Records from 2000 to 2026. Most recent: inspection, 31 July 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 35
31 July 2026
Administrative Inspection · Plan Review "T" Boat · Internal Structural Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8451343
7 November 2025
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8265827
17 July 2025
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8188198
17 December 2024
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8044879
1 November 2023
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7819457
21 October 2022
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7581546
3 November 2021
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7345238
22 October 2020
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7082487
2 December 2019
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6944357
14 November 2019
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6856218
2 November 2018
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6574650
9 July 2018
Inclining Experiment
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6477743
1 November 2017
Annual Inspection · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6298234
28 September 2017
Plan Review "T" Boat
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6276897
18 August 2017
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6244548
25 October 2016
Annual Inspection · DAPI Audit · Internal Structural Exam
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6029894
17 September 2015
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5218618
21 August 2014
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 4931315
15 March 2010
Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3697099
2 December 2009
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3641499
24 July 2008
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3278477
4 June 2008
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 3226242
4 June 2007
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2951347
8 June 2006
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2674182
7 June 2006
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2672846
23 June 2005
Simplified Stability Test
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2400102
21 June 2005
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2397520
1 January 2005
Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2329415
23 June 2004
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2108535
2 June 2004
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2084991
1 April 2004
Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 2035739
13 June 2003
Periodic Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1815675
17 May 2002
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1622041
11 June 2001
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1410579
14 September 2000
Hull Examination · Plan Review "T" Boat · Initial Certification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1399451
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 11 November 2025
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station:
(1) A light to indicate discharge;
(2) An audible alarm that sounds upon discharge. MI found Fire Boy systems helm visual and audible alarm to be intermittent.
46 CFR 181.420(b)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 July 2026
Resolution: Photo and video of new fireboy helm monitor alarm and visual indication
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 11 November 2025
Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. MI found penetrations in water tight bulkhead were not sealed. 46 CFR 179.320(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2026
Resolution: Vessel used 4200 silicone for tubings/fittings and 5200 silicone for bulkhead penetrations. MAterial condition sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 11 November 2025
Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. MI found electrical wiring in collision bulkhead not sealed. 46 CFR 179.320(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2026
Resolution: All sat.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 11 November 2025
Resolved
Except on a vessel limited to daytime operations, the compass must be illuminated. MI found compass light out. 46 CFR 184.402(c)
Limited to daytime operations
Action required: 705 - Other - as specified
Resolved 30 July 2026
Resolution: Photo of installed light
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 11 November 2025
Resolved
Life floats and buoyant apparatus must not be stowed in tiers more than 1,220 millimeters (4 feet) high. When stowed in tiers, the separate units must be kept apart by spacers. MI found spacers missing. 46 CFR 180.137(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 July 2026
Resolution: Photo of larger spacers recieved
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 November 2025
Resolved
This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. MI found generator's belt inoperable during operation. Effect repairs prior to use.
46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 5 August 2026
Resolution: New generator installed. Plan review conducted by [name withheld] condition matched drawings and plans provided.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 18 August 2017
Resolved
A vessel of not more than 65 feet in length must have a collision bulkhead if it: is more than 40 ft in length and operates on partially protected waters. 46CFR179.212
Install a collision bulkhead that meets the requirements of 46CFR179.310 and 179.320
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 2 November 2018
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 17 September 2015
Resolved
During testing of vessels pre engineered fixed gas extinguishing system, the required audible and visual indicators failed to operate.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 October 2015
Resolved 23 September 2015
Resolution: Witnessed proper operation of audible and visual alarms as required for a pre engineered fixed gas system. O/O provided video evidence of satisfactory operation.
Lifesaving › Lifebuoys › Serviceable
Issued 17 September 2015
Resolved
Vessels life ring buoy was found unserviceable due to deteriorated grab lines.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 September 2015
Resolved 17 September 2015
Resolution: Vessel replaced life ring buoy prior to marine inspectors departing from inspection.
