Documentation record
Registered dimensions (L × B × D)376.0 ft × 74.0 ft × 30.0 ft
Registered tonnagegross 6,402 / net 3,783
ITC dimensions (L × B × D)376.0 ft × 74.0 ft × 30.0 ft
ITC tonnagegross 6,402 / net 3,783
BuilderCONRAD SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2016
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portWILMINGTON, DE
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 22 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it6402 - Convention (Subpart B), Gross Ton
3783 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
23 December 2025
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8286843
10 October 2025
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8250465
31 July 2025
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8199371
16 September 2024
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8003594
22 July 2024
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7964551
13 May 2024
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7911191
21 March 2024
Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7881817
26 January 2024
Bulk Liquid Transfer Monitor
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7856027
22 March 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7655143
9 November 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7592356
14 September 2022
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7559162
14 March 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7411218
26 March 2021
COI Inspection · Internal Structural Exam · Examination of Repairs · MTSA Verification · Drydock Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7160540
28 January 2021
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7135268
11 September 2020
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7056270
3 April 2020
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6935017
6 June 2019
MTSA Verification · Periodic Inspection · MARPOL Annex VI Survey · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6705774
29 March 2019
Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6652138
20 March 2018
MTSA Verification · Annual Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination · MARPOL Annex II Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6375554
11 April 2017
Annual Inspection · MARPOL Annex VI Survey · MTSA Verification · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6121829
17 June 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5910535
31 May 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5892980
12 March 2015
Administrative Inspection · Deadweight Survey · Deficiency Check · Construction Oversight · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5155359
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 23 December 2025
Resolved
All tank vessels, the construction or conversion of which is started on or after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls. The hull and deckhouses shall be of steel or iron construction except that the pilothouse and decks over quarters may be constructed of wood. Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
Vessel reported damage 75 Ft forward of the stern above the water line after a collision with a fishing vessel. Vessel is to enact permanent repairs to the satisfaction of the Coast Guard.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 February 2026
Resolved 30 December 2025
Resolution: Received ABS report with description of repairs to the satisfaction of the CG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 October 2025
Resolved
Each barge equipped with an anchor, to comply with 33 CFR 155.230(b)(1) must be fitted with an operable anchoring system that includes a cable or chain, and a winch or windlass. All components of the system must be in general conformity with the standards of a recognized Class society.
Vessel anchor, chains, and cabling detached from vessel IVO Galveston Fairway Anchorage. Vessel shall complete repairs prior to cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 November 2025
Resolved 14 October 2025
Resolution: Witnessed anchor replacement and operation.
12 - Dangerous Goods › N/A - No Subsystem › Other (tankers)
Issued 31 July 2025
Resolved
No flammable or combustible liquids may be stowed in any accommodation, control, or service space (other than a paint locker). No more than 19 liters (five gallons) of flammable liquids may be stowed in any machinery space. The flammable liquids must be in containers of 3.8 liters (one gallon) or less. No more than 208 liters (55 gallons) of combustible liquids may be stowed in any machinery space. An aggregate of more than 7.6 liters (two gallons) of flammable or combustible liquids stowed outside of an accommodation, control, or service, space (other than a paint locker) or outside of a machinery space must be stowed in a paint locker that is marked with a warning sign indicating flammable or combustible liquid storage.
Excessive amounts of 5 gallon buckets of oil and multiple 55 gallon drums were being stored on deck.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2025
Resolution: Attended vessel and verified satisfactory completion.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 31 July 2025
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use.
Numerous issues were found with the life buoys on board. Covers were over the buoy, reflective tape was not in satisfactory condition and the home port was not labeled
Action required: 17 - Rectify deficiencies prior to departure
Due 1 September 2025
Resolved 1 August 2025
Resolution: Vessel rep submitted photos of lifebuoys properly marked with retro and uncovered.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 31 July 2025
Resolved
A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls.
The 02 forward cargo pumps did not have the capability of monitoring the pipe pressure at the pump control location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2025
Resolved 18 September 2025
Resolution: MI verified repair
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 31 July 2025
Resolved
The discharge containment required by §§ 154.530, 155.310, and 155.320 of this chapter, as applicable, is in place and periodically drained to provide the required capacity; Vessel had standing water in the containment underneath all transfer manifolds.
Vessel was using the containment area as misc storage.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2025
Resolution: Vessel rep provided photos of containment free of items and clean.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 July 2025
Resolved
The requirements of § 58.10-5 (a), (c), and (d) apply to diesel engine installations. (Engine design. All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter.
