CANADA PEARL is a 2014 freight ship. The Coast Guard has recorded 13 inspections since 2017, most recently in June 2026, along with 7 deficiencies and 2 operational controls.
Records from 2017 to 2026. Most recent: inspection, 25 June 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it45556 - Dead Weight, Metric Ton 54385 - Displacement, Metric Ton 27440 - Convention (Subpart B), Gross Ton 14609 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 13
25 June 2026ISPS Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8410738
24 June 2026Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8413925
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 January 2026Resolved
The construction and the means for securing the weather tightness of cargo and other hatch ways in positions 1 and 2 shall be at least equivalent to the requirements of regulations 15 and 18 of this annex. PSCOs observed 04 hatch securing devices bent and unusable.
ICLL 1966 I/14(1)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 February 2026
Resolved 15 January 2026
Resolution: Hatch securing devices were straightened and repaired.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 13 January 2026Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed, and maintained in compliance with the structural, mechanical, and electrical requirements of a classification society... PSCOs observed a leaking hydraulic line on deck leading to the aft crane.
74 SOLAS (20) II-1/3-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 February 2026
Resolved 15 January 2026
Resolution: Hydraulic line was replaced with a new one.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 11 July 2025Resolved
THE PURPOSE OF THIS REGULATION IS TO MANTAIN AND MONITOR THE EFFECTIVINES OF THE FIRE SAFETY MEASURES THE SHIP IS PROVIDED WITH, FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENT SHALL BE MET: FIRE PROTECTION SYSTEMS AND FIRE-FIGHTHING SYSTEMS AND APPLICANCES SHALL BE MAINTAINED READY FOR USE.
PSCO OBSERVED ENGINE ROOM CO2 SYSTEM NOT READILY AVAILABLE, PILOT BOTTLE LINE DISCONNECTED AND ENGINE ROOM TYPE A CO2 CYLINDER HEADS WITH PINS LEFT IN.
74SOLAS(20)II-2/14.1.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2025
Resolution: 15JUL2025: Received class report attesting that the pins had been removed, now ready for immediate use.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 11 July 2025Resolved
MAINTENANCE, TESTING, AND INSPECTIONS SHALL BE CARRIED OUT BASED ON THE GUIDELINES DEVELOPED DUE BY THE ORGANIZATION AND IN A MANNER HAVING DUE REGARD TO ENSURING THE RELIABILITY OF FIREFIGHTING SYSTEMS AND APPLIANCES.
PSCO OBSERVED PILOT OPERATED CO2 SYSTEMS INCORRECTLY MAINTAINED IN ACCORDANCE WITH SHIPS MAINTENANCE PROCEDURES.
74SOLAS(20)II-1/14.2.2.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 July 2025
Resolution: 15JUL2025: Received class report attesting that the pilot bottle line now connected and safety pins removed, now operational and ready for immediate use.
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 23 April 2025Resolved
The Master, owner, operator, agent or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the following methods: Install and operate a ballast water management system that has been approved by the Coast Guard. Following installation, the Master, owner, operator, agent or person in charge of the vessel subject to this subpart must properly maintain the BWMS in accordance with all manufacturer specifications. The Coast Guard approved BWMS must meet the applicable ballast water discharge standard (BWDS) found in 151.2030 of this subpart at all times of discharge into the waters of the United States. Due to scale accumulation, BWMS does not meet the requirements of the USCG approval letter.
33CFR151.2025(a)(1) 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 April 2025
Resolution: Recieved, reviewed, and accepted Class Report attesting to operation of BWTS.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 13 February 2019Resolved
07103 - DIVISIONS - DECKS, BULKHEADS, AND PENETRATIONS - NO DIRECT ACCESS SHALL BE PERMITTED BETWEEN THE MACHINERY SPACE AND THE SPACE CONTAINING THE EMERGENCY FIRE PUMP. WHEN IMPRACTABLE, THE ADMIN. MAY ACCEPT ARRANGEMENT WHERE ACCESS IS BY MEANS OF AIRLOCK WITH OTHER DOOR BEING AT LEAST STEEL, REASONABLY GASTIGHT, AND SELF CLOSING. DOOR TO STEERING COMPARTMENT CONTAINING EMERGENCY FIRE PUMP WAS MODIFIED TO FIT ANTI-PIRACRY DOOR RENDERING IT UNABLE TO MEET ABOVE REQUIREMENTS. GASKETS, DOORLOCK, AND HANDLE WERE REMOVED AND WAS NOT SELF CLOSING OR GAS TIGHT.
74SOLAS(14) II-2/10.2.2.3.2.2 - 40AC
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2019
Resolution: The self-closing device and lock for the steering gear fire door (2nd fire door from ER to SGR) was re-installed and tested satisfactorily.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 February 2019Resolved
13101 - PROPULSION MAINE ENGINE - THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS AND ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. INSTALLED INSULATION ON TURBO EXHAUST FAILING.
74SOLAS(14)II-1/26.1 - 40AC
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2019
Resolution: The main engine turbocharger exshaust inlet piping insulation has been re-installed and examined satisfacorily.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.