Records from 2015 to 2026. Most recent: inspection, 9 May 2026.
Inspection history · 25
9 May 2026
PSC B · COC-GAS Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8359294
27 December 2024
Administrative Inspection · PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8051308
18 October 2024
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8021100
1 December 2023
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7833444
30 November 2023
COC-GAS Renew · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7831904
14 October 2022
COC-GAS Annual · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7573848
13 October 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7577118
19 November 2021
PSC B · COC-GAS Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7348668
14 November 2021
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7350477
9 October 2020
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7074510
8 October 2020
PSC B · COC-GAS Annual · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7073960
5 October 2020
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7071560
15 December 2019
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6874079
15 December 2019
Loadline Exam · Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6874561
15 December 2019
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6876148
1 October 2019
COC-GAS Renew · Ballast Water Examination · Administrative Inspection · ISPS II Exam · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6824863
22 September 2018
COC-GAS Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6546082
6 July 2018
In-Service Inspection · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6468422
11 January 2018
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6336157
11 September 2017
Ballast Water Examination · COC-GAS Renew · ISPS II Exam · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6256321
19 December 2016
COC-GAS Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6058919
26 September 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6009976
3 September 2016
PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5990926
2 September 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5991058
1 December 2015
Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5769417
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 30 November 2023
Resolved
SMOKE DETECTOR ABOVE INCINERATOR WAS DAMAGED AND INOPERABLE.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 1 December 2023
Resolution: Received report from Lloy'ds of London attesting to the sufficient replacement and repair of the smoke detector mounted above the incinerator in the engine room.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 December 2019
Resolved
ICLL (88) An. 15: After any survey of the ship under article 14 bas been completed, no change shall be made in the structure.
Vessel's hull was punctured when it allided with morring dolphin, resulting in flooding the #1 Port ballast tank and possibly other damage under the water line.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 January 2020
Resolved 5 October 2020
Resolution: Vessel submitted a class report attesting to satisfactory repairs.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 1 October 2019
Resolved
0414 - Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the administration with a stored energy capability of at least 3 consecutive starts. A second source of energy shall be provided for an additional three starts within 30 minutes unless manual starting can be demonstrated to be effective. Emergency diesel generator could not be started after multiple attempts using the battery as the primary means of starting.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2019
Resolution: Received LR class report attesting to the vessel receiving replacement batteries. Battery start on emergency generator is now operational.
Deck/Cargo › Cargo Stowage › General
Issued 11 September 2017
Resolved
The airlock should consist of 2 steel doors that are substantially gas tight and self closing. The outside airlock door is no longer gas tight when fully closed and the self closing mechanism is not working properly 74 SOLAS (14) CII/13.1, IGC CODE 3.6.1 & 3.6.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2017
Resolution: SEC HOU-GAL PSC received a class report from ABS satisfying the requirement.
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 11 September 2017
Resolved
Cargo tank pressure relief valve vent exits should be arranged at a distance at least equal to 3 or 25M, whichever is less from the nearest air intake or opening to accommodation spaces…cargo tank #4 vent mast aft of cargo motor room does not must 25m distance requirement. Flag equivalency determined to be insufficient evidence of compliance with 46CFR154. 74SOLAS(14)VII/13,IGC Code 8.2.10
Action required: 705 - Other - as specified
Due 11 July 2018
Resolved 6 July 2018
Resolution: SOE imposed special restriction to modify venting construction to comply with 46CFR154.805(e) prior to next U.S. port call after next drydock.