MILLER GIRLS is a 1975 passenger vessel (inspected). The Coast Guard has recorded 76 inspections since 1986, most recently in January 2026, along with 189 deficiencies, 2 operational controls, 1 with no removal date recorded and 1 casualty investigation in 2005.

Records from 1986 to 2026. Most recent: inspection, 23 January 2026.

Built
1975
Last inspected
23 January 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
1 with no removal date recorded

Identity

WDD2245
134998
Flag
UNITED STATES
367112850
Maury page id
psix-134998

Inspections, by type

…with no type recorded4
Years with a record 37 calendar years (1986–2026)
The 76 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)62.0 ft × 18.0 ft × 6.3 ft
Registered tonnagegross 47 / net 32
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · JERSEY CITY, NJ, UNITED STATES · built 1975
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 26 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it47 - Regulatory (Subpart C or D), Gross Ton
32 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDD2245MMSI 367112850 · active · compulsorily equipped · granted 18 February 2026, expires 10 May 2036
WSA4163MMSI not assigned · expired · compulsorily equipped · granted 26 April 1996, cancelled 1 July 2006
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 76

23 January 2026 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8300534
15 December 2025 Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8283349
4 November 2024 Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8019673
1 October 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8012656
7 December 2023 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7834703
9 June 2023 COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7700325
18 May 2023 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7691660
9 December 2021 Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7382856
10 February 2021 Administrative Inspection · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7138282
2 March 2020 Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6917780
26 November 2019 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6863223
26 November 2019 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6863239
14 January 2019 Examination of Repairs · Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6609792
2 February 2018 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6348306
4 December 2017 Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6356496
8 February 2017 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6084529
22 January 2016 Administrative Inspection · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5801587
3 November 2015 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5756133
8 December 2011 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4204396
26 August 2011 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4130875
24 February 2011 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3951553
31 January 2011 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3936318
13 January 2011 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3925965
2 December 2010 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3902659
6 April 2009 Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3447323
24 February 2009 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3423145
24 September 2008 Plan Review "T" Boat
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3337808
19 September 2008 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3328232
25 August 2008 COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3308409
25 May 2007 MARPOL Annex V Examination · Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2940290
24 January 2007 Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2861084
24 March 2006 MARPOL Annex V Examination · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2622291
8 September 2005 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2491067
18 July 2005 MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2430502
24 January 2005 Internal Structural Exam · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2279887
5 January 2004 MARPOL Annex V Examination · Deficiency Check · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1974761
11 September 2003 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1903296
11 September 2003 Type not recorded
No type recorded · USCGC PENOBSCOT BAY (WTGB 107) · USCG Northeast District (CGD-NE) · Activity 1904061
21 July 2003 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1853254
7 January 2003 Internal Structural Exam · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1727096
12 November 2002 Administrative Inspection
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1704498
26 May 2002 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1629075
18 December 2001 Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1476538
29 January 2001 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1430930
29 January 2001 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1468183
1 June 2000 Excursion Permit
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1426414
14 October 1999 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1441571
5 April 1999 Plan Review "T" Boat
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 785735
23 October 1998 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 803540
9 October 1998 Hull Examination · COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1368872
17 October 1997 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1386132
25 September 1997 Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 775626
14 January 1997 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1107261
30 December 1996 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1095735
12 September 1996 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1256750
19 September 1995 COI Inspection · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 876219
2 September 1994 Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 867065
10 January 1994 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1161806
3 September 1993 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 833830
9 July 1993 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 844537
2 July 1993 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 843260
10 August 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1259888
26 August 1991 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1250614
3 June 1991 Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1244882
23 January 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 904514
22 August 1990 Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1222332
23 August 1989 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1195376
19 April 1989 Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 898979
23 August 1988 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1346539
17 June 1988 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 891234
24 September 1987 Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1009281
1 September 1987 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1310006
14 April 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1330331
15 September 1986 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1320308
29 August 1986 Initial Certification
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1310032
13 May 1986 Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1310029

Deficiency record · 189

08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 23 January 2026 Resolved
"On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level..." Vessel audible bilge alarm at operating station is inoperable, along with visual bilge alarm for parlor. Fix bilge alarms at the operating station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 February 2026
Resolved 9 February 2026
Resolution: Received videos of 04 audible/visual bilge alarms at bridge
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 January 2026 Resolved
"A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry: six hand red flare distress signals... and; six hand orange smoke distress signals..." Vessel's red flares are expired. Replace with the appropriate amount of flares.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 February 2026
Resolved 19 February 2026
Resolution: Rcvd photo of unexpired flares onboard
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 23 January 2026 Resolved
"Except on a vessel limited to daytime operations, the compass must be illuminated." Vessel's compass is not illuminated. Provide illumination prior to operating at night.
