Records from 2016 to 2025. Most recent: inspection, 13 May 2025.
Inspection history · 23
13 May 2025
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8070606
3 October 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7842889
31 May 2024
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7933023
21 April 2024
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7889495
11 January 2024
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7848134
16 December 2023
Deficiency Check · Damage Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7839769
16 December 2023
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7840382
3 October 2023
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7701917
3 February 2023
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7659442
26 September 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7536828
24 March 2022
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7418250
1 March 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7403519
15 July 2021
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7291754
7 October 2020
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7074168
29 July 2020
Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7019669
29 July 2020
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7117979
19 February 2020
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6911547
20 August 2019
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6789705
18 September 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6408445
27 March 2018
Hull Examination · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6372583
23 May 2017
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6126783
21 July 2016
Initial Certification
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5937385
14 June 2016
Deadweight Survey
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5906590
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 3 October 2024
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation rules, except that a vessel of more than 65 feet in length must also have navigation lights that meet UL 1104. Vessel's stern light was inoperable. Vessel is restricted to daylight operations only.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 4 October 2024
Resolution: Stern light watching properly.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 October 2024
Resolved
Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel... Batteries must be mounted in trays lined with, or constructed of, a material that is resistant to damage by the electrolyte.
Two (2) batteries in the pilot house were found unsecured in cabinet behind operating station.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 16 October 2024
Resolution: Batteries in pilot house properly secured.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts.
All electrical equipment and circuits must be clearly marked and identified.
Breaker panel on navigation bridge has unprotected and unidentified breaker openings in the panel. 46 CFR 183.200(c) and 46 CFR 183.220(d)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 4 October 2024
Resolution: Breakers marked and protected.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 October 2024
Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of non-combustible materials with no openings in the sides or bottom. Waste receptacles throughout the vessel are not constructed of non-combustible material.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 11 October 2024
Resolution: Plastic Waste Receptacles replaced with metal ones.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 October 2024
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Child sized life jackets on upper deck were stowed with adult life jackets.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 16 October 2024
Resolution: Children's lifejackets separated from Adult's.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 3 October 2024
Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. MI observed penetrations in port generator room watertight bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2024
Resolved 4 October 2024
Resolution: Bulkhead penetration repaired.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 16 December 2023
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. The OCMI may also decrease the drydock examination intervals to monitor the vessel's structural condition. Captain of vessel reported an unintended grounding in Newport Harbor while operating with passengers on December 15th, 2023 on or about 2100. Make vessel available for inspection for attending Marine Inspector to conduct an internal structural exam.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 December 2023
Resolution: MI attended vessel and conducted ISE. Divers were not ready. MI issued 835 for LBS operation until external hull could be witnessed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 December 2023
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. The OCMI may also decrease the drydock examination intervals to monitor the vessel's structural condition. Captain of vessel reported an unintended grounding in Newport Harbor while operating with passengers on December 15th, 2023 on or about 2100. Provide underwater video of both Port and STBD hulls to the satisfaction of attending Marine Inspector to verify vessels exterior hull did not sustain any damage following unintended grounding. Vessel is restricted to Lakes, Bays, and Sounds, specifically Newport Harbor.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 December 2023
Resolution: Attended vessel, crawled noted voids, witnessed diver video of undersides. Cleared for operation.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 October 2023
Resolved
Waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. All waste receptacles onboard are constructed from plastic. Provide waste receptacle constructed of noncombustible materials (metal, steel).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2023
Resolved 15 October 2023
Resolution: Replaced with steel receptacles.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 3 October 2023
Resolved
A passenger accommodation space must not contain any other item that could injure a passenger, unless such an item is adequately shielded or isolated. Secure CO2 tank to bulkhead to prevent shifting or damage to valve top.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2023
Resolved 15 October 2023
Resolution: CO2 tank secured to table leg.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 October 2023
Resolved
A portable or temporary electric cord or cable must be constructed and used in compliance with the requirements of §111.60-13 in subchapter J of this chapter for a flexible electric cord or cable. No flexible cord may be used except: As allowed under Sections 400-7 and 400-8 of NFPA NEC 2002. NEC states: Flexible cords shall not be used as a substitute for the fixed wiring. MI observed several extension cords and power-strips being utilized to extend circuits to power multiple appliances. Remove extension cords from A/C receptacles. Prior to any modifications to approved fixed electrical installations vessel must submit electrical drawings to USCG and gain approval for proposed modifcations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2023
Resolved 15 October 2023
Resolution: Portable cords removed, appliances plugged into receptacles.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 September 2022
Resolved
If fuel fill flexible section is a nonconductor of electricity, the metallic sections of the fill pipe separated thereby must be joined by a conductor for protection against generation of a static charge when filling with fuel. Provide bonding wires from tank to metallic fuel fill for all installed fuel tanks. Port/Starboard main and generator fuel tanks.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 11 October 2022
Resolution: Bonding wires added to all fuel fill points.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 26 September 2022
Resolved
Except on a vessel limited to daytime operations, the compass must be illuminated. Provide a suitable marine magnet compass with means to illuminate.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 11 October 2022
Resolution: New compass installed with light.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 September 2022
Resolved
Each small battery installation must be located in a well ventilated space and protected from falling objects. Provide means to cover batteries terminals under operating station
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 11 October 2022
Resolution: Protective covers added to battery terminals.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2022
Resolved
Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Provide cover for electrical junction box in STBD engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 11 October 2022
Resolution: Cover provided to junction box.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 March 2022
Resolved
Port main engine room outboard electrical junction box missing cover plate.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 March 2022
Resolved 11 October 2022
Resolution: Verified proper installation of electrical junction box.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 July 2020
Resolved
Propulsion machinery must be suitable type and design and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load.
Loss of propulsion in port engine while underway, due to alarm and loss of oil psi.
Vessel is required to demonstrate proper operation of propulsion in the presence of a MI, prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 July 2020
Resolved 30 July 2020
Resolution: MI verified proper operation of BMDE's during sea trials. No abnormalities noted. BMDE's operated as designed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 February 2020
Resolved
Valves for removing water or impurities from diesel fuel in water traps or strainers are permitted. These valves must be provided with caps or plugs to prevent fuel leakage. Provide cap or plug on fuel filter valve.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 February 2020
Resolution: Plugs installed below drain valves.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 February 2020
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards must be in satisfactory condition. Repair fuel leak in starboard engine fuel return line.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 February 2020
Resolution: All pipe fitting removed and resealed, conducted op test, all sat.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 18 September 2018
Resolved
Provide current and correct charts for area of navigation.
Action required: 10 - Deficiency Rectified
Due 18 September 2018
Resolved 18 September 2018
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 18 September 2018
Resolved
Provide current Coast Pilot.
Action required: 10 - Deficiency Rectified
Due 18 September 2018
Resolved 18 September 2018
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 18 September 2018
Resolved
Provide current Light List.
Action required: 10 - Deficiency Rectified
Due 18 September 2018
Resolved 18 September 2018
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 September 2018
Resolved
Provide a lanyard, at least 3 feet in length, secured around the body of one ring lifebuoy.
Action required: 10 - Deficiency Rectified
Due 18 September 2018
Resolved 18 September 2018
Resolution: This discrepancy was corrected, to the satisfaction of the attending Marine Inspector, prior to departing the vessel.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 29 July 2016
Resolved
Install draft marking as required 46 CFR 185.602
Action required: 705 - Other - as specified
Due 31 March 2018
Resolved 28 March 2018