Records from 2015 to 2025. Most recent: inspection, 21 October 2025.
Inspection history · 24
21 October 2025
COC-TVE Annual · PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8256004
24 October 2024
PSC B · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8024081
22 July 2024
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7964437
22 July 2024
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8029631
24 October 2023
COC-TVE Annual · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7813419
10 August 2023
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7768424
19 June 2023
PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7718227
14 December 2022
PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7608997
1 December 2022
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7602965
31 October 2022
Ballast Water Examination · COC-TVE Renew · PSC B
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7583547
19 December 2021
COC-CVE Annual
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7370349
9 February 2021
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7141248
12 November 2020
PSC B · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7093952
7 December 2019
COC-TVE Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6862361
10 January 2019
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6608796
22 November 2018
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6582919
22 November 2017
ISPS II Exam · Ballast Water Examination · COC-TVE Annual
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6310126
21 June 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6183736
21 November 2016
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6041469
11 July 2016
ISPS III Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5936653
8 December 2015
COC-TVE Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5772980
28 October 2015
Random ISPS/MTSA-No PSC
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5752010
14 October 2015
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5743666
14 October 2015
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5744637
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 31 October 2022
Resolved
74 SOLAS (14) IX/3.1, ISM CODE CLAUSE 1.4.2 Every company should develop implement and maintain an SMS which includes instructions and procedures to ensure protection of the environment. Ship did not follow Valve seals Procedure VOP-04-08 which requires bilge system... after test or inspection, [to be] fitted with a numbered, easily breakable seal in compliance with the controlled valve procedure. Vessel found with Engine Room main emergency bilge suction (valve WSO12F) and both engine room general service #1 and #2 pump valves found with seals connected to zip ties creating an ineffective valve seal arrangement capable of being bypassed without breaking the numbered seals. SMS audit required to lift detention deficiency.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 25 November 2022
Resolved 1 November 2022
Resolution: ISM audit received addressing deficiency to USCG satisfaction.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 31 October 2022
Resolved
74 SOLAS (14) IX/3.1, ISM CODE CLAUSE 1.4.2 Every company should develop implement and maintain an SMS which includes instructions and procedures to ensure protection of the environment. Ship did not properly follow Controlled valve procedure 4.0 which requires "secure valves identified to be kept closed using yellow prolock device." Yellow prolock device on overboard valves for the following systems did not lock properly as they require human engagement to tighten and be secured. Following overboard valves were able to be opened by hand without key required by SMS: 1. shipside soot drain eductor overboard. 2. Sewage overboard valve. 3. Grey water overboard valve. 4. OWS overboard valve. SMS audit required to lift detention deficiency.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 25 November 2022
Resolved 1 November 2022
Resolution: ISM audit received addressing deficiency to USCG satisfaction.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 15 October 2015
Resolved
Means shall be provided to control leaks of flammable liquids. Crude oil was leaked into the pump room. SOLAS Consolidated(09) II-2/4.1.1, 17 a.c.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2015
Resolved 15 October 2015
Resolution: Crude oil was removed from the pump room.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 15 October 2015
Resolved
All Connections in the transfer system are to be leak free. Crude oil leaked into the pump room. 33 CFR 156.120(p), 17 a.c.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2015
Resolved 15 October 2015
Resolution: leak was stopped.