← All vessels
CBR 2309
Tank Barge · Barge class · Built 2010s · USCG Heartland District (CGD-H) · Other hulls named CBR 2309 · CENTRAL BOAT RENTALS, INCORPORATED operator of record, 2023
CBR 2309 is a 2015 tank barge. The Coast Guard has recorded 14 inspections since 2015, most recently in October 2025, along with 11 deficiencies.
Records from 2015 to 2025. Most recent: inspection, 7 October 2025.
- Built
- 2015
- Last inspected
- 7 October 2025
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 11 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
1258612
1327622
Flag
UNITED STATES
—
Maury page id
psix-1327622
Inspections, by type
Years with a record
11 calendar years (2015–2025)
The 14 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.0 ft
Registered tonnagegross 705 / net 705
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · PORT ALLEN, LA, UNITED STATES · built 2015
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portMORGAN CITY, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 9 June 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it705 - Simplified, Gross Ton
705 - Simplified, Net Ton
705 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 14
7 October 2025
Administrative Inspection · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8249153
4 June 2025
Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8151957
4 November 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8029122
12 October 2023
Periodic Inspection · Re-Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7807710
19 October 2022
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7580366
4 November 2021
Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7345343
1 October 2020
Hull Examination · MTSA Verification · COI Inspection · Internal Structural Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7064433
18 June 2020
COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6980453
4 October 2019
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6828531
10 October 2018
Administrative Inspection · Periodic Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6558823
12 October 2017
MTSA Verification · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6282173
4 October 2016
MTSA Verification · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6021756
8 May 2015
COI Inspection · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5120867
4 March 2015
Construction Oversight
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5114331
Deficiency record · 11
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 4 June 2025
Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society. Marine Inspector observed damage to a vertical stiffener in the starboard bow rake. Vessel shall make repairs prior to next Certificate of Inspection.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 June 2025
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern. Marine Inspector observed the absence of vapor connection flange stud on the starboard side of the vapor connection manifold. Vessel shall install correct equipment prior to loading cargo that requires VCS connection.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 4 June 2025
Resolved
All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Marine Inspector observed inoperable prime mover. Vessel shall repair engine to fully operational status before conducting discharge of cargo.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 November 2024
Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements:(1) A system meeting the requirements of 46 CFR 39.2007: The tank overfill alarm required by paragraph (a) of this section must — Activate a visible and audible alarm so that it can be seen and heard on the vessel where cargo transfer is controlled and in the cargo deck area.
Cargo tank number 3 had a visibly higher level than the other cargo tanks and the overfill alarm was activated in the alarm panel. Owner/operator should discharge the cargo to below the overfill set point and verify the overfill alarm will operate as designed when tested.
46 CFR 39.2007(d)(3)
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 November 2024
Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors, such as bilge slop tanks and contaminated drain tanks, must be fitted with a single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two screens of at least 20 by 20 mesh spaced not less than one-half inch (13mm) nor more than 11/2 inches (38mm) apart.
Diesel fuel tank for the prime mover had a mesh screen attached to the gooseneck vent with a hose clamp and the mesh was split open around the edge. Vessel shall enact permanent repairs to the satisfaction of the Coast Guard.
46 CFR 56.50-85(8)
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 7 November 2024
Resolved
When the dangerous cargo barge is carrying only a single product, the Warning Sign required by paragraph (e)(1) of this section can be considered as meeting the requirements for the cargo location sign. The name of the commodity shall be added to the Warning Sign.
The cargo currently loaded on board was not posted. Owner/operator shall post the loaded cargo name on the warning sign.
46 CFR 151.45-2(e)(2)(ii)
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 4 November 2024
Resolved
A cargo information card for each cargo regulated by this subchapter shall be carried on the bridge or in the pilot house of the towing vessel, readily available for use by the person in charge of the watch. This
information card shall also be carried aboard the barge,mounted near the Warning Sign required by paragraph (e)(1) of this section.
The cargo information card was not posted. Owner/operator shall post the cargo information card near the warning sign.
46 CFR 151.45-2(e)(3)
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 17 October 2023
Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
On 17OCT2023 at Intergulf Dock, the Marine Inspector noticed a small amount of cargo in the #3 starboard wing void. On 19OCT2023, the day the vapor tightness test was scheduled, the MI confirmed with Chanel Shipyard employees that there was a cargo leak on the starboard aft void along the #3 COT and temporary repairs were conducted.
The barge is authorized a one-time discharge in the Houston AOR and proceed directly to Southwest Shipyard Channelview to make permanent repairs. Once permanent repairs have been conducted to the satisfaction of CG MI, the vessel shall conduct a vapor tightness test in accordance with 40 CFR 61.304(f) with the wing voids open in the presence of the attending MI prior this deficiency being cleared.
46 CFR 332.60-1(a)
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 17 October 2023
Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements: Includes a self-contained power supply.
Barge representative was unable to test high level/overfill alarms due unavailability of necessary equipment to conduct required tests.
46 CFR 39.2009(a)(1)(i)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 October 2023
Resolved
The following locations in the weather are Class I, Division 1 (Zone 1) locations and may have only approved intrinsically safe, explosion proof, or purged and pressurized electrical equipment, and through runs of marine shipboard cable if the location is - within 10 meters (33 ft) of vent outlets for free flow of vapor mixtures and high velocity vent outlets for the passage of large amounts of vapor, air or inert gas mixtures during cargo loading and ballasting or during discharging.
MI observed cargo pump prime mover electrical box is not intrinsically safe or explosion proof and within 33' of high velocity p/v.
Vessel shall have an adequate mean to shutdown the prime mover without compromising the safety of the vessel.
46 CFR 111.105-31(l)(4)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 October 2022
Resolved
NFPA 10 incorporated by reference requires portable fire extinguishers shall be installed in the bracket supplied by the extinguisher manufacturer. MI's observed damaged and unserviceable fire extinguisher bracket in vicinity of the stern tank top. Renew fire extinguisher bracket with approved bracket to the satisfaction of the MI.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.