MAURY USCG vessel records Sign in
← All vessels

PROSPECT PARK

PROSPECT PARK is a 2016 towing vessel. The Coast Guard has recorded 31 inspections since 2015, most recently in March 2026, along with 24 deficiencies and 3 operational controls.

Records from 2015 to 2026. Most recent: inspection, 17 March 2026.

Built
2016
Last inspected
17 March 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9776597 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDR2867
1323488
Flag
UNITED STATES
338590000, 368377820
Maury page id
psix-1323488

Inspections, by type

…with no type recorded3
Years with a record 11 calendar years (2015–2026)
The 31 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Documentation record

Registered dimensions (L × B × D)115.2 ft × 39.8 ft × 18.2 ft
Registered tonnagegross 420 / net 285
ITC dimensions (L × B × D)115.2 ft × 39.8 ft × 18.2 ft
ITC tonnagegross 701 / net 210
BuilderCONRAD SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2016
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 22 May 2026 · expires 31 May 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it701 - Convention (Subpart B), Gross Ton
420 - Regulatory (Subpart C or D), Gross Ton
210 - Convention (Subpart B), Net Ton
285 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDR2867MMSI 338590000 · active · compulsorily equipped · granted 2 July 2026, expires 2 July 2036
WDP7012MMSI 368377820 · active · compulsorily equipped · granted 11 July 2024, expires 11 July 2034
WDK7433MMSI 338304000 · cancelled · compulsorily equipped · granted 29 March 2019, cancelled 16 July 2024 · licensed under a name not among this hull’s recorded names (not shown)
WDI8681MMSI 367741080 · cancelled · compulsorily equipped · granted 16 June 2016, cancelled 21 February 2020 · licensed under a name not among this hull’s recorded names (not shown)
WDI8122MMSI 367735490 · cancelled · voluntarily equipped · granted 20 May 2016, cancelled 13 June 2016 · licensed under a name not among this hull’s recorded names (not shown)
WDH9400MMSI 338304000 · cancelled · compulsorily equipped · granted 17 April 2015, cancelled 17 May 2016 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 31

17 March 2026 Administrative Inspection · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8327497
10 January 2026 Administrative Inspection
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8294191
31 July 2025 Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8199384
17 January 2025 Appeal
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8067524
14 January 2025 MTSA/ISPS Verification · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8063236
14 January 2025 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8063381
9 August 2024 VRP Review · Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7977960
26 July 2024 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7967552
11 July 2024 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7956217
13 May 2024 Periodic Inspection · Deficiency Check · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7911189
18 March 2024 Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7880832
8 February 2024 Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7862794
24 December 2023 Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7842283
6 September 2023 Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7778342
22 March 2023 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7655163
29 June 2022 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7491335
14 March 2022 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7411797
28 June 2021 Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7248032
16 June 2021 Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7226867
3 June 2021 Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7214422
26 March 2021 MTSA/ISPS Verification · Examination of Repairs · COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7160531
17 June 2020 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6978949
17 June 2019 MTSA/ISPS Verification · Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6716357
29 March 2019 Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6652147
30 August 2018 Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6528196
3 May 2018 Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6403924
6 April 2018 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6386713
20 April 2017 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6128635
18 April 2017 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6126979
9 January 2017 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6067755
10 March 2015 Inclining Experiment · COI Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5741194

