Records from 1997 to 2011. Most recent: inspection, 9 December 2011.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 3 October 2010
Resolved
Deck to the ECR, after section - in way of air conditioning unit, comprising A-60 fire boundary found temporarily repaired with partially fitted diamond plate where previously holed deck plate had been removed. Prior to departure from port, the insulation required to complete A-60 boundary integrity to be replaced to the satisfaction of the ACS (ABS). Permanent repairs to be made by DDX.
Action required: 705 - Other - as specified
Due 25 July 2011
Resolved 23 August 2011
Resolution: Inspected A-60 boundary and class approved doubler for replacement of diamond plate.
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 3 October 2010
Resolved
The flame screen for the dirty oil tank vent, port side, was found to be substantially deteriorated. Screen to be replaces, as required, with 7 days. 10 October 2010.
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 10 October 2010
Resolution: Received ABS annotated 835 list showing this item as rectified.
Lifesaving › Launching Appliances › Davit
Issued 3 October 2010
Resolved
The manufacturer's instruction manual for the combination rescue boat/liferaft launching appliance reflects a max lowering rating for a 15 person (up to 1400kg) liferaft. Vsl is currently provided w/ a 20 person davit launch-able liferaft. ABS is req to attest to the suitability of this arrangement & docs considering the Form E reflects that lifesaving appliances have been provided for 20 persons.
Action required: 705 - Other - as specified
Due 3 November 2010
Resolved 10 October 2010
Resolution: Received ABS annotated 835 list showing this item as rectified. Form E now reflects 15 persons.
Lifesaving › Launching Appliances › Winch
Issued 3 October 2010
Resolved
The hand-crank, provided as a means for manually slewing the rescueboat/liferaft launching appliance, is obstructed by the deck safety rails as the davit is slewed outward of the vessel, thus, hindering proper operation. The ACS (ABS) is to attest to the suitable arrangement for the manual slewing of this appliance within 30 days. 3 November 2010.
Action required: 705 - Other - as specified
Due 3 November 2010
Resolved 10 October 2010
Resolution: Received ABS annotated 835 list showing this item as rectified.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 3 October 2010
Resolved
Multiple tank vents and fire dampers (dry stores/laundry fire flap - poop deck, potable water vent - port side, forepeak tank vent - forward) found to be holed and wasted. Permanent repairs to be made to the satisfaction of class within 30 days. 3 November 2010.
Action required: 705 - Other - as specified
Due 3 November 2010
Resolved 10 October 2010
Resolution: Received ABS annotated 835 list showing this item as rectified.
Lifesaving › Rescue Boat Equipment › First Aid Kit
Issued 3 October 2010
Resolved
Provide on board a USCG approved first aid kit (under approval series 160.041) for the rescue boat as required by 46CFR199.175(b)(10) within 30 days. 3 November 2010.
Action required: 705 - Other - as specified
Due 3 November 2010
Resolved 22 October 2010
Resolution: Master provided notification and photographs of approved first aid kits being on board.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 3 October 2010
Resolved
*Item reported cleared via E-mail dated 1DEC10 & shall remain open until verified by CG MI*Vsl's ops man. for the maint dept not readily avail on board & the SMS fails to describe the duties & resp. of the maint. pers. as well as provisions for watch augmentation by approp. qual ratings forming the maint. depart.. Ops manual/job descr., as discussed in MSM Vol III to be sub. to the OCMI for review
Action required: 705 - Other - as specified
Due 25 July 2011
Resolved 23 August 2011
Resolution: SMS updated and ops manual onboard.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 08OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Fixed HP CO2 system found leaking. Leak has been secured and proper capacity remains for spaces protected by system per servicing agent. Service technician to inspect, repair, and certify prior to departure from second port, not to exceed 9 October 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 5 October 2008
Resolved
Hydrostatic release for starboard side liferaft has been installed upside down. Install as required in order to restore operational readiness prior to departure from port to satisfaction of attending USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2008
Resolution: Hydrostaic release has been installed correctly, item clear.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 5 October 2008
Resolved
Remove all barrels and gear stowed in way of port side liferaft prior to departure from port to satisfaction of attending USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2008
Resolution: Gear has been removed and access attained to liferaft. Item clear.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 5 October 2008
Resolved
Place a lifering with a line on the starboard side (one on each side required) of vessel prior to departure from port to satisfaction of attending USCG Marine Inspector.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2008
Resolution: Life line for lifering placed on station (starboard side) as required. Item clear.
