Records from 2017 to 2026. Most recent: inspection, 11 July 2026.
Inspection history · 7
11 July 2026
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8437106
12 January 2026
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8294830
7 December 2023
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7836077
12 April 2022
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7429395
16 September 2020
Administrative Inspection · PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7058774
4 May 2017
Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6138828
1 May 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6136255
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 12 April 2022
Resolved
4103 - Emergency Systems - Alleyways, stairways and exits giving access to the muster and embarkation stations shall be lighted. Such lighting shall be capapble of being supplied by the emergency source of electrical power as required by regulation II-1/42 or II-1/43, as appropriate. In addtion to and as part of the markings required under regulations II-2/28.1.10, routes to muster stations shall be indicated with the muster symbol, intended for that purpose, in accordance with the recommendations of the organization. PSCO observed 12 emergency lights INOP on the superstructure and around the deck of vessel. 74 SOLAS (20)III/11.5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 April 2022
Resolved 13 April 2022
Resolution: Vessel replaced/repaired emergency lights. Class survey entered into documents.
09 - Working and Living Conditions › 091 - Living Conditions › Laundry
Issued 16 September 2020
Resolved
Electrical installations shall be such that the safety of passengers, crew, and ship from electrical hazards will be ensured. PSCO observed unapproved electrical installations and wire splices in officers laundry room. 74Solas(14)11-1/40.1.3
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 12 May 2021
Resolution: Class Survey Statement recieved.
14 - Pollution Prevention › 147 - Anti-Fouling › Logbook entries referring AFS
Issued 16 September 2020
Resolved
Vessel must maintain a ballast water management (BWM) plan that has been developed specifically for the vessel and that will allow those responsible for the plan's implementation to understand and follow the vessel's BWM strategy and comply with the requirements of this subpart. The plan must include - detailed fouling maintenance and sediment removal procedures. Vessel was not able to produce biofouling records upon request. 33CFR151.2050(g)(3)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 3 February 2021
Resolution: Vessel submitted completed biofouling records.
14 - Pollution Prevention › 147 - Anti-Fouling › Other (AFS)
Issued 16 September 2020
Resolved
Following installation, the master, owner, operator, agent, or person in charge of the vessel subject to this subpart must properly maintain the BWMS in accordance with all manufacturer specifications. Vessel BWM system was found to be inoperable. 33CFR151.2025(a)(1)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 3 February 2021
Resolution: Vessel submitted class survey attesting to the good order of the BWTS.