TAZLINA is a 2018 passenger vessel (inspected). The Coast Guard has recorded 27 inspections since 2019, most recently in June 2025, along with 24 deficiencies — 1 with no resolution recorded — and 2 casualty investigations in 2019.
Records from 2019 to 2025. Most recent: inspection, 12 June 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Registered dimensions (L × B × D)252.3 ft × 67.0 ft × 20.0 ft
Registered tonnagegross 2,522 / net 1,982
ITC dimensions (L × B × D)252.3 ft × 67.0 ft × 20.0 ft
ITC tonnagegross 5,516 / net 1,654
BuilderVIGOR ALASKA LLC · Ketchikan, AK, UNITED STATES · built 2018
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portVALDEZ, AK
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it5304 - Dead Weight, Ton 2081 - Displacement, Ton 5516 - Convention (Subpart B), Gross Ton 2522 - Regulatory (Subpart C or D), Gross Ton 1654 - Convention (Subpart B), Net Ton 1982 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
Inspection history · 27
12 June 2025Administrative Inspection · Deficiency Check
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 28 April 2022Resolved
Prior to carrying passengers conduct security, fire and abandon ship drill's and verify required number of fire suits are on-board and satisfactory. All to the satisfaction of attending CG Marine Inspectors.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 January 2023
Resolution: Completed satisfactory u/w drills, man overboard, fire, and abandon ship - all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 January 2022Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible on board the vessel to determine the presence of alcohol in the system of each individual who was directly involved in the serious marine incident. Alcohol test strips were not on board the vessel. Provide test strips to the marine inspector. 46 CFR 4.06-15(a)
Action required: 705 - Other - as specified
Due 3 February 2022
Resolved 2 February 2022
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 24 May 2021Resolved
46 CFR 199.180
Prior to carrying passengers complete security, fire and abandon ship drill's, to include lowering, operation, and recovery of the port lifeboat.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2022
Resolution: Completed satisfactory man overboard, abandon ship and fire drills.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 May 2021Resolved
46 CFR 61.40-10
Periodic Safety Test Procedure (PSTP) document must be in a step-by-step or checkoff list format and must specify equipment status, apparatus necesary to perform the tests, safety precautions, safety controls and alarm set points, the procedure to be followed, and the expected test results. The following PSTPs from test from draft PSTP Rev C, Elliot Bay job # 13001.02, dated 2/19/21 must be updated:
1) Main Fuel Tank(s) Low Level Alarms: because the test was not conducted IAW the PSTP, this will need to be revised to articulate the acceptable method of testing performed on 21 April – lowering the set point to a level just below that which is in the tank at the time of testing. When editing the PSTP for MSC review/approval, add another step to requiring the set points be reset to 25%.
2) Accommodation Sprinkler Flow Alarms: this test was not included in the PSTP. Add this test procedure to the PSTP revision being submitted to MSC for approval.
3) Main Propulsion Back-up Power Failure: once proper testing procedures and outcome is received from Kongsberg is received, update this test procedure.
4) Fired Thermal Fluid Heater Testing: when we conducted the testing on 26 April, it was determined that the lower temperature set point of 140 degrees was not able to be achieved due to ambient temps and the lack of demand for heat. This procedure will need to be amended to account for a “summer” and “winter” mode, and will need to account for the use of gator clips when jumping the analog switch.
Action required: 705 - Other - as specified
Resolved 12 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 May 2021Resolved
46 CFR 62.35-50 (table)
The status of the main propulsion installations are required to be indicated at remote locations. When testing the Fire Relay Shutdowns, the main propulsion engines shutdown as required/designed, however, the PMC IMACS monitoring system in the Engine Control Room showed the engines were still running. Provide proof to a Coast Guard Marine Inspector that the status of the main propulsion installations is accurately indicated when the Fire Relay Shutdowns are activated.
Action required: 705 - Other - as specified
Resolved 12 June 2025
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 May 2020Resolved
Remove and replace all plastic trash cans onboard
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2020
Resolved 22 June 2020
Resolution: Vessel has replaced trash cans, All Sat
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 6 December 2019Resolved
Properly connect fire hose in fire station 15 to hydrant.
Action required: 10 - Deficiency Rectified
Resolved 6 December 2019
Resolution: Vessels crew correctly installed fire hose
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 December 2019Resolved
Provide schematic diagram of the engine room fixed fire
system at storage bottle location.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 December 2019
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 6 December 2019Resolved
Update posted Emergency Instructions for Method of donning lifejackets to include all styles of lifejackets onboard or change all lifejackets to one style to match current posted Instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 December 2019
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Certification, verification and control
Issued 6 December 2019Resolved
Provide SMC that list vessel type as per DOC
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 January 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 December 2019Resolved
Provide proof of weekly testing of fire detection system as per the SMS or update SMS.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 January 2020
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 6 December 2019Resolved
Update Lifesaving plan to include the total number
of children’s life jackets at the storage locations
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 December 2019
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 July 2019Resolved
Multiple fire doors throughout vessel have mechanical holdbacks. Remove holdbacks.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 July 2019Resolved
Unapproved drill press installed in a hazardous location (paint locker). Remove unapproved drill press.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Means of rescue
Issued 15 July 2019Resolved
Route of escape from bow thruster room, engine room and fwd machinery space not marked with escape route or exit signs. Install illuminatated exit signs.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 July 2019
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 July 2019Resolved
Multiple fire stations throughout vessel had loose or missing nut for valve wheels. Ensure all hose station valve wheels are secure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 July 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 July 2019Resolved
Single line diagram for installed fire fighting sysytem for engine room controls was not part of instructions as per cite. Provide schematic for instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 15 July 2019Resolved
First aid kits on car deck and food prep room contained expired items. Remove and replace expired items.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 July 2019Resolved
Ring buoy on 3rd deck stbd side has a clip attaching line to light. Remove clip and splice line to body oof ring bouy.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 15 July 2019Resolved
Press in fwd machinery space is not secured in place. Secure press in place.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 July 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 July 2019Resolved
Remove plastic trash can in galeey.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 July 2019Resolved
Emergency lighting shall be tested weekly IAW cite.Provide documentation that lighting is being tested.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 July 2019
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 15 July 2019Resolved
Emergency lighting for mustering and abandonment must be tested at each abandon ship drill. Lighting was not energized during abandon ship drill. Provide documentation that lighting is being tested during abandon ship drills.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 July 2019No resolution recorded
Multiple Periodic Safety Test Procedures (PTSP's) tested were incorrect, out of set point parameters or had incomplete information to complete. Systems must be tested as per PSTP's by operator and evaluated for validity. Any procedures incorrect or invalid must be amended and resubmitted to Marine Safety Center for approval. Once final approval has been received, PTSP's must be demonstrated and proved to attending Coast Guard Marine Inspector.
29 May 2019Routine · role: Involved in a Marine Casualty · activity 6704742
30 December 2019Routine · role: Involved in a Marine Casualty · activity 6884437
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.