MI identified a noticeable leak off of generator in machinery room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 19 August 2025
Resolution: Attended vessel and verified satisfactory completion.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 July 2025
Resolved
The frame or support of each size III, IV, and V fire extinguisher required by table 34.50-10(a) must be welded or otherwise permanently attached to a bulkhead or deck.
The 160 b semi portable fire extinguisher bracket was not welded or otherwise permanently attached
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2025
Resolved 19 August 2025
Resolution: Attended vessel and verified satisfactory completion.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 31 July 2025
Resolved
Each cargo hose must pass a hydrostatic pressure test at ambient temperature of at least one and a half times its specified maximum working pressure but not more than two-fifths its bursting pressure.
Hoses on board were only tested to 150 PSI not the minimum 225 working pressure required for cargo hoses by
46 CFR 32.50-30. Hoses must be tested prior to use.
Action required: 705 - Other - as specified
Resolved 19 August 2025
Resolution: Attended vessel and verified satisfactory completion.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of Lifeboats
Issued 31 July 2025
No resolution recorded
No stowage position or muster and embarkation station for a survival craft on a tank vessel may be located on or above a cargo tank, slop tank, or other tank containing explosives or hazardous liquids.
Both liferafts on board were stowed on the cargo tank deck. Move to approved location on barge prior to next credit drydock.
Action required: 705 - Other - as specified
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 July 2025
Resolved
Each fire extinguisher shall be marked with a number and the location where stowed shall be marked in corresponding numbers in at least 1/2 inch figures.
Multiple fire extinguishers were found not marked appropriately.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2025
Resolved 19 August 2025
Resolution: Attended vessel and verified satisfactory completion.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 11 September 2020
Resolved
Vessel required to have flamescreens installed on diesel fuel tanks. 04 diesel fuel tanks missing 30" x 30" flamescreens. Install prescribed flame screens in accordance with 46CFR30.10-25.
Action required: 17 - Rectify deficiencies prior to departure
Due 25 September 2020
Resolved 29 September 2020
Resolution: Vessel installed flame screens on gooseneck vents for external fuel tanks.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 11 September 2020
Resolved
The vessel is required to have a mechanical means of adequately closing each drain and scupper in the enclosed deck area. The port for the mechanical plug was wasted and needs to be renewed. Renew port and ensure mechanical means of closure works.
Action required: 10 - Deficiency Rectified
Due 25 September 2020
Resolved 25 September 2020
Resolution: Vessel installed new plug.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 11 September 2020
Resolved
Vessel cargo hoses are to be marked with the OIL SERVICE / MAWP prior to use in accordance with 33CFR154.500. Vessel's cargo hoses were not marked with OIL SERVICE / MAWP. Mark cargo hoses.
Action required: 10 - Deficiency Rectified
Due 25 September 2020
Resolved 25 September 2020
Resolution: Vessel added MAWP / Oil Service requirement in accordance with 33CFR154.500
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 20 March 2018
Resolved
The 240V panel in the accommodation space has improper ground detection. The ground detection on that panel is an amp to ground meter.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 23 May 2018
Resolution: Received verification that the proper ground detection was installed on the vessel.
Operations/Management › Vessel Activity › Other
Issued 20 March 2018
Resolved
THE OFFICER IN CHARGE, MARINE INSPECTION MUST BE NOTIFIED BEFORE ALTERATIONS OR MODIFICATIONS THAT DEVIATE FROM APPROVED PLANS. LOCK OUT/TAG OUT BLOCK HEATERS UNTIL APPROVAL FOR INSTALLATION OF EQUIPMENT AND ASSOCIATED WIRING IS RECEIVED. Rectify def prior to operation of the equipment.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 23 May 2018
Resolution: Received verification that the vessel has lock out/tagged out the system.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 11 March 2016
Resolved
Lifejackets need to be marked with name of vessel in accordance with 46 CFR 199.70(b)(3).
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 15 March 2016
Resolution: Attended vessel and verified markings.
Lifesaving › Immersion Suits › Marking
Issued 11 March 2016
Resolved
Immersion suits need to be marked with name of person assigned or name of vessel in accordance with 46 CFR 199.70(c)(3).
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 15 March 2016
Resolution: Attended vessel and verified proper markings.
Documentation › Markings/Placards › Oil Discharge Placard
Issued 11 March 2016
Resolved
No Oil Discharge Placard posted.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 April 2016
Resolved 15 March 2016
Resolution: Attended vessel, verified placard was posted.