GOOD FORTUNE

GOOD FORTUNE is a 2015 passenger vessel (inspected). The Coast Guard has recorded 25 inspections since 2016, most recently in June 2025, along with 29 deficiencies and 2 casualty investigations between 2022 and 2023.

Records from 2016 to 2025. Most recent: inspection, 16 June 2025.

Built
2015
Last inspected
16 June 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

WDQ4736
1321247
Flag
UNITED STATES
Maury page id
psix-1321247

Inspections, by type

…with no type recorded2
Years with a record 10 calendar years (2016–2025)
The 25 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Documentation record

Registered dimensions (L × B × D)64.8 ft × 19.0 ft × 7.0 ft
Registered tonnagegross 57 / net 46
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNAVIS CRUISES LLC · PENSACOLA, FL, UNITED STATES · built 2015
Hull materialFRP (Fiberglass)
PropulsionDiesel Direct
Hull shapeShip
Hull configurationMonohull
Hailing portMACKINAC ISLAND, MI
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 20 June 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it57 - Simplified, Gross Ton
46 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspection history · 25

16 June 2025 COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8126545
9 September 2024 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7999077
29 August 2024 Annual Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8005163
11 September 2023 Annual Inspection · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7796121
7 August 2023 Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7762921
6 August 2023 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7762118
9 June 2023 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7712749
7 September 2022 Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7553319
1 September 2022 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7549019
25 July 2022 Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7527989
1 June 2022 Hull Examination
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7476347
28 July 2021 Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7289304
11 June 2021 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7222494
26 June 2020 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6987524
11 June 2020 COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6973602
28 May 2020 In-Service Inspection · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6962308
12 June 2019 Annual Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6714520
1 May 2019 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6684289
7 August 2018 Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6504767
17 July 2018 Annual Inspection · DAPI Audit
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6484756
27 March 2018 Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6379254
12 April 2017 Hull Examination · Annual Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6122649
10 March 2017 Construction Oversight · Plan Review "T" Boat
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6261926
27 October 2016 In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6028348
14 September 2016 Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6000525

