544
22 October 2018 Bulk Liquid Transfer Monitor
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6570574
16 March 2016 In-Service Inspection · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5835089

Deficiency record · 18

99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 September 2024 No resolution recorded
The storage tank used for liquefied gas should be an independent tank designed in accordance with the IGC code, Chapter 4.23. The vessel Port Engineer notified the USCG of the presence of Methane in the annular space of the #1 LNG tank (15%-20% by volume). Provide detailed repair proposal to USCG and Class for review. Vessel is approved for bunkering into the #2 and #3 LNG tanks if conditions below are met. 1. Maintain LNG tank #1 isolation, as per approved plan. 2. Provide daily trend analysis of temperature, pressure and vacuum of LNG tank #1 to USCG Sector Jacksonville. ***Report any abnormal changes of tank conditions to local OCMI and/or Sector Jacksonville OCMI.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 August 2024 Resolved
The storage tank used for liquefied gas should be an independent tank designed IAW the IGC code chapter 4.23. USCG received notification that the present of Methane was detected in the annular space of the #1 LNG tank (15% - 20% by volume). Per the proposal received, #1 LNG tank must be gas freed (gas freed plan must be submitted) and a detailed troubleshooting method plan be submitted to USCG and class for review and approval. Additionally, #2 & #3 LNG tank annular spaces must be checked for the present of Methane.Vessel is prohibited from bunkering ops until this issue is resolved and/or prior approval from the OCMI.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 September 2024
Resolved 17 September 2024
Resolution: Amended/updated CG-835V
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 19 August 2024 Resolved
Gas piping should be protected against mechanical damage and capable of assimilating thermal expansion without developing substantial tension. Fracture ID'd ON 1/2" High High alarm piping of #1 LNG Tank Connection Space. Vessel is prohibited from LNG bunkering and the LNG tank must be gas-freed per Marine Chemist report. Additionally, a repair plan must be submitted and approved prior to commencement of any work or operations.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2024
Resolved 16 September 2024
Resolution: Observed satisfactory RT and Pressure testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 January 2024 No resolution recorded
Demonstrate proper installation/operation of the BOG conversion to include all safeties, proper labeling controllers/breakers, and satisfying all comments on Marine Safety Center letter dated 23 Jan 2024.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024 — due date passed with no resolution recorded
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024 Resolved
Gas pipes should be colour marked based on the recognized standard. Properly label all LNG piping throughout the system.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 26 February 2024
Resolution: Colour marking installed on piping.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024 Resolved
Re-new and/or reinstall LNG piping and valve insulation coverings throughout the LNG system.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 26 March 2024
Resolution: Received confirmation from Chief Engineer.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024 No resolution recorded
Update the PSTP tasks and steps for the BOG conversion and Gas Detector that were removed, etc.
Condition: Invalid
Action required: 705 - Other - as specified
Due 23 February 2024 — due date passed with no resolution recorded
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024 Resolved
Demonstrate proper operations of the LNG high pressure pumps and the newly installed oil sump motors to the satisfaction of the attending Marine Inspector.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024
Resolved 26 February 2024
Resolution: New motors were witnes operating satisfactory.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024 Resolved
Replace broken bracket for the CCTV at the port LNG bunkering station.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 31 July 2024
Resolution: New CCTV cameras installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 January 2024 Resolved
Tank Connection Spaces (TCS) must maintain there Hazardous Area classification when the system is in operation. i.e. TCS door must be properly secured.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 26 March 2024
Resolution: Completed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 March 2023 Resolved
For container and general cargo spaces, the International Code for Fire Safety System (FSS Code) regarding the fixed CO2 system requires three control arrangements: one third, two thirds, and entire discharge. The vessels current arrangement/installation is full discharge only and must comply with the FSS Code that entry into force 01 July 2014.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2023
