MAURY USCG vessel records Sign in
← All vessels

DAIWAN FORTUNE

DAIWAN FORTUNE is a 2015 freight ship. The Coast Guard has recorded 7 inspections since 2015, most recently in November 2024, along with 3 deficiencies.

Records from 2015 to 2024. Most recent: inspection, 6 November 2024.

Built
2015
Last inspected
6 November 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9713820 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1350521
Flag
PANAMA
—
Maury page id
psix-1350521

Inspections, by type

…with no type recorded1
Years with a record 6 calendar years (2015–2024)
The 7 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it35531 - Dead Weight, Ton
22314 - Convention (Subpart B), Gross Ton
11139 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 7

6 November 2024 PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8031064
25 March 2023 PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7647825
23 March 2021 PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7161225
16 May 2019 Ballast Water Examination · PII Safety Exam · ISPS II Exam · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6685345
27 March 2017 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6102927
17 March 2017 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6189539
31 July 2015 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 5185352

Deficiency record · 3

11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 March 2021 Resolved
NOT LESS THAN ONE HALF OF THE TOTAL NUMBER OF LIFEBUOYS SHALL BE PROVIDED WITH LIFEBUOY SELF-IGNITING LIGHTS. PSCO OBSERVED TWO LIFEBUOYS WITHOUT REQUIRED SELF-IGNITING LIGHTS PRESENT. VESSEL'S CREW RETRIEVED LIGHTS AND ATTACHED. 10c
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 23 March 2021
Resolved 23 March 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 16 May 2019 Resolved
01 14199 MARPOL 73/78 ANNEX I REG. 14.7 & MEPC 107(49) 6.2.2 50AC THE ARRANGEMENT ON BOARD THE EXTRACTION OF SAMPLES FROM THE 15 PPM BILGE ALARM SHOULD GIVE A TRULY REPRESENTITATIVE SAMPLE OF THE EFFLUENT WITH ADEQUATE PRESSURE AND FLOW. PSCO OBSERVED A VALVE IN THE SAMPLE EXTRACTION LINE. THIS VALVE IS INCLUDED IN THE VESSEL'S PIPING DIAGRAM PROVIDED BY THE SHIP'S CREW AS WELL AS THE MANUAL FROM THE MANUFACTURER OF THE OCM. AN OPERATIONAL TEST WAS CONDUCTED AND THE OWS CONTINUED TO FUNCTION WHETHER THE VALVE WAS OPEN OR CLOSED. CLOSURE OF THIS VALVE CAN PREVENT THE OCM FROM RECEIVING A TRULY REPRESENTITIVE SAMPLE OF THE EFFLUENT.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2019
Resolved 10 June 2019
Resolution: Received class report from ABS stating deficiency has been rectified. Valve was removed.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 16 May 2019 Resolved
02 99103 33CFR156.170(C)(4) 40C EACH LOADING ARM AND EACH TRANSFER PIPE SYSTEM, INCLUDING EACH METALLIC HOSE, MUST NOT LEAK UNDER STATIC LIQUID PRESSURE AT LEAST 1 1/2 TIMES THE MAXIMUM ALLOWABLE WORKING PRESSURE. THE VESSEL'S CREW DID NOT CONDUCT THE TEAT AT 1 1/2 TIME THE MAWP. NO BUNKERING IN U.S. WATERS UNTIL THE TEST IS COMPLETED.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 May 2019

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.