Fire Fighting › Fire Main › Condition
Issued 5 October 2008
Resolved
Fire main found leaking past temporary repair (doubler approx. 2 ft.), port side, forward of superstructure. Make permanent repairs as original within 30 days to the satisfaction of USCG. 3 November 2008
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 November 2008
Resolved 5 October 2008
Resolution: Pipe removed and new pipe inserted. Satisfactory pressure tested with no leakage. Item clear.
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Roller bit (button) supports in way of bulwark starboard side bow, found cracked and holed. Make permanent repairs as original within 30 days to the satisfaction of USCG. 3 November 2008.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 16 October 2009
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Several hydraulic leaks noted on starboard side main deck, in way of cargo hold. Hydraulic leaks to be immediately cleaned. Leaks to be investigated and repaired within 30 days to the satisfaction of USCG. 3 November 2008.
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Structural - A Class Divisions › Flammable Liquids Storage Spaces
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*A60 fire insulation in paint locker found wasted and missing in way of entry point. Replace as original so as to restore operational readiness to the satisfaction of USCG within 30 days. 3 November 2008.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Several expired medications found mixed with valid medications in ship’s hospital. Expired medications to be removed and updated inventory to be provided to cognizant OCMI within 30 days. 3 November 2008.
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Fire damper to washer/dryer space on Master’s deck found holed and frozen (open). Make permanent repairs as original so as to restore operational readiness to the satisfaction of USCG within 30 days. 3 November 2008
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Fire damper, starboard side aft at poop deck, in way of fire locker is missing securing dog and is unable to close. Make repairs so as to restore operation readiness to satisfaction of USCG within 30 days. 3 November 2008
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Stability › Weathertight Integrity › General
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 21OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Forepeak tank vent cover found holed and wasted. Replace/repair as original to satisfaction of USCG within 30 days. 3 November 2008
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Ventilation Systems › Ducts
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Bottom slat for fire damper, starboard side forward in way of paint locker, found to be missing. Replace as original to satisfaction of USCG within 30 days. 3 November 2008
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Navigation › Piloting/Steering › Gryo Compass Repeater
Issued 5 October 2008
Resolved
Gyro repeater on flying bridge found with a 4 degree error from gyro compass. Make repairs to as to restore proper readings to satisfaction of USCG within 30 days. 3 November 2008 **Extended to 3 Dec 08**
Action required: 705 - Other - as specified
Due 3 December 2008
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Communications › Radio Communications › Emergency Source of Power
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Containment boxes for GMDSS backup batteries, located on flying bridge, found missing their closing clamps. Containment boxes are currently secured with line and cords. Replace clamps as original to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Replace navigation lights found inoperative on after mast to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Exhaust pipe (suction side) for Vessel’s fixed sniffing system (flying bridge) found holed and wasted. Make permanent repairs within 30 days to satisfaction of USCG. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Navigation › Piloting/Steering › Magnetic Compass
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 13NOV08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Secondary light bulb for magnetic compass found inoperative. Make repairs to restore operational readiness within 30 days to satisfaction of USCG. 3 November 2008 **Extended to 3 Dec 08**
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 16 October 2009
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Side screens for Vessel’s side navigation lights (running lights) found painted white. Paint MATT BLACK as required to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Stability › Watertight Integrity › General
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Replace as necessary missing nuts and bolts to forepeak man hole cover located in Bosun Locker to the satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Rescue Boat Equipment › Instructions (engine start/operation)
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 24OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Properly mount launching and recovery instructions for Vessel’s rescue boat to the satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Lifeboat Equipment › Instructions (engine start/operation)
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 24OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Properly post and provide updated launching and recovery instructions (manufacturer approved) for Vessel’s lifeboat to cognizant OCMI within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Fire Hydrants › Condition
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Fire stations #7, #9, and #11 found damaged. Replace/repair as original to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Nozzles › Condition
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Inspect and repair as necessary all navy-all-purpose nozzles. Specifically the high velocity adaptor tips missing chains and locking mechanisms to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Inflatable Liferafts › Markings
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 24OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Starboard side liferaft found to be missing identification card. Provide means of identifying liferaft from outside of container as required to the satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Heeling tank (WT2) float switch (accessible from starboard side tunnel) found damaged and broken from mounting. Make repairs as original to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Electrical › Electric Supply System (service) › Cable
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Electrical junction box, accessible from starboard side tunnel, found loose from its mounting and hanging by wires. Make repairs as original to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 5 October 2008
Resolved
Steering gear repeater on bridge has 3 degree error from rudder when operating in non-follow-up mode when both pumps are operating independently. Make repairs so rudder angle indicator reports accurately to satisfaction of USCG within 30 days. 3 November 2008 **Extended to 3 Dec 08**
Action required: 705 - Other - as specified
Due 3 December 2008
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Inflatable Liferafts › Markings