Action required: 705 - Other - as specified
Resolved 9 February 2026
Resolution: Received video of magnetic compass illumination
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 4 November 2024 Resolved
46 CFR § 177.10-5 Fire protection: The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. Marine inspectors found missing fireproof material in the forward engine room overhead. Submit repair plan for approval.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 November 2024
Resolution: Wtinessed new fire stop foam added to deck penetration
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 November 2024 Resolved
46 CFR § 183.350 Batteries - General: Each battery must be located as high above the bilge as practicable, secured to protect against shifting with the roll and pitch of the vessel, and free from exposure to water splash or spray. Marine inspectors found water in a battery casing on the starboard side of the engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 8 November 2024
Resolution: Battery box found free of water
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 November 2024 Resolved
Small unfired pressure vessels which do not fully comply with the requirements of this subchapter may be accepted by the Commandant for installation on vessels subject to inspection by the U. S. Coast Guard, provided: 1. The failure of such unfired pressure vessels will not endanger the safety of the vessel. 2. The internal volume does not exceed 5 cubic feet. 3. The construction complies with the requirements of a recognized code, or tests as prescribed by the Commandant are carried out to prove that the design and fabrication are suitable for the intended application. 4. Such unfired pressure vessels shall otherwise comply with the requirements for plan approval and marking as specified in this subchapter. 2 gal air compressor used for horn on board does not have the ASME stamp and must be replaced within 14 days. 46 CFR 54.01-5(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 November 2024
Resolved 8 November 2024
Resolution: UPV removed and replaced horn with electric horn
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 October 2024 Resolved
Annual inspection. Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. This vessel's COI anniversary date is 09 JUN 2023. It lapsed is latest date to conduct a 1st annual inspection 09 SEP 2024. Schedule a COI renewal through [email withheld] to clear.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2024
Resolution: Issued COI
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 9 June 2023 Resolved
Each water light must be of an approved automatic electric type constructed in accordance with subpart 161.010 of this chapter. The light attached to the ring bouy on board was expired.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 June 2023
Resolved 29 June 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 June 2023 Resolved
The master shall determine that the vessel complies with all applicable stability requirements in the vessel's stability letter... The vessel may not depart until it is in compliance with these requirements. Vessel was not found in compliance with conditions of their stability letter for deck cargo. Boom is stored too high off the weather deck.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 June 2023 Resolved
All valves in the fuel lines shall be tested by operation locally and at remote operating positions. Fuel shutoff valves were found to be inoperable at the time of inspection.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 June 2023 Resolved
The power fire pump shall be self priming and of such size as to discharge an effective stream form a hose connected to the highest outlet. Fire pump did not build up enough discharge pressure to be considered an effective stream and be utilized for its intended purpose.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 June 2023 Resolved
The means provided for pumping bilges shall be tested by operation. Vessel's bilge system was inoperable at the time of inspection and inspectors were unable to witness the proper operation of the bilge pump
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 June 2023
Resolution: Bilge pump restored to operational status
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 June 2023 Resolved
All vessels except non-self propelled vessels shall be provided with suitable steering apparatus. At the time of inspection, vessel's main steering ram was found actively leaking oil. Replace leaking steering ram.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 June 2023 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. Wire feed through aft engine room bulkhead on the starboard side require fire stop or a suitable alternative.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 June 2023 Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. Helm pump was found leaking hydraulic fluid at the time of inspection.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 June 2023 Resolved
Rails or equivalent protection shall be installed near the periphery of all-weather decks accessible to passengers and crews. Multiple stanchions were missing, and rails were not tightened.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 9 June 2023 Resolved
A hatch exposed to the weather must be watertight. Hatch to fore peak was not watertight.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 9 June 2023 Resolved
A hatch exposed to the weather must be watertight. Replace deteriorated gasket on the hatch on top of the slop tank.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 June 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 May 2023 Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel missed its fourth annual inspection due 14Apr2023.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 May 2023
Resolved 9 June 2023
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 January 2019 Resolved
Examine all accessible parts of the exterior and interior hull to assess the condition of the hull structure. There is a hole through the hull, starboard side, engine room. 46 CFR 176.25-5(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 February 2019
Resolution: Hull portion was cropped and renewed.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 January 2019 Resolved
Liquid level indicating gages shall be of heat resistant materials and adequately protected from mechanical damage. The liquid level gages in the engine room were constructed of plastic and not protected from damage. 46 CFR 180.20-25(a)(5)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2019
Resolved 13 February 2019
Resolution: Plastic replaced with glass and protective rods.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 January 2019 Resolved
Each opening port light must be constructed so that it can be secured watertight. The port-side port light in the engine room has a crack running through it. 46 CFR 171.116(f)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2019
Resolved 13 February 2019
Resolution: Cracked glass replaced.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 14 January 2019 Resolved
A vessel of less than 20m must have a sound signal with a range of at least .5 nautical miles. The sound signal is not strong enough to be heard at .5 nautical miles. 33 CFR 83.33(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2019
Resolved 13 February 2019
Resolution: Compressor for horn was repaired, fully functional.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 January 2019 Resolved
Batteries shall be effectively screened to minimize the risk of accidental sparks through dropping of metallic items on the connections. The battery forward of the generator has no cover. 46 CFR 183.05-20(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2019
Resolved 13 February 2019
Resolution: Battery cover provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 January 2019 Resolved
Wiring joints and splices shall be mechanically secure and made in junction boxes. Wires for the bilge pumps were spliced with electrical tape. 46 CFR 183.05-50(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2019
Resolved 13 February 2019
Resolution: Splices enclosed in a junction box.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 14 January 2019 Resolved
An inspection of the bridge-to-bridge radio stations on board vessels subject to the Vessel Bridge-to-Bridge Radiotelephone Act must be conducted by an FCC-licensed technician. The Safety Radiotelephony certificate was expired. 47 CFR 80.59(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2019
Resolved 13 February 2019
Resolution: Certificate renewed and valid.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 14 January 2019 Resolved
Life ring buoys must be approved in accordance with 160.050. Both life ring buoys on the vessel had grab lines that were weathered to the point of breaking and fraying. 46 CFR 180.70(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2019
Resolved 13 February 2019
Resolution: Grab lines replaced.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 14 January 2019 Resolved
The fuel shutoff valve at the tank shall be operable from outside the compartment. The fuel shutoff reach rod was disconnected from the fuel line valve. 46 CFR 182.20-40(b)(3)
Action required: 10 - Deficiency Rectified
Resolved 14 January 2019
Resolution: Reach rod reconnected in the presence of the MI.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 14 January 2019 Resolved
A vessel must carry adequate and up-to-date charts. The charts had not been updated with notices to mariners. 46 CFR 184.420(a)(1)
Action required: 10 - Deficiency Rectified
Resolved 14 January 2019
Resolution: Charts updated in the presence of the MI.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 2 February 2018 Resolved
Provide ground detection.
