← All vessels
GAS SUMMIT
GAS SUMMIT is a 2014 tank ship. The Coast Guard has recorded 13 inspections since 2016, most recently in May 2026, along with 5 deficiencies.
Records from 2016 to 2026. Most recent: inspection, 15 May 2026.
- Built
- 2014
- Last inspected
- 15 May 2026
- Documentation
- Not in the documentation file of 10 August 2026
- Deficiencies
- 5 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
Inspections, by type
The 13 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it47696 - Convention (Subpart B), Gross Ton
53999 - Dead Weight, Metric Ton
73722 - Displacement, Metric Ton
18625 - Convention (Subpart B), Net Ton
53999 - Dead Weight, Metric Ton
73722 - Displacement, Metric Ton
18625 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 13
15 May 2026
Administrative Inspection · PSC B · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8369685
2 May 2025
PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8123208
7 March 2024
PSC B · COC-GAS Renew
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7873563
21 October 2022
COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7579693
21 October 2022
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7581753
25 September 2021
PSC B · COC-GAS Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7316703
7 August 2020
COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7019191
15 April 2019
Administrative Inspection · Ballast Water Examination · COC-GAS Annual · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6660238
16 April 2018
MARPOL Annex I Examination · Deficiency Check · ISPS II Exam · COC-GAS Renew · Ballast Water Examination · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6391844
9 April 2018
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6387094
24 February 2017
ISPS II Exam · COC-GAS Annual · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6085597
17 February 2016
ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5884816
17 February 2016
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6089576
Deficiency record · 5
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 21 October 2022
Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the administration with a stored energy capability of at least three consecutive starts. PSCO observed emergency generator not start under battery arrangements.
2014 SOLAS (74) II-1/44.2
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 15 April 2019
Resolved
Gas detection equipment should be so designed that it may readily be tested (13.6.6). In the case of flammable products, hold spaces and interbarrier spaces should be provided with permanently installed gas detection system capable of measuring gas concentrations of 0% to 100% by volume (13.6.11).
During operational test of fixed gas detection system, crew applied 50% LEL isobutane to sensor in compressor room. LEL reading went past 90% and errored. Crew could not demonstrate satisfactory test at any location.
Documentation › Logs/Records › Oil Record Book
Issued 18 April 2018
Resolved
Each operation described in paragraph 2 of this regulation shall be fully recored without delay in the oil record book part 1, so that all entries in the book appropiate to that operation are completed.
The ORB presented to the Port State Control Officers (PSCO)had multiple discrpancies that did not account for about eleven cubic meteres of bilge water not on board according to entries on April 2, 2018 and April 7, 2018 after PSCOs observed soundings during exam. Additionally, it was determined through crew statements and watchkeeping sounding logs that the presented ORB is not a true account of the handling of oily waste and blidge water on the ship.
1710 MARPOL ANNEX I/17.4 17ac
Deck/Cargo › Ballast › Special Ballast Arrangements
Issued 18 April 2018
Resolved
A vessel equipped with ballast water tanks that operates in the waters of the United States must maintain a ballast water management plan that has been developed specifically for the vessel and that will allow those responisble for the plans implementation to understand and follow teh vessel's ballast water management strategy and comply with the requiremnts of this subpart.
Vessels ballast management plan does not include all of the necessary provisions listed in 33CFR 151 Subpart D. Vessel's ballast water management plan must include the provisions listed in 33 CFR 151.2050(g).
33 CFR 151 2050(g)
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 18 April 2018
Resolved
The machinery, boilers and other pressure vessels associated piping systems and fittings shall be of a design and construction adequate for teh service for which they are intended. During operation of OWS water was spraying from muliple pipe connections on the system.
(1730) 74SOLAS(14)II-I/26.1
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.