Records from 1988 to 1996. Most recent: inspection, 15 February 1996.
Documentation record
Registered dimensions (L × B × D)30.0 ft × 12.0 ft × 5.9 ft
Registered tonnagegross 14 / net 9
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderWELDCRAFT STEEL & MARINE · BELLINGHAM WA, UNITED STATES · built 1974
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portUNALASKA, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14 - Regulatory (Subpart C or D), Gross Ton
9 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 20
15 February 1996
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1189731
14 August 1995
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 871855
12 September 1994
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 159846
19 May 1994
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1170281
27 April 1994
COI Inspection · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1453033
14 April 1993
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1436750
13 October 1992
Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 956740
8 June 1992
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 953172
12 May 1992
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1259492
2 July 1991
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 939368
5 June 1991
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1327634
28 May 1991
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1240542
15 May 1991
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 924596
15 May 1991
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1236013
7 August 1990
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1238521
11 July 1990
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 911987
3 April 1990
Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1220292
16 May 1989
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 896880
15 December 1988
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 899220
19 May 1988
Plan Review "T" Boat · Initial Certification · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1195642
Engineering
Issued 27 April 1994
Resolved
CONDUCT SATISFACTORY TEST OF PROPULSION SYSTEM PRIOR TO CARRIAGE OF PASSENGERS OR COMPLIANCE DATE, WHICH EVER OCCURS FIRST.
Condition: Unknown
Due 27 April 1994
Resolved 27 April 1994
Construction/Loadline
Issued 27 April 1994
Resolved
CONDUCT SATISFACTORY TEST OF BILGE SYSTEM PRIOR TO CARRIAGE OF PASSENGERS OR COMPLIANCE DATE, WHICH EVER OCCURS FIRST.
Condition: Unknown
Due 27 April 1994
Resolved 27 April 1994
Navigation
Issued 12 May 1992
Resolved
PROVIDE FUNCTIONAL MASTHEAD LIGHT.
Condition: Unknown
Due 12 May 1992
Resolved 12 May 1992
Engineering
Issued 12 May 1992
Resolved
INSTALL METALLIC VENTILATION DUCTS TO EXTEND AS NEAR AS PRACTICAL TO BILGE IN LAZARETTE. REMOVE EXISTING "DRYER" HOSE.
Condition: Unknown
Due 12 May 1992
Resolved 12 May 1992
Construction/Loadline
Issued 12 May 1992
Resolved
PROVIDE OPERATIONAL INDICATING LIGHT ON FLYING BRIDGE AND PILOT HOUSE FOR AUTOMATIC BILGE PUMP IN ENGINE ROOM.
Condition: Unknown
Due 12 May 1992
Resolved 12 May 1992
Deck/Cargo
Issued 15 May 1991
Resolved
PROVIDE MEANS TO DEWATER FORWARD COMPARTMENT.
Condition: Unknown
Due 15 May 1991
Resolved 15 May 1991
Fire Fighting
Issued 15 May 1991
Resolved
PROVE SATISFACTORY OPERATION OF HALON INDICATOR LIGHT.
Condition: Unknown
Due 15 May 1991
Resolved 15 May 1991
Engineering
Issued 15 May 1991
Resolved
PROVIDE FLAME IMPINGEMENT BOWL FOR RACOR FUEL FILTER.
Condition: Unknown
Due 15 May 1991
Resolved 15 May 1991
Lifesaving
Issued 11 July 1990
Resolved
VESSEL IS RESTRICTED TO NO MORE THAN NINE TOTAL PERSONS UNTIL SEVEN ADDITIONAL ADULT PFD'S ARE PROVIDED.
Condition: Unknown
Due 11 July 1990
Resolved 11 July 1990
Engineering
Issued 11 July 1990
Resolved
PROVIDE A FLAME IMPINGMENT BOWL FOR THE FUEL FILTER.
Condition: Unknown
Due 11 July 1990
Resolved 11 July 1990
Engineering
Issued 11 July 1990
Resolved
PROVIDE PROPER FITTINGS FOR THE FUEL LINE CONNECTIONS AT THE FUEL FILTER.
Condition: Unknown
Due 11 July 1990
Resolved 11 July 1990
Construction/Loadline
Issued 11 July 1990
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE MAKE THE ENGINE ROOM HATCHES WATERTIGHT.
Condition: Unknown
Due 11 July 1990
Resolved 11 July 1990
Engineering
Issued 3 April 1990
Resolved
MAKE VESSEL AVAILABLE SO ENGINES CAN BE RUN TO DEMONSTRATE THERE ARE NO EXHAUST LEAKS IN NEWLY REPAIRED EXHAUST PIPING.
Condition: Unknown
Due 3 April 1990
Resolved 3 April 1990
Engineering
Issued 3 April 1990
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE MAKE FLEXIBLE HOSE CONNECTION OF PORT EXHAUST PIPE IN WAY OF TRANSOM PENETRATION WATERTIGHT.
Condition: Unknown
Due 3 April 1990
Resolved 3 April 1990
Accommodation/Occupational Safety
Issued 19 May 1988
Resolved
PROVIDE MEANS OF CLOSURE FOR ENGINE ROOM VENTS AS REQUIRED BY 46 CFR 181.20-35
Condition: Unknown
Due 19 May 1988
Resolved 19 May 1988