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified*IMO placards mounted on vessel incorrectly indicate that starboard side liferaft is davit launched. The port side liferaft is davit launched, the davit on the starboard side is a stores crane only. Properly mount correct IMO placards to as to avoid confusion to satisfaction of USCG within 30 days. 3 November 2008
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 16 October 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Brackets for mounted light fixtures, located on the bridge deck aft of wheel house port side in way of funnel, found wasted. Repair/replace as original to satisfaction of USCG within 30 days. 3 November 2008
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 16 October 2009
Lifesaving › Lifeboat › Markings
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 24OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Renew reflective tape and top view identification markings for lifeboat to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Rescue Boat › Markings
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Renew rescue boat bow markings (vessel name and port of registry) to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Vessel does not have an original copy of the SOLAS Safety Equipment Certificate or Form E on board. Only a copy was provided. Original to be provided on board within 7 days to satisfaction of USCG. 12 October 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 open until verified*Safety Equipment Certificate Form E reports that Vessel is fitted with equipment not found on board; ECDIS and LRITS. Additionally, the second marine radar type (9 GHz) is not indicated. Certificate issuing authority (ABS) to carry out survey of equipment fitted on board and update Form E accordingly.
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Electrical › Electrical Distribution System (emergency) › Metallic Enclosure/Frame
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 21OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide battery boxes for all spare batteries on board the vessel. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Properly install the forward main engine room bilge alarm. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Post operating instructions for the oily water separator for use during operation. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Engineering › Freshwater System (jacketwater cooling) › Power Supply
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Remove dead end wire on SSDG #2 cooling water supply pump. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Electrical › Lighting (service) › Lighting Fixture
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Repair light fixture above SSDG #2 cooling pump. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Electrical › Lighting (service) › Lighting Fixture
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Repair light fixture above Marine sanitation device. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Ventilation Systems › Fans
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Properly wire permanently installed ventilation fans in engine space as per 46 CFR subchapter J. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Install storm rails on landing for the main engine space. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 29OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide a new pilot ladder for the port side of the vessel. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Modify current rescue boat launching procedures so embarkation is conducted only on the embarkation deck. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Deck/Cargo › Marine Portable Tanks › Securing Device
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Ensure all high pressure cylinders are properly stored off the deck with covers and proper restraints. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Install flame screens on the Fuel vents on the cargo walk way port and starboard. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Lifesaving › Emergency Outfit › Protective Clothing
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide Hard hats with chin straps for all personnel during launching and recovery of the vessels lifeboat and rescue boat. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Fire Pumps › Pressure
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Prove proper operation of the pressure gauge on the emergency fire pump, and repair wiring on the emergency fire pump. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 5 October 2008
Resolved
Install lagging on the main engine exhaust. Lagging currently installed in not sufficient to protect personnel and equipment. 3 November 2008 **Extended to 31 Dec 08**
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 9 December 2008
Resolution: Recieved email and pictures from company
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide proper test equipment for the fire detector sensors on the vessel. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 5 October 2008
Resolved
Establish means to test the over speed alarms and shutdowns on main engine and ship service diesel generators, tests to be conducted during next exam. 3 November 2008
Action required: 705 - Other - as specified
Due 3 November 2008
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Documentation › Certificates/Documents › Cargo Ship Safety Construction Certificate
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*SOLAS Safety Construction Certificate does not reflect last inspection of outside of Vessel’s hull carried out in 8-13 Aug 2008. Issuing authority to update certificate accordingly or advise if not a credit drydock. 12 October 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Documentation › Manuals/Policy Documentation › Training Manual (lifesaving)
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 29OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*SOLAS training manual located in crew and officer’s mess room does not incorporate information for Vessel’s rescue boat. Updated SOLAS training manual accordingly to satisfaction of USCG within 30 days. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 24OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Remove mechanical hold backs for self closing fire doors (Class A boundaries), specifically located at forward entrance to galley from officer’s mess and at door aft of pantry in order to restore operational readiness to satisfaction of USCG. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Self closing fire door (Class A boundary) for crew’s laundry room inoperative and unable to close properly. Make repairs in order to restore operational readiness to satisfaction of USCG. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 16 October 2009
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Life jacket found without req. equipment (whistle) in crew member’s stateroom. Master to carryout inspection of all life jackets and immersion suits and certify all that all required equipment is in place and functional to satisfaction of USCG. 12 October 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail dated 20OCT08 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Light fixture in AB #2 stateroom found holed and broken. Make repairs as original to satisfaction of USCG. 3 November 2008
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 11 November 2008
Resolution: Item inspected by attending USCG Marine Inspector, found satisfactory.