Deficiency record · 24

99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 May 2024 Resolved
The ships IMO number shall be marked permanetly on the stern or other exterior areas of the hull. IMO number not marked on the hull. Prior to an intenational voyage. 74 SOLAS XI-1 reg 3.4
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2024
Resolved 10 June 2024
Resolution: IMO number marked on the front of the superstructure.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 24 December 2023 Resolved
General emergency alarm signal must: be audible in spaces identified in paragraph (a) of this section with all normally closed doors and accesses closed. Vessel general alarm does not sound in interior spaces. Communications to be maintained via on board equipment and hand held VHF radios. Vessel is authorized a one-time transit to Port Fourchon, Louisiana, in order to complete permanent repairs to general alarm system within 7 days. 46 CFR 113.25-9(b)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 January 2024
Resolved 19 January 2024
Resolution: Received ABS report attesting to repair and successful testing of GA.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 December 2023 Resolved
Each generator must meet the applicable requirements for construction and testing in section 4-8-3 of the ABS Marine Vessel rules. Vessel experienced electrical surge event on Number 3 ship service diesel generator resulting in catastrophic failure of engine. Vessel meets minimum requirements of Subchapter J with two other operable ship service generators along with a functioning emergency generator. Vessel shall perform tag-out procedures on the number 3 generator and complete repairs within 60 days. 46 CFR 111.12-5
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 27 February 2024
Resolved 1 March 2024
Resolution: Class report provided attesting to repair/testing of generator
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 March 2023 Resolved
The lifebuoy intended to be used for quick release must have a mass of not less than 4 kg. The ring buoy's installed on the wing of each side of the bridge were actually "deck buoy's" (mass of 2.5 kg) not meeting the requirments for weight. Replace those with the "bridge buoy" type of 4 kg mass.
Action required: 10 - Deficiency Rectified
Resolved 23 March 2023
Resolution: Crew replaced with the proper bridge buoy's.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 June 2021 Resolved
STBD cutlass bearing requires replacement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 June 2021
Resolved 24 August 2021
Resolution: Received ABS report attesting to replacement of cutlass bearings. See documents tab.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 June 2021 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules, except as otherwise provided by this subchapter. While conducting sea trials, the electo-pneumatic hydraulic system for controlling the shaft break on port shaft failed, resulting in the shaft break locking in place. Following replacement of the solenoid, Coast Guard witnessed the shaft break locking in place again. Vessel is to troubleshoot issue and make repairs as needed. After successful restoration of the control system, vessel is to contact MSU Port Arthur to clear the deficiency. 46 CFR 58.05-1(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 June 2021
Resolution: Manufacturer's tech rep replaced shuttle valve/actuator. Witnessed satisfactory operation of the reduction gears and propulsion system during sea trials.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 1 June 2021 Resolved
Each inflated rescue boat must be repaired and maintained in accordance with the manufacturer's instructions. All repairs to inflated chambers must be made at a servicing facility approved by the Commandant, except for emergency repairs carried out on board the vessel. Vessel crew unable to prove that the recent permanent repair made to the inflatable rescue boat was performed by a company approved by the CG to do so. `
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2021
Resolved 28 June 2021
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 17 June 2020 Resolved
Before the vessel leaves port and at all time during the voyage, each lifesaving appliance must be in working order and ready for immediate use. One (01) liferaft was inproperly rigged for release. Owner corrected on the spot.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 17 June 2020
Resolved 17 June 2020
11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 17 June 2020 Resolved
Rescue boat not marked with name of vessel, hailing port, or POB.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2020
Resolved 17 June 2020
Resolution: Cleared to satisfaction of MI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 June 2019 Resolved
The navigating bridge lifebuoys are attached to the vessel's superstructure and pose a significant safety risk if deployed manually. Bridge deck lifebuoys must be stowed where they can quickly be released from the bridge and fall directly into the water without striking any part of the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 17 June 2019 Resolved
Engine room door and engine room emergency escape hatch gaskets are worn and rotted. Replace gaskets and adjust each to make watertight.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 June 2019 Resolved
The engine room bilge suction pipe exceeds a height to properly pump and drain the compartment and is not fitted with a suitable strainer. Extend the engine room bilge suction pipe and install bilge strainer.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 1 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 17 June 2019 Resolved
The rescue boat fails to start or continue to run after starting. Prove proper operation of the rescue boat.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 17 June 2019 Resolved
The retro-reflective tape on the rescue boat is faded and torn. Provide and attach CG/SOLAS approved reflective tape on the rescue boat.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 1 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 17 June 2019 Resolved
The rocket parachute flares expire 30 Jun 2019. Replace red parachute flares.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 1 July 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 June 2019 Resolved
There are currently no Lockout/Tagout procedures onboard. Provide and implement a Lockout/Tagout log and procedures in accordance with 29 CFR 1910.335
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2019
Resolved 1 July 2019
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 17 June 2019 Resolved
Periodic Safety Test Procedures (PSTP's) were not conducted and recorded in accordance with the CG approved PSTP's. Conduct and provide proof of completion.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2019
Resolved 1 July 2019
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 17 June 2019 Resolved
Fire and man overboard drills were conducted and indicated that the crew was unfamiliar with the equipment and procedures. Conduct fire and man overboard drills.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2019
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 20 April 2017 Resolved
Port Shaft seal overheated and made noise while underway transiting from New york to Delaware Bay.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2017
Resolution: Vessel completed repairs and conducted satisfactory sea and dock trials in the presence of the USCG and ABS.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 18 April 2017 Resolved
1. Properly label appropriate load of each circuit on vessels panelboards.
Condition: Invalid
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 27 April 2017
Engineering › Pressure Vessel › Marking and Stamping
Issued 18 April 2017 Resolved
2. Provide manufacturer plans, data reports for #1, 2, and 3 pressure vessels.
Condition: Invalid
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 27 April 2017
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 18 April 2017 Resolved
3. Remove combustible material/cabinet in stairway.
Condition: Invalid
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 19 April 2017
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 29 March 2016 Resolved
Provide approved Periodic Safety Test Procedures.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 July 2016
Resolved 14 September 2018
Resolution: O/O submitted approved PSTP's that were completed at construction, which were approved by MSC/ENG.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 29 March 2016 Resolved
Provide corrected Fire Control Plan.
Action required: 705 - Other - as specified
Resolved 14 June 2016
Resolution: Fire Control plan corrected and approved.

Ownership record