Action required: 705 - Other - as specified
Due 16 March 2018
Resolved 2 April 2018
Resolution: Extended from 2/16 to 2/28 to facilitate order/shipping/installation time. Extended again to 3/16. Still awaiting parts. Cleared deficiency, vessel added ground fault detection system & special note will be added to vessel details.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 8 February 2017 Resolved
There are several broken stanchions onboard, these need to be replaced to provide more stable railing. The cables used as courses on the deck rails are not properly spaced, re-run the cables to provide the required 12" spacing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 February 2017
Resolved 22 February 2017
Resolution: MI's attended to vessel to review replaced stanchions.
Lifesaving › Lifefloat › Float-free Link
Issued 26 August 2011 Resolved
Provide proper weak link for life floats. Vessel limited to 100ft depth or less until weak link replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2011
Resolved 1 September 2011
Resolution: Received receipt for link that was replaced on vsl. Vsl limitation to 100ft depth removed.
Lifesaving › Lifefloat › Markings
Issued 26 August 2011 Resolved
Properly mark lifefloats
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 August 2011
Resolved 26 August 2011
Resolution: Fixed on the spot.
Construction/Loadline › Structures › Superstructure
Issued 26 August 2011 Resolved
Repair replace #11 portside stantion from bow.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 September 2011
Resolved 1 September 2011
Resolution: Witnessed replaced #11 stantion installed.
Engineering › Bilge Water Management System › Not Operational
Issued 26 August 2011 Resolved
Provide proper operation of bilge drainage system.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 September 2011
Resolution: Witnessed proper operation of bilge system.
Engineering › Fuel Oil Service System › Portable Fuel System
Issued 13 January 2011 Resolved
Arrest leak in way of rear main oil seal for port side generator.
Action required: 705 - Other - as specified
Due 31 January 2011
Resolved 31 January 2011
Resolution: Repairs made to fix leak in way of rear main oil seal on port generator.
Lifesaving › Lifefloat › Not on Board
Issued 2 December 2010 Resolved
Vessel is fitted with two (02) buoyant apparatus 160.010/78/2. Vessel shall be fitted with lifefloats meeting lifesaving requirements to date. The vessel will have one year to provide lifefloats approved in 46 CFR 180.500(c) and in accordance with the COI.
Action required: 705 - Other - as specified
Due 2 December 2011
Resolved 13 January 2011
Resolution: Attended vessel and verified that the vessel was fitted with two (02) new lifefloats 160.027/76/2. Deficiency cleared.
Engineering › Bilge Water Management System › Pump
Issued 24 February 2009 Resolved
Remove electrical submersible bilge pump currently not in service IWO void #1, aft centerline
Due 6 May 2009
Resolved 29 April 2009
Resolution: Electric submersible bilge pump and all associated wiring and hoses was removed.
Engineering › Bilge Water Management System › Strainer
Issued 24 February 2009 Resolved
Repair wasted section of strainer on bilge suction pipe located in the forepeak.
Due 6 May 2009
Resolved 29 April 2009
Resolution: Proper repairs to the bilge strainer were carried out.
Construction/Loadline › Structures › Door
Issued 24 February 2009 Resolved
Make watertight door for entry into the house watertight. Replace worn and hard gasket and chalk test to the satisfaction of a Coast Guard Marine Inspector.
Due 6 May 2009
Resolved 29 April 2009
Resolution: WTD was chalk tested satisfactory.
Construction/Loadline › Hull › Bracket
Issued 24 February 2009 Resolved
Crop and renew sections of the shelf that are wasted for the generator foundation mount as discussed with the vessel representative.
