Records from 2017 to 2020. Most recent: inspection, 3 January 2020.
Inspection history · 9
3 January 2020
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6884691
5 December 2019
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6868125
7 October 2019
COC-CVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6829437
6 February 2019
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6620849
27 December 2018
COC-CVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6603286
1 December 2017
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6316412
23 October 2017
ISPS III Exam · Ballast Water Examination · COC-CVE Initial
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6293100
6 July 2017
COC-CVE Initial Prep
Type not classified · Activities Europe · Activity 6199237
2 May 2017
Construction Oversight
Physical examination · Activities Europe · Activity 6136910
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 7 October 2019
Resolved
All access openings in bulkheads shall be of equivalent strength to the un-pierced bulkhead and be weathertight when closed. Door leading to open deck on bow from accommodation space on deck 3 and doors leading to the forward mooring deck were not weathertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 November 2019
Resolved 5 December 2019
Resolution: VSL POC provided documentation attesting that the door leading to open deck on bow from accommodation space on deck 3 and doors leading to the forward mooring deck were weathertight.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 December 2018
Resolved
0750 - Where "A" class divisions are penetrated such penetrations shall be tested in accordance with the Fire Test Procedures Code..such penetrations shall be suitably insulated by extension of the insulation at the same level of the division. Electrical locker deck 2 MVZ 2 (2.2.02) has an open penetration in the deck leaving it open to the space below. 74 SOLAS (14 Cons) II-2/9.3.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2019
Resolved 6 February 2019
Resolution: Electrical locker deck penetration fitted with welded insert to restore A-0 class boundary.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 27 December 2018
Resolved
0750 - Structural fire protection and protection of openings and penetrations in these divisions shall be kept in good order to ensure their required performance if a fire occurs. Release buttons for rolling fire shutters at World Cafe and Pool Grill do not release the shutters as indicated. Remote release and automatic release is functional. 74 SOLAS (14 Cons) II-2/14.2.1.1.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2019
Resolved 6 February 2019
Resolution: Roller shutters at World Cafe and Pool Grill adjusted and put on weekly maintenance schedule.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 27 December 2018
Resolved
0999 - Escape doors from public spaces that are normally latched shall be fitted with a means of quick release. Escape doors from the Wintergarden are capable of being latched closed and are not fitted with a quick release mechanism. 74 SOLAS (14 Cons) II-2/13.3.2.6.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2019
Resolved 6 February 2019
Resolution: Locks to escape doors from Wintergarden public space disengaged permanently.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 27 December 2018
Resolved
0925 - Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. STBD side liferaft team was unable to deploy a liferaft within the required time during the abandon ship drill. 74 SOLAS (14 Cons) III/19.2.1
Action required: 10 - Deficiency Rectified
Due 27 December 2018
Resolved 27 December 2018
Resolution: Liferaft team was able to successfully deploy a liferaft upon second attempt within the required time limit.