Records from 2016 to 2026. Most recent: inspection, 22 June 2026.
Inspection history · 23
22 June 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8410699
21 April 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8353668
14 April 2026
Administrative Inspection · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8349447
4 March 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8088262
30 October 2024
PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8020425
7 March 2024
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7875774
7 March 2024
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7877182
4 March 2024
Explosive Handling Operation-Administrative · Explosive Handling Operation-Commercial
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7874134
21 December 2022
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7611739
15 October 2022
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7578867
15 August 2021
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7283730
11 December 2020
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7103673
4 September 2020
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7048563
24 February 2020
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6914419
18 February 2020
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6911117
21 August 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6785486
18 February 2019
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6626653
21 August 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6518552
17 August 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6237543
19 April 2017
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6128214
19 April 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6128288
18 August 2016
Deficiency Check · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5986778
16 August 2016
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5963832
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 April 2026
Resolved
MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LEAKS.
PSCO OBSERVED FUEL OIL LEAKS ON THE #2,#3,& #6 FUEL INJECTOR PUMPS ON THE MDE. 74 SOLAS (24) II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 1 December 2026
Resolved 21 April 2026
Resolution: PSCO received Class Survey Report attesting to rectification of deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 April 2026
Resolved
SURFACES WITH TEMPERATURES ABOVE3 220 CELSUIS WHICH MAY BE IMPINGED AS A RESULT OF A FUEL SYSTEM FAILURE SHALL BE PROPERLY INSULATED. PSCO OBSERVED MULTIPLE FUEL OIL SOAKED LAGGING ON THE MDE UNDER FUEL INJECTOR PUMPS #2, #3, & #6.
74 SOLAS (24) II-2/2.2.6.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 1 December 2026
Resolved 21 April 2026
Resolution: PSCO received Class Survey Report attesting to rectification of deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 April 2026
Resolved
THE MACHINERY...ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN & CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED & SHALL BE SO INSTALLED & PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD. PSCO OBSERVED STEERING GEAR PUMPS #1 & #2 LEAKING HYDRAULIC OIL & EXCESSIVE HYDRAULIC OIL IN BILGE DURING STEERING TEST.
74 SOLAS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 1 December 2026
Resolved 21 April 2026
Resolution: PSCO received Class Survey Report attesting to rectification of deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 April 2026
Resolved
THE MACHINERY...ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN & CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED & SHALL BE SO INSTALLED & PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD. PSCO OBSERVED THE PIPE SUPPORT FOR THE HEAVY FUEL OIL PUMP SLUDGE DISCHARGE LINE WAS FOUND TO BE FRACTURED & COMPLETELY DETACHED ON PUMPS #1 & #2. IT CREATES HIGH RISK OF FUEL RELEASE ONTO HOT SURFACES OF ADJACENT MACHINERY.
74 SOLAS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 1 December 2026
Resolved 21 April 2026
Resolution: PSCO received Class Survey Report attesting to rectification of deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 March 2024
Resolved
The machinery, boilers, and other pressure vessels, associated piping systems, and fittings shall be of a design and construction adequate for the service for whcih they are intended. PSCO was notified that the vessel lost propulsion while mooring at the Port of Everett. Provide class report to Sector [name withheld] attesting that main engine is fit for full service.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2024
Resolution: Received class report attesting to proper operation of the main engine.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 14 December 2020
Resolved
SELF-CLOSING DOOR TO FIRE BOUNDARY WAS HELD BACK IMPROPERLY/BLOCKED
Action required: 10 - Deficiency Rectified
Due 14 December 2020
Resolved 14 December 2020
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 11 December 2020
Resolved
OIL RECORD BOOK MISSING DATA ENTRY FOR WEEKLY SOUNDING OF STUFFING DRAIN TANK
Action required: 10 - Deficiency Rectified
Due 14 December 2020
Resolved 14 December 2020
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 4 September 2020
Resolved
Every line-throwing appliance shall include not less than four lines, each having a breaking strength of not less than 2kN. Ship has only one line-throwing appliance.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 September 2020
Resolution: Delivery note, statment, and photographic evidence of 04 line throwing devices resupplied to vessel.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 4 September 2020
Resolved
In meeting these requirements the company should ensure that: any non-conformity is reported, with its possible cause, if known. Non-conformity was not reported in a timely fashion in accordance with the ships SMS.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 4 September 2020
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 February 2020
Resolved
The following basic principles underlie the regulations in this chapter and are embodied in the regulations as appropriate, having regard to the type of ships and the potential fire hazard involved; restricted use of combustible materials. PSCO observed 02 drums of oil soaked rags uncovered in engine room.
Action required: 10 - Deficiency Rectified
Resolved 24 February 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 February 2020
Resolved
Not less than one half of the total number of lifebuoys shall be provided with lifebuoy self igniting lights. PSCO observed the arrangement of the lifebuoys with self igniting lights would not allow for automatic ignition of the lights.
Action required: 10 - Deficiency Rectified
Resolved 24 February 2020
01 - Certificates & Documentation › 013 - Documents › SOPEP
Issued 21 August 2019
Resolved
Shipboard oil pollution emergency plan shall consist at least of the list of authorities or persons to be contacted in the event of an oil pollution incident. The port contact list has not been updated with the JUL 30th update.
MARPOL Annex I, Reg 37.2.2
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 22 September 2019
Resolved 22 August 2019
Resolution: Vessel Master received updated port contact list from company DPA.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 August 2018
Resolved
74SOLAS (2014 cons.) CH1 REG.11(b)- After any survey of the ship under regulations 7,8,9 or 10 has been completed, no change shall be made in the equipment and any other items covered by the survey, without the sanction of the adminstration. Multiple electrical equipment located in shower room installed incorectly and not up to standard, creating a shock hazard. 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 October 2018
Resolution: Recieved class report attesting to repairs
Engineering › Diesel Engine (propulsion-direct drive) › Blower, Centrifugal
Issued 19 April 2017
Resolved
Vessel suffered loss of main propulsion while inbound to Los Angeles/Long Beach. Suspected blower failure. Class to attend vessel and conduct investigation.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 April 2017
Resolved 20 April 2017
Resolution: NKK attended vessel at berth and witnessed satisfactory operation of the main propulsion system. PSC has reviewed and accepted class survey report. Vessel is free to sail.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 16 August 2016
Resolved
0999-other (safety in general)-cylinders, while not in use, must always be secure and stowed in a rack in an upright position with the valve protection cap in place. Cylinders out of use were not stored in a rack.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 18 August 2016
Operations/Management › Pollution › Ballast Water Management
Issued 16 August 2016
Resolved
9900- Other (not clearly hazardous)-Rinse anchors and anchor chains when the anchor is retrieved to remove organisms and sediments at their places of origin. Starboard anchor has mud on it. Last location that the vessel was anchored was in Japan.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 18 August 2016