Stability › Unintentional Flooding › General
Issued 2 December 2009
Resolved
The bilge pump/ sink drain overboard located in second compartment from bow, stbd side aft does not have an overboard shut-off as required by 46 CFR 179.340 (c). VSL shall install positive shut off valve prior to 1 May 2010.
Action required: 705 - Other - as specified
Due 1 May 2010
Resolved 5 April 2010
Engineering › Bilge Water Management System › Piping
Issued 2 December 2009
Resolved
The electric Submersible bilge pump in second compartment aft of bow discharges through non-flexible PVC pipe. Operator shall install proper piping material in accordance with 46CFR182.530(f)
Action required: 705 - Other - as specified
Due 1 May 2010
Resolved 5 April 2010
Construction/Loadline › Penetrations › Pipe Flange
Issued 2 December 2009
Resolved
The FWD Engine room bulkhead has numerous penetrations that are not vapor tight in accordance with 46CFR177.405(c). Make this bulkhead vapor tight with approved marital
Action required: 705 - Other - as specified
Due 1 May 2010
Resolved 5 April 2010
Engineering › Fuel Oil Storage/Transfer System › Flange
Issued 2 December 2009
Resolved
The fuel oil return valve mounting flange on the forward end of the fuel oil tank has epoxy/ putty at bottom of weld. Remove putty for inspection.
Action required: 705 - Other - as specified
Due 1 May 2010
Resolved 15 March 2010
Resolution: Crack discovered at flange, properly repaired and tested.
Engineering › Bilge Water Management System › Not Operational
Issued 4 June 2008
Resolved
Prove proper operation of amidship bilge alarm prior to operating vessel.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 July 2008
Resolved 24 July 2008
Lifesaving › Launching Appliances › Release Mechanism
Issued 4 June 2008
Resolved
Replace outdated hydrostatic release for Epirb with current model.
Action required: 705 - Other - as specified
Due 31 July 2008
Resolved 24 July 2008
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 4 June 2007
Resolved
1. Clean bilge to prove proper operation of bilge pumps.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 June 2007
Resolved 7 June 2007
Resolution: Cleaned oil from bilge and ran both bilge pumps.
Engineering › Bilge Water Management System › Pump
Issued 4 June 2007
Resolved
Clean bilge to prove proper operatio0n prior to departure
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 6 June 2007
Resolved 7 June 2007
Resolution: Cleaned oil from bilge and operated both installed pumps.
Engineering › Diesel Engine (propulsion-reduction gear) › Gear, Timing
Issued 7 June 2006
Resolved
Alternator belt loose, needs to be tightened.
Condition: Improper/Lack of Maintenance
Due 7 July 2006
Resolved 8 June 2006
Resolution: Belt tightened.
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 7 June 2006
Resolved
Missing a float light for B/A
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 7 July 2006
Resolved 8 June 2006
Resolution: Float light added to BA.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 7 June 2006
Resolved
Prove proper operation of high level bilge alarm in engine room.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 July 2006
Resolved 8 June 2006
Engineering › Fuel Oil Service System › Valve
Issued 7 June 2006
Resolved
Re-stencil emergency fuel shut-off.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 July 2006
Resolved 8 June 2006
Resolution: Emergency fuel shut-off stenciled.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 June 2004
Resolved
Ensure all electrical wires are supported with metal brackets every 24 inches. Remove plastic wire ties being used as supports.
Due 2 July 2004
Resolved 23 June 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 June 2004
Resolved
Support generator cables in fwd compartment below operating station.
Due 2 July 2004
Resolved 23 June 2004
Fire Fighting › Ventilation Systems
Issued 13 June 2003
Resolved
SUBMIT PLANS TO MSO TOLEDO OFFICE FOR THE INSTALLATION OF VENT CLOSURES FOR ENGINE AND FUEL TANK SPACE. SIX VENTS TOTAL. AS PER 46 CFR 182.465(h). LEGACY COMPONENT DESC: Ducts
Condition: Design Flaw
Due 13 July 2003
Resolved 2 June 2004