Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it44289 - Convention (Subpart B), Gross Ton 81547 - Dead Weight, Metric Ton 26862 - Convention (Subpart B), Net Ton 95394 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.
Inspection history · 8
23 May 2025PSC B
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8139363
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present resolutions to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The PSCO observed 8 patches on the forward portion of the main boiler. When patches removed, PSCO observed cuts into the shell of boiler exposing inside
Due 17 February 2017
Resolved 13 February 2017
Resolution: Received satisfactory Class Report via email indicating patches on boiler liner had been cut out and repaired with new insulation installed to the satisfaction of Class.
Every steam pipe and ever fitting connected through which steam may pass shall be so constructed and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed steam leaking from the Incenerator Sludge Steam line piping. This may pose a risk to the personnel. SOLAS 74 (2014) II-1/33.1
Due 17 February 2017
Resolved 13 February 2017
Resolution: Received satisfactory Class Report via email indicating that the incenerator sludge line had been secured and lagged by the crew to the satisfaction of the attending Class surveyor.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.