Resolved 30 March 2023
Resolution: Received DNV Survey Statement (CA) extending until 29 Jun 2023.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pollution report-MARPOL Annex I
Issued 12 January 2021 Resolved
Each operation shall be fully recorded in Oil Record Book Part I, so that all entries in the book appropriate to the operation are correct. A number of number of entries in the Oil Record Book are questionable for the OWS discharge overboard and training shall be provided on obtaining accurate tank sounding/entries.
Action required: 705 - Other - as specified
Resolved 5 February 2021
Resolution: Received documentary proof satisfying the requirement.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 15 December 2020 Resolved
THE MASTER SHALL BE PROVIDED WITH APPROPRIATE INFORMATION ON THE CARGO SUFFICIENTLY IN ADVANCE OF LOADING TO ENABLE THE PRECAUTIONS WHICH MAY BE NECESSARY FOR PROPER STOWAGE AND SAFE CARRIAGE OF CARGO TO BE PUT INTO EFFECT. SUCH INFORMATION SHALL BE CONFIRMED IN WRITING OR ELECTRONIC DATA TECHNIQUES PRIOR TO LOADING THE CARGO ON THE SHIP. THE COMPANY DOES NOT PROVIDE THE CARGO WATCH OFFICER WITH A PREDETERMINED LOADING OR DISCHARGE PLAN CONFIRMED BY ALL INVOLVED PARTIES PRIOR TO THE TRANSFER OF CARGO. THIS IS A DIRECT CONTRIDICTION TO THE REQUIREMENTS SET FORTH WITHIN THE VESSELS SHIPBOARD SAFETY MANAGEMENT SYSTEM. 74SOLAS (14) VI/2.1
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2021
Resolved 3 February 2021
Resolution: USCG is confident that the Owner has been working towards a resolution that meets the standards and requirements of SOLAS. USCG has accepted this progress as proof of compliance.
09 - Working and Living Conditions › 091 - Living Conditions › Ventilation (Accommodation)
Issued 24 November 2020 Resolved
The accommodation provided for officers and crew on all vesseld must be securely constructed, ventilated and isulated from undue noise, heat and odors. USCG Marine Inspector received notification of a potential hazardous (CH4, H2S, CO, HS, etc.) condition existing in the following spaces (intermittently): Accommodation, Bridge, and Engine Control Room while U/W. The above mentioned odors are being emitted through the vesses vessel intakes (intermittently). Vessel/Company to provide a corrective action plan to resolve this issue.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 December 2020
Resolved 8 January 2021
Resolution: Received a survey from class and authorization from CVC-4 to clear.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 28 March 2019 Resolved
PRECAUTIONS SHALL BE TAKEN TO PROTECT HIGH TEMPERATURE SURFACES AND HIGH PRESSURE CONNECTIONS FROM BECOMING AN IGNITION SOURCE. MI IDENTIFIED NUMEROUS OIL SOAKED PIPE FLANGE PROTECTION LAGGING AROUND THE MAIN ENGINE. 14 SOLAS II/2/4.2.2.6.2
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 April 2019
Resolved 10 April 2019
Resolution: Class Report (Job Id:1292051)
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 28 March 2019 Resolved
MAIN STEERING GEAR CIRCUIT PROTECTION MUST INCLUDE A THREE-PHASE SUPPLY. ALARM THAT WILL INDIICATE FAILURE OF ANY ONE OF THE SUPPLY PHASES. [name withheld] THAT THE #1 STEERING GEAR PUMP HAD AN INTERMITENT POWER FAILURE ALARM. 14 SOLAS II-1/30.3
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2019
Resolved 10 April 2019
Resolution: Class Report (Job Id:1292051)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 28 March 2019 Resolved
REASONABLE MEASURES SHALL BE TAKEN TO LIMIT THE ENTRY AND SPREAD OF WATER THROUGH BULKHEAD MOUNTED VENTILATORS. [name withheld] THAT THE EMERGENCY GENERATOR VENTILATOR/LOUVER IS ALLOWING WATER INGRESS FROM THE ABOVE DECK WATER RUN-OFF WHEN FULLY CLOSED. 14 SOLAS II-1/16-1.1
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2019
Resolved 10 April 2019
Resolution: Class Report (Job Id:1292051)
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 March 2019 Resolved
MEASURES SHALL BE TAKEN TO ENSURE THAT EQUIPMENT IS FUNCTIONING AND MADE READY FOR REGULAR INSPECTIONS TO ENSURE RELIABLE OPERATION. MI IDENTIFIED THAT THE EMERGENCY FIRE PUMP DOES NOT OPERATE AS DESIGNED. ONCE STARTED THE HEATER CIRCUIT DOES NOT DE-ENERGIZE AND THE CONTROL PANEL DOES NOT DISPLAY PUMP HAS BEEN ENERGIZED. 14 SOLAS II-1/46.2
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2019
Resolved 10 April 2019
Resolution: Class Report (Job Id:1292051)

Casualty record · 5

25 February 2019Routine · role: Involved in a Marine Casualty · activity 6631642
23 November 2020Routine · role: Involved in a Marine Casualty · activity 7103774
24 November 2020Routine · role: Involved in a Marine Casualty · activity 7104332
6 December 2020Routine · role: Involved in a Marine Casualty · activity 7107404
7 December 2020Routine · role: Involved in a Marine Investigation (non-casualty) · activity 7107769
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.