Due 6 May 2009
Resolved 29 April 2009
Resolution: Repairs were completed to the generator foundation shelf.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 24 February 2009 Resolved
Arrest/repair exhaust leak in way of the starboard MDE.
Due 6 May 2009
Resolved 29 April 2009
Resolution: Exhaust leak was repaired.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Piping (exhaust)
Issued 24 February 2009 Resolved
Repair/re-install loose lagging in way of the exhaust on the generator.
Due 6 May 2009
Resolved 29 April 2009
Resolution: New lagging was installed satisfactory.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 February 2009 Resolved
Crop and renew sections of deck and bulkhead located on the portside, aft area in void #4 as discussed with the vessel representative.
Due 6 May 2009
Resolved 29 April 2009
Resolution: All wasted areas were renewed and visually inspected.
Engineering › Steering Gear System › Pin
Issued 24 February 2009 Resolved
Provide cotter pins or additional nuts for two (2) bolts servicing the steering ram linkage on both port and starboard side.
Due 6 May 2009
Resolved 29 April 2009
Resolution: Cotter pins were provided and installed as directed.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 24 February 2009 Resolved
Make forward deck hatch watertight in accordance with 46 CFR 171.124 (Old T). Chalk test and hose test hatch to 30 PSI to ensure watertight to the satisfaction of a Coast Guard Marine Inspector.
Due 6 May 2009
Resolved 1 June 2009
Resolution: Completed chalk test and visually inspected hatch from within the space during hose test to ensure water tightness.
Construction/Loadline › Penetrations › Pipe Flange
Issued 24 February 2009 Resolved
Make pipe penetration located in the #4 void, aft bulkhead on the starboard side, watertight.
Due 6 May 2009
Resolved 29 April 2009
Resolution: Pipe penetration was properly stuffed.
Engineering › Fuel Oil Service System › Hose
Issued 25 August 2008 Resolved
Replace fuel hose in way of ships service generator.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 19 September 2008
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 25 August 2008 Resolved
Replace missing lagging in way of starboard main diesel engine.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 19 September 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 25 August 2008 Resolved
Replace bottom rail course in way of starboard deck rail.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 25 August 2008
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 August 2008 Resolved
Submit plans to the OCMI for review and approval of changes to 12 volt electrical system.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 26 August 2008
Lifesaving › Lifefloat › Paddle
Issued 25 August 2008 Resolved
Lash paddles to lifefloats.
Action required: 705 - Other - as specified
Due 25 September 2008
Resolved 25 August 2008
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 25 May 2007 Resolved
Determine source of hydraulic leak and make proper repairs to piping in engine room.
Action required: 705 - Other - as specified
Due 8 June 2007
Resolved 8 June 2007
Engineering › Bilge Water Management System › Hose
Issued 25 May 2007 Resolved
Double clamp flex hose on electric bilge pump in lazarette.
Action required: 705 - Other - as specified
Due 8 June 2007
Resolved 8 June 2007
Stability › Unintentional Flooding › General
Issued 25 May 2007 Resolved
Double clamp flex hose on hatch drain in main hold.
Action required: 705 - Other - as specified
Due 8 June 2007
Resolved 8 June 2007
Engineering › Bilge Water Management System › Pump
Issued 25 May 2007 Resolved
Prove proper operation of power bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 June 2007
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 25 May 2007 Resolved
Re-stencil floating waterlight and 04 paddles on lifefloat on roof.
Action required: 705 - Other - as specified
Due 8 June 2007
Resolved 8 June 2007
Engineering › Lubricating Oil Storage/Transfer System › Hose
Issued 25 May 2007 Resolved
Replace hydraulic line high pressure hose on steering pump.
Action required: 705 - Other - as specified
Due 8 June 2007
Resolved 8 June 2007
Lifesaving › Lifefloat › Serviceable
Issued 24 March 2006 Resolved
Both 10 person life floats are damaged beyond repair. Replace both life floats. Vessel route is restricted to operate within 1 mile from shore until life floats are replaced and installation verified by USCG Marine Inspector.
Action required: 705 - Other - as specified
Resolved 11 April 2006
Resolution: Verified installation of 2 new life floats, deficiency cleared.
Construction/Loadline
Issued 5 January 2004 Resolved
Replace cracked window in pilot house. LEGACY COMPONENT DESC: Window
Due 2 February 2004
Resolved 12 January 2004
Resolution: Replaced window.
Construction/Loadline
Issued 5 January 2004 Resolved
Replace cracked stbd port light in engine room. LEGACY COMPONENT DESC: Port light
Due 5 February 2004
Resolved 12 January 2004
Resolution: Replaced port light.
Engineering › Diesel Engine (propulsion-direct drive)
Issued 5 January 2004 Resolved
Change fuel filter gasket on port diesel engine. LEGACY COMPONENT DESC: Fuel filter
Due 5 February 2004
Resolved 5 January 2004
Resolution: Changed fuel filter.