Deficiency record · 29

02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 29 August 2024 Resolved
Stbd rubrail and stbd quarter damaged, require permanent repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2024
Resolved 16 July 2025
09 - Working and Living Conditions › 091 - Living Conditions › Clear head
Issued 29 August 2024 Resolved
Stbd side head inoperative, make permanent repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2024
Resolved 16 July 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 August 2024 Resolved
All engineroom bus bars and electrical connections require safety caps caps/covers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2024
Resolved 17 September 2024
Resolution: corrected.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 7 August 2023 Resolved
Found leaking hydraulic line at steering actuator ram. Repair/replace as necessary & demonstrate proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 August 2023
Resolved 8 August 2023
Resolution: Leaking hydraulic line replaced, ops check completed.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 7 August 2023 Resolved
Sighted excessive amount of hydraulic fluid in the laz bilge. Laz bilge, electric bilge pump & fixed bilge piping/pick-up must be cleaned.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 August 2023
Resolved 8 August 2023
Resolution: completed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 August 2023 Resolved
Make vessel available for post grounding inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 August 2023
Resolved 7 August 2023
Resolution: Damage survey completed, no damage sighted.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 25 July 2022 Resolved
Vessel is 8 flares short of required #.
Action required: 10 - Deficiency Rectified
Due 25 July 2022
Resolved 25 July 2022
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 25 July 2022 Resolved
Both rudder bushings leaking. Crew must monitor & report any degradation to our office. Rudder bushings must be removed/replaced or re-packed after this operating season.
Action required: 705 - Other - as specified
Due 15 October 2022
Resolved 9 June 2023
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 25 July 2022 Resolved
I questioned the tension of the stays which seems loose to me. No one can provide an educated answer. I required the owner to locate & provide to our office a copy of the mast and rigging new construction/plan approval data and any inspection records they have. I will require a mast & rigging inspection and stay adjustment as needed.
Action required: 705 - Other - as specified
Due 25 September 2022
Resolved 9 June 2023
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 28 July 2021 Resolved
Aft crew only deck railing damaged and loose, requires repairs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 9 August 2021
Resolution: repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 28 July 2021 Resolved
IBAs found to be improperly mounted, trained crew on proper mounting. corrected on the spot.
Action required: 60 - Rectify deficiencies prior to movement
Due 28 July 2021
Resolved 28 July 2021
Resolution: corrected.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 28 July 2021 Resolved
Unable to determine from tags or servicing report if fire detection systam has been servied within the last 12 months. Provide sevicing report attesting to proper servicing.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 29 July 2021
Resolution: corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 July 2021 Resolved
Maindeck RLB vsl name faded, must be re-marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 28 July 2021
Resolution: corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 28 July 2021 Resolved
Excessive amounts of chemicals/oil products are being stored in the engine room, must be removed.
Action required: 60 - Rectify deficiencies prior to movement
Due 28 July 2021
Resolved 28 July 2021
Resolution: corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 July 2021 Resolved
Dead end electrical wiring sighted outboard of port MDE. Reconnect to appropriate device or remove.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 28 July 2021
Resolution: corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 July 2021 Resolved
Bilge manifold is required to have simple instructions posted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 August 2021
Resolved 11 August 2021
Resolution: corrected.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 12 June 2019 Resolved
The visual indicator at the operating station for the automatic bilge pump in the forepeak is inoperable. Repair visual indication for automatic bilge pump in forepeak, to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2019
Resolved 28 June 2019
Resolution: The automatic function of the bilge pump has been disabled and the bilge pump indicator is marked "manual only".
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 June 2019 Resolved
The space forward of the collision bulkhead need not be fitted with a bilge suction line when the arrangement of the vessel is such that ordinary leakage may be removed from this compartment by the use of a hand portable bilge pump or other equipment. The automatic bilge pump in the forepeak does not operate in auto mode. Repair bilge pump to operate as designed to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2019
Resolved 28 June 2019
Resolution: The automatic function of the bilge pump has been disabled and the bilge pump indicator is marked "manual only".
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 June 2019 Resolved
The planks of the wooden platform that extends from the stern of the ship are rotten. Repair platform and make safe for carrying weight of deckhands.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 June 2019
Resolved 28 June 2019
Resolution: Planks have been attached on top of the rotten wood, across the beams. Structurally sufficient for the crew to stand on.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 17 July 2018 Resolved
Replace expired EPIRB hydrostatic release. Vessel limited to operating no more than 3 miles from coastline.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2018
Resolved 7 August 2018
Resolution: Received photo/attestation via e-mail proving replacement of EPIRB hydrostatic release.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 17 July 2018 Resolved
Make operating station stbd MDE digital display panel operational.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2018
Resolved 7 August 2018
Resolution: Received photos/attestation via e-mail proving gauge replacement & proper operation.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 17 July 2018 Resolved
Update light list, coast pilot and navigational chart.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2018
Resolved 7 August 2018
Resolution: Received photo/attestation via e-mail proving replacement of outdated nav pubs.
02 - Structural Conditions › N/A - No Subsystem › Marking of IMO number
Issued 17 July 2018 Resolved
Correct hailing port on certificate of documentation, mark vessel stern to match COD.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 May 2019
Resolved 1 May 2019
Resolution: Sighted vessel stern marked appropriately with new hailing port - Munising, MI.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 17 May 2017 Resolved
Properly mark RLB with vessel name and retro reflective tape.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 May 2017
Resolved 1 June 2017
Resolution: Marked.
Documentation › Certificates/Documents › Stability Letter
Issued 17 May 2017 Resolved
Post stability ltr and emergency procedures at operating station.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 May 2017
Resolved 1 June 2017
Resolution: Posted.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 17 May 2017 Resolved
Provide FCC Cert and Great Lakes Agreement Insp record.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 June 2017
Resolved 19 June 2017
Resolution: completed.
Lifesaving › Buoyant Apparatus › Not on Board
Issued 17 May 2017 Resolved
Vessel is limited to passenger operations no more than 1 NM from land until IBA installation and approval of the same is completed.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 September 2017
Resolved 13 July 2017
Resolution: Satisfactorily installed.
Operations/Management › Drills/Instruction › Not Conducted
Issued 27 October 2016 Resolved
Provide crew and conduct emergency drills.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 June 2017
Resolved 17 May 2017
Resolution: Crew demonstrated oustanding knowledge regarding firefighting and performed at a high level during underway MOB and fire drills.
Operations/Management › Passenger Operations › Safety Orientation
Issued 14 September 2016 Resolved
Vessel to complete new to zone inspection, and change of owner/operator, along with routes and conditions upon arrival to new destination, area of operation.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 October 2016
Resolution: Completed.

Casualty record · 2

7 September 2022Routine · role: Involved in a Marine Casualty · activity 7553319
6 August 2023Routine · role: Involved in a Marine Casualty · activity 7762118
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record