Personnel › Certificates/Documents/Licenses › License, GMDSS Radio Operator
Issued 5 October 2008
Resolved
*Item reported cleared via E-mail, 28JAN09, shall remain open until verified*Two of the required four GMDSS radio operator’s, Master and Second Officer, are missing STCW Reg IV/2 annotation from STCW Endorsement/Certificate. Both officers hold valid FCC endorsements. Vessel’s Master to certify that above indicated certificates are correct within 60 days. 3 December 2008 **Extended to 31 Jan 09**
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 16 October 2009
Personnel › Certificates/Documents/Licenses › License, Chief Mate
Issued 5 October 2008
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Due 25 October 2009
Resolved 16 October 2009
Engineering › Bilge Water Management System › Piping
Issued 24 August 2008
Resolved
Vessel is to cease using the cargo hold pumping operation which is designed to pump the bilges directly overboard. Vessel is to use the installed bilge system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 September 2008
Lifesaving › Launching Appliances › Winch
Issued 24 August 2008
Resolved
Prove proper operation of the life boat launching system. This is to include a launch of the life boat and the recovery of the life boat using the vessels recovery system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 September 2008
Resolution: Witnessed successful launch and recovery of the vessels freefall lifeboat. The vessel to conduct another launching during the annual inspection.
Construction/Loadline › Hull › Hull Plating
Issued 11 July 2008
Resolved
Hull in way of bow severely damaged due to collision ooa 07Jul2008. Repairs to the satisfaction of the attending USCG Marine Inspector prior to departure from UAE.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 September 2008
Resolution: Received ABS damage survey; all sat.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 13 September 2004
Resolved
Firestop missing in several bulkhead electrical penetrations.
Action required: 705 - Other - as specified
Resolved 13 September 2004
Resolution: Vessel corrected deficiency through SMS procedures. Firestop on order.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 5 January 2004
Resolved
Vessel experienced accidental discharge of fixed CO2 system. Repairs and replenishment to be accomplished prior to the vessel resuming operations. Vessel permitted to return to Singapore to complete repairs and replenishment. Vessel is not permitted to carry cargo in its cargo holds. LEGACY COMPONENT DESC: Quantity of CO2
Action required: 705 - Other - as specified
Resolved 24 January 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 17 December 2003
Resolved
Make permanent repairs and replenishment of fixed CO2 system. Vessel is authorized to transit from [name withheld] B.I.O.T. to Singapore to conduct repairs. Vessel is not permitted to carry cargo in its cargo holds during transit. Vessel is to notify USCG MIDET Singapore upon its arrival in SIN.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2003
Resolution: Vessel is ACP - ABS. Repairs and replenishment of system witnessed and verified by ABS Singapore this date.
Lifesaving › Launching Appliances
Issued 3 October 2003
Resolved
Demonstrate proper operation of stern launched lifeboat winch. Brake failed weight test. Winch is to be repaired or replaced and weight tested. Vessel is not prohibited from operating prior to completion of repair. LEGACY COMPONENT DESC: Winch Brake
Action required: 705 - Other - as specified
Due 4 November 2003
Resolved 30 October 2003
Resolution: Winch was replaced and weight tested this date. All satisfactory.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 5 September 2003
Resolved
Install a Coast Guard approved fixed fire-fighting system dedicated to the emergency diesel generator room by 30 November 2003.
Action required: 705 - Other - as specified
Due 30 December 2003
Resolved 30 December 2003
Lifesaving › Lifebuoys › Stowage
Issued 25 October 2002
Resolved
Properly mark life buoy stowage locations.
Condition: Unknown
Due 25 October 2002
Resolved 25 October 2002
Resolution: Left as a verbal requirement.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 October 2002
Resolved
Place metal wire ties or other metallic supports for newly installed electrical cables.