Construction/Loadline › Structures
Issued 5 January 2004 Resolved
Repair holed bulkhead IVO accomodation entrance. LEGACY COMPONENT DESC: Bulkhead
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 12 January 2004
Engineering › Bilge Water Management System
Issued 5 January 2004 Resolved
Replace flex hose for electric bilge pump in lazarette. LEGACY COMPONENT DESC: Flex Hose
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 12 January 2004
Lifesaving › Buoyant Apparatus
Issued 5 January 2004 Resolved
Mark person capacity on all LF's. LEGACY COMPONENT DESC: Life Float
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 12 January 2004
Stability › Watertight Integrity
Issued 5 January 2004 Resolved
Replace gasket on #1 fwd void hatch. LEGACY COMPONENT DESC: Gasket
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 5 January 2004
Stability › Watertight Integrity
Issued 5 January 2004 Resolved
Replace gasket on lazarette hatch. LEGACY COMPONENT DESC: Gasket
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 5 January 2004
Lifesaving
Issued 5 January 2004 Resolved
Make rescue platform able to withstand effects of wave action. LEGACY COMPONENT DESC: Rescue Platform
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 February 2004
Resolved 26 January 2004
Fire Fighting › Fire Pumps
Issued 18 December 2001 Resolved
Repair leaks to fire pump and fire hose valve. LEGACY COMPONENT DESC: Gland Sealing
Due 18 January 2002
Resolved 18 January 2002
Accommodation/Occupational Safety › Medical/First Aid
Issued 18 December 2001 Resolved
Provide wire splint for 1st Aid Kit.
Due 18 January 2002
Resolved 18 January 2002
Lifesaving › Rigid Liferafts
Issued 18 December 2001 Resolved
Renew retro-reflective tape on life floats. LEGACY COMPONENT DESC: Markings
Due 18 January 2002
Resolved 18 January 2002
Stability › Watertight Integrity
Issued 18 December 2001 Resolved
Make cargo compartment hatch watertight and provide securing devices.
Due 18 January 2002
Resolved 18 January 2002
Engineering › Bilge Water Management System
Issued 18 December 2001 Resolved
Prove proper operation of Rule bilge pump in lazaret. Properly attach float switch. LEGACY COMPONENT DESC: Pump
Due 18 January 2002
Resolved 18 January 2002
Construction/Loadline
Issued 29 January 2001 Resolved
Provide a weather tight hatch for main deck hold forward.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Navigation
Issued 29 January 2001 Resolved
Provide proper adjustment for steering system chain idler pulley in engine room.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R overhead in engine room in way of (IWO) hydraulic assist for steering and exhaust supports. Forward and aft 6" of frames and outboard to good metal.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Engineering
Issued 29 January 2001 Resolved
Renew cooling system piping at strainer for port engine.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
Renew primary bilge suction hose for engine room.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
Renew strainer for bilge suction in engine room.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
Renew transverse frames located in the engine room on port and stbd sides where marked.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R the #4 side shell vertical stiffener and associated hull plate on stbd side with a minimum insert of 18" x 18".
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R side shell on port side forward in as marked in engine room.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Electrical
Issued 29 January 2001 Resolved
Re-secure overhead wire in engine room over starboard engine.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R #2 frame on port side IWO hull plate as marked in galley.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R #5 vertical frame IWO side shell on port side in galley.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R 18" x 18" section of hull IWO #5 vertical frame in galley.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
Renew bilge suction where blanked off into lazerette, renew as original.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R forward bulkhead of lazerette as marked and provide stiffeners on 24" centers.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
C&R side shell on stbd side IWO turn, 4ft. aft of draft marks.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
In fore peak; Crop and Renew (C&R) tripped frames/vertical stiffeners on port & stbd sides.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
In forward hold; C&R #2, 3, & 4 side shell frames on port side as marked.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
In forward hold; C&R flanges on centerline where marked.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
In forward hold; C&R stbd side hull plate in lower bay where marked or audio gauge and prove less than 25% wastage.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Electrical
Issued 29 January 2001 Resolved
Renew improper high level bilge alarm wiring with appropriate boat cable.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
In forward hold; C&R 2" x 2" angle IWO #2 transverse stiffener where marked.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Lifesaving
Issued 29 January 2001 Resolved
Provide Proper weak-link for both life floats on board. Weak links should be installed that are of appropriate size and breaking strength according to the size of the life float.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Engineering
Issued 29 January 2001 Resolved
C/R wasted vents for slop tanks located aft of accom space
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Engineering
Issued 29 January 2001 Resolved
Provide proper flame screens for vent pipe IWO slop tank aft of accom space.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
Properly affix lazerrette bilge pump switch to a stationary point.
Condition: Unknown
Due 29 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 29 January 2001 Resolved
Repair engine room bilge alarm to pilot house.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Engineering
Issued 29 January 2001 Resolved
Provide proper flame screen for port side hydraulic tank vent line.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 9 October 1998 Resolved
Make repairs in fwd cargo hold as follows: a. V/weld port side ovhd aft of transverse #7. b. Crop/renew ovhd port/fwd IWO #1 trans deck frame as marked. c. V/weld cracks IWO #3 & #6 port side bottom long.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Engineering
Issued 9 October 1998 Resolved
Renew port aft cutlass bearing.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
Make repairs in E/R as follows: a. Crop/renew #1 vert frame stbd as marked IWO trans bottom frame. b. Crop/renew #2 vert frame and trans deck frame stbd side.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Install junction box cover outbd stbd main engine.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Repair or renew stuffing tube for generator cable.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Install metal hangers for cables crossing over engine room overhead.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Repair, renew or remove as necessary, all light fixtures in engine room.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Provide cover for generator battery.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Lifesaving
Issued 9 October 1998 Resolved
SECURE SNACK BAR EQUIPMENT TO SHELF OR REMOVE AS NECESSARY.
