Records from 2017 to 2026. Most recent: inspection, 12 May 2026.
Inspection history · 7
12 May 2026
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8371505
7 May 2026
PSC B · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8367140
6 November 2023
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7816404
24 May 2022
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7457991
6 June 2021
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7200286
7 March 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6361729
24 February 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6099501
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 7 May 2026
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed hydrostatic release unit marked with an expiration date of June 2025.
SOLAS (20) CHP III REG 20.2
17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 May 2026
Resolution: Hydrostatic release unit replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 7 May 2026
Resolved
For this purpose, the following functional requirements shall be met: .2 means shall be provided to control leaks of flammable liquids. PSCO observed pump number 1 solenoid leaking hydraulic oil 1 drop every 5 seconds.
SOLAS (09)CHP II-2 REG 4.1.1
15C
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 7 May 2026
Resolution: Oil ring was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Adequate lighting - mooring arrangements
Issued 7 May 2026
Resolved
Ships shall be provided with arrangements, equipment and fittings of sufficient safe working load to enable the safe conduct of all towing and mooring operations associated with the normal operation of the ship. PSCO observed frayed lines on lines 1 and 2, port bow quarter spare line, and stern starboard quarter spare line.
SOLAS (20) CHP II-1 REG 3-8
50AC
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2026
Resolved 11 May 2026
Resolution: Received a class report from ClassNK satisfying the requirement.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 6 June 2021
Resolved
MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. PSCO OBSERVED OIL SOAKED LAGGIN GON NUMEROUS FUEL LINES FOR THE MAIN ENGINE.
74 SOLAS (09), II-2/4.1.1, 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2021
Resolution: Received, reviewed and accepted NKK class report attesting to new lagging and no leaking fuel pipes in the vicinity of the main engine.
09 - Working and Living Conditions › 091 - Living Conditions › Provisions quantity
Issued 6 June 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2021
Resolution: Received, reviewed and accepted Panamanian Flag State letter and delivery receipt of provisions to the vessel.