MAURY USCG vessel records Sign in
← All vessels

METSOVO

METSOVO is a 2015 freight ship. The Coast Guard has recorded 9 inspections since 2016, most recently in January 2026, along with 4 deficiencies — 3 with no resolution recorded — and 2 operational controls.

Records from 2016 to 2026. Most recent: inspection, 13 January 2026.

Built
2015
Last inspected
13 January 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9708942 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1358849
Flag
BARBADOS
—
Maury page id
psix-1358849

Inspections, by type

…with no type recorded2
Years with a record 6 calendar years (2016–2026)
The 9 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it32540 - Convention (Subpart B), Gross Ton
19282 - Convention (Subpart B), Net Ton
57593 - Dead Weight, Metric Ton
67812 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 9

13 January 2026 PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8288435
8 March 2024 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7870082
28 September 2021 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7310235
19 September 2021 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7315613
21 August 2018 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6518494
6 August 2018 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6502653
15 February 2018 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6348899
23 January 2017 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6075106
12 September 2016 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5995420

Deficiency record · 4

07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 13 January 2026 No resolution recorded
Crew members shall be trained to be familiar with the arrangements of the ship as well as the location and operation of any fire-fighting systems and appliances that they may be called upon to use. PSCO observed crew onboard unable to properly connect International Shore Connection provided onboard 03 times. Crew then proceeded to connect to every hydrant on board and were unable to do so. 74SOLAS (20 CONS) II-2/15.2.2.1 17AC
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 13 January 2026 No resolution recorded
Ships of 500 gross tonnage and upwards shall be provided with at least one international shore connection complying with the fire safety system code. Shore connection unable to connect to ships hydrant. 74SOLAS (20 CONS) II-2/10.2.1.7.1 FSS Code 2.2.2 17AC
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 January 2026 No resolution recorded
except as permitted by the administration in exeptional circumstances, all metal sheaths and armour of cables shall electrically continuous and shall be earthed. PSCO observed armoured cable breakdown due to water intrusion from failed and wetted insulation of a through hole pipe penetration extending above the weather deck into the forward bosun store. 74SOLAS (20 CONS) II-2/45.5.1 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 28 September 2021 Resolved
Fire-fighting systems and appliances shall be kept in good working order and ready available for immediate use. PSCO observed the local firefighting hyper mist system in manual mode. There was also a company issued placard on the hyper mist control panel that states "Caution, to be kept in automatic mode and power supply turned on always." 74 SOLAS (20) II-2/14.2.2.1.2 10C
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 28 September 2021
Resolved 28 September 2021
Resolution: Local firefighting hyper mist system was placed back in proper service.

Ownership record