Condition: Unknown
Due 23 October 1998
Resolved 23 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
PROVIDE PLANS TO OCMI FOR APPROVAL OF INSTALLATION OF AUDIBLE/VISUAL BILGE ALARM SYSTEM AT OPERATING STATION.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
Crop/renew #1/#3 stbd gunwale supports.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Lifesaving
Issued 9 October 1998 Resolved
PROVE PROPER OPERATION OF PA SYSTEM.
Condition: Unknown
Due 23 October 1998
Resolved 23 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
Repair/reweld as nec. port side aft pilothouse hole in superstructure.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Engineering
Issued 9 October 1998 Resolved
Install 30X30 mesh screening for fuel tank vent.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Navigation
Issued 9 October 1998 Resolved
Repair steering chain to prevent rubbing along exhaust pipe.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Permanently mount air compressor.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Move multiple battery connections to a terminal block.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
Crop/renew side shell plating as marked stbd side IWO #1/#2 vert frame (cracked) in lazarette.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Engineering
Issued 9 October 1998 Resolved
Replace fuel shut-off valve labels.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
V/weld port/stbd corner round plating IWO deck in lazarette as marked.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
V/weld port aft transverse frame IWO port aft corner.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Accommodation/Occupational Safety
Issued 9 October 1998 Resolved
Replace missing ladder support nuts at access to Pilothouse roof.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Install cover for receptacle and remove dead-ended wire on aft engine room bulkhead.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Engineering
Issued 9 October 1998 Resolved
Install valve handle for generator fuel supply.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Engineering
Issued 9 October 1998 Resolved
Replace starboard shaft packing prior to floating vessel.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 9 October 1998 Resolved
Remove unused exposed wiring on potable water pump.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Fire Fighting
Issued 9 October 1998 Resolved
Provide proof of servicing for one B-I fire extinguisher at operating station.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Lifesaving
Issued 9 October 1998 Resolved
Replace one paddle for lifefloat and connect lifefloat to painter.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Documentation
Issued 9 October 1998 Resolved
Provide 47CFR part 80.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Documentation
Issued 9 October 1998 Resolved
Provide proof of garbage removal records.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Lifesaving
Issued 9 October 1998 Resolved
Post Emergency Instruction Plan in conspicuous place for passengers.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Construction/Loadline
Issued 9 October 1998 Resolved
Repair lower rub rail holding brackets as necessary.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Accommodation/Occupational Safety
Issued 9 October 1998 Resolved
Repair heater cover in accom space.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Lifesaving
Issued 25 September 1997 Resolved
RE-STENCIL PORT EMERGENCY FUEL CUTOFF VALVE.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Engineering
Issued 25 September 1997 Resolved
CORRECT FUEL LEAK ON PORT MDE.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Electrical
Issued 25 September 1997 Resolved
CORRECT WIRING HARNESS IN ENGINEROOM.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Electrical
Issued 25 September 1997 Resolved
CLEAN BATTERY TERMINALS IN ENGINEROOM.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Construction/Loadline
Issued 25 September 1997 Resolved
CLEAN GASKETS AND KNIFE EDGES ON BOTH WATERTIGHT DOORS.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Engineering
Issued 25 September 1997 Resolved
DOUBLE CLAMP VARIOUS HOSES ON MDE'S AND GEN SET.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Unknown
Issued 25 September 1997 Resolved
POST 1-800# FOR EMPLOYEE ASSISTANCE IAW DAPI PROGRAM.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Electrical
Issued 25 September 1997 Resolved
REMOVE DEAD WIRING AND SECURE GROUND WIRE IN ENGINEROOM.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Unknown
Issued 25 September 1997 Resolved
POST STABILITY LETTER ON BRIDGE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Lifesaving
Issued 25 September 1997 Resolved
PROVIDE DETACHABLE CLIP FOR LIFE RING BOUY.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Engineering
Issued 25 September 1997 Resolved
MISSING GUARD FOR STBD MDE ALTERNATOR.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Electrical
Issued 25 September 1997 Resolved
MISSING FLASHLIGHT FOR BRIDGE EMERGENCY LIGHTING.
Condition: Unknown
Due 14 October 1997
Resolved 17 October 1997
Fire Fighting
Issued 30 December 1996 Resolved
REPAIR OR REPLACE BRACKET FOR PORTABLE FIRE EXTINGUISHER LOCATED ON AFT BULKHEAD IN ENGINE ROOM.