Condition: Improper Installation
Due 25 October 2002
Resolved 25 October 2002
Resolution: Left as a verbal requirement.
Construction/Loadline › Penetrations
Issued 25 October 2002
Resolved
Make permanent repairs to wasted goose necked kick pipes adjacent to cargo holds to ensure proper watertight integrity. LEGACY COMPONENT DESC: Electrical Cable Penetrations
Condition: Improper Installation
Due 25 October 2002
Resolved 25 October 2002
Resolution: Left as a verbal requirement.
Accommodation/Occupational Safety › Ventilation
Issued 25 October 2002
Resolved
Properly place screens on engine room ventilation duct outlets. LEGACY COMPONENT DESC: screens
Condition: Improper/Lack of Maintenance
Due 25 October 2002
Resolved 25 October 2002
Resolution: Lefts as a verbal requirement.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 25 October 2002
Resolved
Properly mark engine room emergency exit.
Condition: Improper/Lack of Maintenance
Due 25 October 2002
Resolved 25 October 2002
Resolution: Exit was properly marked.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 25 October 2002
Resolved
Properly inspect CO2 piping to cargo hold by removing all corrosion and provide findings to attending inspector. If repairs are necessary provide evidence of notification to ABS, vessel's ACP classification society.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 November 2002
Resolved 8 November 2002
Resolution: Inspection revealed extensive wastage. ABS has been notified and will approve all repairs.
Fire Fighting › Structural Fire Protection - General
Issued 25 October 2002
Resolved
Provide proper door closures on A-Class doors in Galley; LEGACY COMPONENT DESC: Cooking Area
Condition: Improper Installation
Due 25 October 2002
Resolved 25 October 2002
Resolution: Left as verbal requirement.
Navigation › Piloting/Steering
Issued 17 October 2002
Resolved
Make permanent repairs to Gyro compass. Vessel is to maintain two magnetic compasses, each with current deviation tables. Vessel must also maintain operable GPS to ensure additional means of determining course is available. LEGACY COMPONENT DESC: Gyro Compass
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 November 2002
Resolved 25 October 2002
Resolution: Gyro-compass was repaired and placed back in service.
Fire Fighting
Issued 6 July 2000
Resolved
STORAGE TUBES FOR VESSEL'S FIRE CONTROL PLAN NEED TO BE MARKED FOR EASY IDENTIFICATION. SOLAS 74 II-2/20
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Lifesaving
Issued 6 July 2000
Resolved
ENSURE VESSEL'S EMBARKATION LADDER IN ABLE TO REACH THE WATER'S EDGE WITH SHIP IN ANY LOADED CONDITION AND AT A 15 DEGREE LIST AS REQUIRED BY SOLAS 74 III/11.7.
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Fire Fighting
Issued 6 July 2000
Resolved
UPDATE FIRE CONTROL PLAN AND EMERGENCY EQUIPMENT MARKINGS (STICKERS) USING CURRENT IMO SYMBOLOGY AS REQUIRED BY SOLAS 74 II-2/20.
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Navigation
Issued 6 July 2000
Resolved
VESSEL NEEDS A COPY OF U.S. COAST PILOT ON BOARD AS REQUIRED BY 33 CFR 164.33 (a)(2)(i).
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Navigation
Issued 6 July 2000
Resolved
ECHO DEPTH SOUNDING DEVICE INOPERABLE. 33 CFR 164.35(h)
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Lifesaving
Issued 6 July 2000
Resolved
ENSURE THAT VESSEL'S EPIRB IS CAPABLE OF BEING FLOAT FREE AS REQUIRED BY SOLAS 74 IV/7.1.6.4.
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Engineering
Issued 6 July 2000
Resolved
ENSURE OIL TRANSFER PROCEDURES ARE IN ACCORDANCE WITH 33 CFR 155.750
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Lifesaving
Issued 6 July 2000
Resolved
DETERMINE IF MISSING ALARM IN STEERING GEAR ROOM IS REDUNDANT. IF SO, REMOVE DEAD END WIRING. SOLAS 74 II-2/52
Condition: Unknown
Due 25 October 2000
Resolved 25 October 2000
Unknown
Issued 17 April 1999
Resolved
DISTRESS SIGNALS ON NAV BRIDGE & LIFEBOAT EXPIRED
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999
Unknown
Issued 17 April 1999
Resolved
FACT SHEET MISSING WARNING STATEMENT
Condition: Unknown
Due 11 August 1999
Resolved 11 August 1999