Records from 2016 to 2026. Most recent: inspection, 25 February 2026.
Documentation record
Registered dimensions (L × B × D)35.0 ft × 13.0 ft × 3.8 ft
Registered tonnagegross 8 / net 8
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderARMSTRONG MARINE INC · PORT ANGELES, WA, UNITED STATES · built 2014
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationTwin Hull
Hailing portHANALEI BAY, HI
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 6 June 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it8 - Simplified, Gross Ton
8 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
25 February 2026
Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Lihue · USCG Oceania District (CGD-O) · Activity 8316610
27 February 2025
COI Inspection · DAPI Audit · Hull Examination
Physical examination · OP location-Sector Honolulu Prevention Department- Lihue · USCG Oceania District (CGD-O) · Activity 8085810
27 February 2024
Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7871125
15 February 2023
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7637982
12 April 2022
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7429657
10 February 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7396260
8 April 2021
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7171267
5 March 2021
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7151088
4 December 2020
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7106483
6 March 2020
Administrative Inspection · Internal Structural Exam · Drydock Extension · Deficiency Check · COI Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6922090
14 May 2019
Administrative Inspection · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6685192
31 January 2019
Drydock Exam · DAPI Audit · Administrative Inspection · Internal Structural Exam · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6618234
1 June 2018
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6492551
21 February 2018
Internal Structural Exam · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6358372
1 February 2017
Annual Inspection · Hull Examination · Internal Structural Exam · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6081176
23 February 2016
DAPI Audit · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5821379
10 - Safety of Navigation › N/A - No Subsystem › Navigation bridge visibility
Issued 27 February 2025
Resolved
Each window attached to the deck house must be capable of withstanding the maximum load from wave and wind conditions. MI found the starboard window at the operation station cracked. Replace window with capable in kind window and prove its water tight.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 7 March 2025
Resolution: MI found satisfactory capable glass installed at the operation station.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 27 February 2025
Resolved
Each vessel must have permanent draft marks at each end of the vessel or have permanent loading marks placed on the side of the vessel forward and aft to indicate the maximum allowable trim and amidships to indicate the maximum allowable draft. MI found the vessel missing haul marking required. Provide permanent hull marking and prove they are satisfactory installed.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2025
Resolved 7 March 2025
Resolution: MI satisfactory inspected permanent draft markings on either side of the vessel.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 10 March 2021
Resolved
Drills are required to be conducted in the presence of a CG Marine Inspector at each inspection. The vessel is in an inactive status IAW CVC-WI-08(1) and drills have been deferred until the vessel resumes operations. Drill must be conducted in the presence of CG MI prior to the carriage of passengers.
Action required: 705 - Other - as specified
Resolved 8 April 2021
Resolution: Completed drills and underway trials.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 10 March 2021
Resolved
The EPIRBs battery must be replaced before the date required by the FCC. The EPRIBs battery is expired. The vessel must remain 3 miles from shore until a current battery for the EPIRB is provided.
Action required: 705 - Other - as specified
Resolved 8 April 2021
Resolution: Owner provided a new EPRIB, verified registration and proper installation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 March 2021
Resolved
Each ring buoy waterlight must be attached by a lanyard 3-6' in length. The provided lanyard is not the correct length. Provide a properly sized water light lanyard, properly secured to the ring buoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 April 2021
Resolved 8 April 2021
Resolution: Ring buoy equipped with a properly sized water light lanyard.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 6 March 2020
Resolved
Vessels 26 feet or longer are required bilge high water alarms. Alarms must indicate audibly and visually at the operating station. The provided visual indicator for the STBD aft high water alarm was in operable. Provide proper alarms.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 9 March 2020
Resolved 9 March 2020
Resolution: A replacement light was provided.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 6 March 2020
Resolved
47 CFR 80.903 Vessels with radio station installations are required to be inspected by the FCC and have a Communications Act Safety Radiotelephony Certificate. The vessel Safety Radio Telephoney Certificate was expired. Provide a valid certificate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2020
Resolved 16 March 2020
Resolution: FCC Safety Radiotelephony certificate issued
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 February 2019
Resolved
At least one ring buoy needs to be fitted with a floating waterlight, the provided light was not operational. Provide an functioning floating water light, prior to operating at night.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 February 2019
Resolved 13 February 2019
Resolution: A new battery was installed and the light was verified to function properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 February 2019
Resolved
Ring buoys are required to marked with vessels name in legible block letters. Vessels name was not legibile. Relabel both ring buoys.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2019
Resolved 13 February 2019
Resolution: Ring buoys were properly labeled prior to inpsection concluding.