Condition: Unknown
Due 30 December 1996
Resolved 30 December 1996
Lifesaving
Issued 30 December 1996 Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 30 December 1996
Resolved 30 December 1996
Lifesaving
Issued 30 December 1996 Resolved
PROVIDE RETRO-REFELECTIVE TAPE FOR LIFERING.
Condition: Unknown
Due 30 December 1996
Resolved 30 December 1996
Fire Fighting
Issued 30 December 1996 Resolved
REPAIR OR REPLACE BRACKET FOR PORTABLE FIRE EXTINGUISHER LOCATED ON BRIDGE.
Condition: Unknown
Due 30 December 1996
Resolved 30 December 1996
Navigation
Issued 30 December 1996 Resolved
BETTER SECURE GEAR BOX FOR STEERING GEAR.
Condition: Unknown
Due 30 December 1996
Resolved 30 December 1996
Unknown
Issued 12 September 1996 Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 23 September 1996
Resolved 23 September 1996
Lifesaving
Issued 19 September 1995 Resolved
INSTALL PROTECTIVE GUARD ON HYDRAULIC PUMP AND BELT, STARBOARD ENGINE
Condition: Unknown
Due 26 September 1995
Resolved 26 September 1995
Electrical
Issued 19 September 1995 Resolved
REPLACE BROKEN OUTLET, PORT SIDE, PARLOR ROOM.
Condition: Unknown
Due 19 September 1995
Resolved 21 September 1995
Construction/Loadline
Issued 19 September 1995 Resolved
REPLACE PORTHOLE GASKET, FORWARD PORTHOLE, STARBOARD SIDE IN PARLOR ROOM.
Condition: Unknown
Due 26 September 1995
Resolved 26 September 1995
Lifesaving
Issued 19 September 1995 Resolved
FIX PUNCTURES ON LIFE RINGS
Condition: Unknown
Due 19 September 1995
Resolved 21 September 1995
Lifesaving
Issued 19 September 1995 Resolved
INSTALL RETROREFLECTIVE TAPE ON 11 MN BUOYANT APPARATUS
Condition: Unknown
Due 19 September 1995
Resolved 21 September 1995
Lifesaving
Issued 19 September 1995 Resolved
RENEW LIFELINE STANCHION, PORT SIDE, AFT, AT STERN ENTRANCE
Condition: Unknown
Due 19 September 1995
Resolved 21 September 1995
Electrical
Issued 19 September 1995 Resolved
PROPERLY WIRE FUEL OIL TRANSFER PUMP.
Condition: Unknown
Due 26 September 1995
Resolved 26 September 1995
Lifesaving
Issued 19 September 1995 Resolved
PROVIDE 6 MN BUOYANT APPARATUS.
Condition: Unknown
Due 26 September 1995
Resolved 26 September 1995
Construction/Loadline
Issued 19 September 1995 Resolved
CROP AND RENEW LIP UNDER VOID COVER ON STACK AFT OF HOUSE.
Condition: Unknown
Due 19 September 1995
Resolved 21 September 1995
Navigation
Issued 19 September 1995 Resolved
DOUBLE NUT ALL BOLTS ON STEERING APPARATUS
Condition: Unknown
Due 19 September 1995
Resolved 21 September 1995
Navigation
Issued 19 September 1995 Resolved
REPLACE OUTDATED CHARTS 12343 AND 12332.
Condition: Unknown
Due 19 September 1995
Resolved 21 September 1995
Construction/Loadline
Issued 2 July 1993 Resolved
CARGO HOLD #1: CROP AND REVIEW STBD SIDE SHELL VERTICAL FRAME #6, 7, AND 8.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Construction/Loadline
Issued 2 July 1993 Resolved
PARLOR COMPARTMENT: CROP AND RENEW BOTTOM HORIZONTAL STIFFENERS #3 STBD, AND #4 & 5 PORT.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Construction/Loadline
Issued 2 July 1993 Resolved
CARGO HOLD #1: CROP AND RENEW #1 CENTER HORIZONTAL STIFFENER.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Unknown
Issued 2 July 1993 Resolved
VESSEL IS NOT TO OPERATE WITH PASSENGERS ONBOARD UNTIL THE ABOVE REPAIRS ARE MADE TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR NLT 12 JULY 1993.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Construction/Loadline
Issued 10 August 1992 Resolved
PLUG HOLES IN SIDE OF HOUSE/ENGINE ROOM AND REPLACE GLASS IN CRACKED PORTHOLE IN ACCOMODATION SPACE. TO BE COMPLETED TO THE SATISFACTION OF THEATTENDING CG MARINE INSPECTOR NOT LATER THAN 24AUG92.
Condition: Unknown
Due 17 September 1992
Resolved 17 September 1992
Lifesaving
Issued 10 August 1992 Resolved
REPLACE EXISTING FLOAT FREE/WEAK LINK WITH APPROVED TYPE LINK THAT HAS PROPER LABELING ATTACHED TO LINK. CORRECTION REQ'D BY 1900 11AUG92 TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 17 September 1992
Resolved 17 September 1992
Lifesaving
Issued 10 August 1992 Resolved
RECONFIGURE LIFELINES TO COMPLY WITH 46 CFR 177.35-1(B) AND (G). COURSES SHALL HAVE NO MORE THAN 12" BETWEEN THEM. TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR NO LATER THAN 17AUG92.
