MAURY USCG vessel records
← All vessels

YOUNG HARMONY

YOUNG HARMONY is a 2014 freight ship. The Coast Guard has recorded 5 inspections since 2016, most recently in December 2024, along with 7 deficiencies.

Records from 2016 to 2024. Most recent: inspection, 13 December 2024.

Built
2014
Last inspected
13 December 2024
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 13 December 2024
Operational controls None recorded without a removal date
Years with a record 4 calendar years (2016–2024)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9686546
1320620
Flag
SOUTH KOREA
Maury page id
psix-1320620

Documentation record

Tonnage as PSIX records it63567 - Dead Weight, Metric Ton
75031 - Displacement, Metric Ton
36259 - Simplified, Gross Ton
36259 - Convention (Subpart B), Gross Ton
20973 - Convention (Subpart B), Net Ton
20973 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 5

13 December 2024 PSC B
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8044305
13 November 2022 PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7593494
27 April 2021 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7183928
3 February 2021 PSC B
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7133086
17 November 2016 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6041214

Deficiency record · 7

07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 February 2021 Resolved
Fire fighting systems and appliances shall be kept readily avialable for immediate use. PSCO discovered water mist system was set "manual" not "automatic" as required.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 February 2021
Resolved 3 February 2021
Resolution: Water Mist was put into Automatic mode.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Documentation-ISM
Issued 3 February 2021 Resolved
The ship shall comply with the requirements of the international sfety managment code. the company shall establish procedures to ensure that the ship is maintaned in conformity with the relevant rules and regulations. PSCO discoved lack of SMS procedures for testing and operation of water mist system. Require SMS Audit to be completed within 3 months.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 3 February 2021
Resolved 27 April 2021
Resolution: Received Class report attesting to familiarization and updated procedures considering SMS and the water mist system. ISM Audit completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 February 2021 Resolved
The Machinery, boilers and pressure vessels and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO discovered 03 of 06 main engine cylinders steadily leaking jacket water. 01 cylinder is leaking more significantly than the rest at a rate of 25-30 drops every 10 seconds.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 3 February 2021
Resolved 27 April 2021
Resolution: Class surveyor confirmed once main engine heated to above 68 celcius no leakage was detected after tests.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 February 2021 Resolved
The machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. The design shall have regard to the working conditions to which it will be subjected and enviornmental conditions on board. PSCO discovered the hydraulic system for the hatch covers had leaked oil into the BOSUN STORES. The oil covered the I-beams above the system, the hoses, and outer casing, as well as the containment area.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 3 February 2021
Resolved 27 April 2021
Resolution: Crew cleaned and removed oil in bosun store and retightened the connections. Class surveyor confirmed no leakage was found after testing.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 3 February 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea. Sludge pump associated with ships incinerator is broken and ship cannot currently burn sludge. Replacement part has been ordered and ship is to repair part in New Orleans.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 3 February 2021
Resolved 27 April 2021
Resolution: Sludge pump was replaced. Operation and safety device test was completed with satisfaction by Class Surveyor.
Lifesaving › Rescue Boat › Hull (combination rigid/inflated)
Issued 17 November 2016 Resolved
0618-Stowage of rescue boat-Rescue boast shall be stowed in a state of continuous readiness for launching in not more that 5 minutes, and if the inflated type in a fully inflated condition at all times. PSCO's noted that the inflatable rescue boat was not maintained at full air pressure. Crew added air and there didn't appear to be any visible leakage. SOLAS(14) III/14 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 November 2016
Resolved 18 November 2016
Resolution: Ships crew corrected on the spot. Added air with no obvious sign of leakage.
Lifesaving › Rescue Boat › Carriage Requirement
Issued 17 November 2016 Resolved
0635-launching arrangtments for rescue boat-Rescue boast shall be stowed in a state of continuous readiness for launching in not more that 5 minutes, alaunching appoicance shall not depend on any means other than gravity or stored mechanical power. PSCO noted that the davit was stored 180 degrees away from rescue boat. Crew adjusted the tie down height. SOLAS(14) III/14 LSA VI/6.1.1.3 10c
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 November 2016
Resolved 18 November 2016
Resolution: Crew adjusted the tie down height to align closer with the lifting point to the rescue boat to met standars while PSCO's were still on board the vessel.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.