Condition: Unknown
Due 17 September 1992
Resolved 17 September 1992
Documentation
Issued 26 August 1991 Resolved
SCHEDULE A STABILITY TEST TO PROVE VSL'S ABILITY TO CARRY MORE THAN 11 PASSENGERS. VSL IS RESTRICTED TO CARRY 11 PASSENGERS, 12 TOTAL PERSONS UNTIL NEW STABILITY DATA IS DETERMINED.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Accommodation/Occupational Safety
Issued 26 August 1991 Resolved
REPLACE CRACKED WINDOWS IN PILOTHOUSE.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Navigation
Issued 26 August 1991 Resolved
PROPERLY MOUNT COMPASS IN PILOTHOUSE AND PROVE OPERATION OF LIGHT.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Documentation
Issued 26 August 1991 Resolved
PROVIDE PROPER FCC OPERATING PERMIT. TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING USCG INSPECTOR.
Condition: Unknown
Due 26 August 1991
Resolved 26 August 1991
Accommodation/Occupational Safety
Issued 3 June 1991 Resolved
PROVE THAT STANCHIONS AND LIFELINES ARE SATISFACTORILY IN PLACE.
Condition: Unknown
Due 3 June 1991
Resolved 3 June 1991
Navigation
Issued 22 August 1990 Resolved
VESSEL IS RESTRICTED PIERSIDE PENDING REPLACEMENT OF STEERING GEARBOX U-JOINT AND PROPER OPERATION TESTED.
Condition: Unknown
Due 22 August 1990
Resolved 22 August 1990
Navigation
Issued 19 April 1989 Resolved
CROP AND RENEW TO GOOD METAL THE CHANNELS AND TRIANGULAR SUPPORTS FOR RUDDER TUBES IN AFTER COMPARTMENT.
Condition: Unknown
Due 19 April 1989
Resolved 19 April 1989
Lifesaving
Issued 19 April 1989 Resolved
RENEW THE RING LIFE BUOY WATERLIGHT ON THE PORT SIDE AFT.
Condition: Unknown
Due 19 April 1989
Resolved 19 April 1989
Electrical
Issued 19 April 1989 Resolved
PROPERLY SPLICE WIRE TO THE AUTOMATIC BILGE PUMP IN THE ENGINE ROOM, FORWARD.
Condition: Unknown
Due 19 April 1989
Resolved 19 April 1989
Documentation
Issued 1 September 1987 Resolved
OBTAIN FCC RADIO TELEPHONY CERTIFICATE. VESSEL RESTRICTED TO 1000 FEET FROMSHORE WHEN CARRYING PASSENGERS UNTIL FCC CERTIFICATE IS OBTAINED.
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Fire Fighting
Issued 1 September 1987 Resolved
OBTAIN HAND PORTABLE FIRE/BILGE PUMP AND HOSE OF ADEQUATE LENGTH TO REACH ALL INTERIOR SPACES.
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Construction/Loadline
Issued 1 September 1987 Resolved
INSTALL BILGE PIPING AND STRAINER IN LAZARETTE PERMANENTLY PLUG LIMBER HOLELEADER FROM LAZARETTE TO VOID UNDER PASSENGER AREA.
Condition: Unknown
Due 1 September 1987
Resolved 1 September 1987
Electrical
Issued 29 August 1986 Resolved
RE-GLASS BASE OF PORT SIDE BATTERY BOX IN ENGINE ROOM.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Electrical
Issued 29 August 1986 Resolved
PROVE THAT ALL ACCESSORIES SUCH AS SWITCHES, FUSES AND SOCKETS ARE OF THE TYPE LISTED BY UNDERWRITERS LABORATORIES OR OTHER RECOGNIZED TESTING LABORATORY.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Engineering
Issued 29 August 1986 Resolved
PROVE THAT FLEXIBLE FUEL HOSE ON BOTH MAIN ENGINES IS OF AN APPROVED TYPE.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Engineering
Issued 29 August 1986 Resolved
CONDUCT HYDROSTATIC TEST OF 5 PSI ON INTEGRAL FUEL TANK IN PRESENCE OF USCG MARINE INSPECTOR.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Electrical
Issued 29 August 1986 Resolved
PROVE THAT THE OVER CURRENT PROTECTION FOR THE DECK AND CABIN LIGHT CIRCUITIS RATED AT 15 AMPS.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Electrical
Issued 29 August 1986 Resolved
INSTALL IMPERVIOUS SHEATHED WIRING TO FOLLOWING EXTERIOR LOCATIONS: HORN, STERN LIGHT AND TOWING LIGHTS.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986
Engineering
Issued 29 August 1986 Resolved
REPLACE FLEXIBLE HOSE CONNECTION MID-WAY BETWEEN FUEL PIPE TERMINATIONS WITH METALLIC UNION.
Condition: Unknown
Due 29 August 1986
Resolved 29 August 1986

Casualty record · 1

8 September 2005Routine · role: Involved in a Marine Casualty · activity 2491067
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.