Records from 2016 to 2026. Most recent: inspection, 20 April 2026.
Inspection history · 17
20 April 2026
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8330638
24 March 2026
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8331271
2 July 2025
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8173808
6 September 2024
Deficiency Check · Administrative Inspection · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7997933
15 May 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7912998
4 May 2023
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7774003
28 September 2022
Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7528112
7 June 2022
COI Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7464109
24 June 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7234355
21 September 2020
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7062335
25 August 2020
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7042001
7 May 2019
Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6678501
25 September 2018
Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6548429
30 April 2018
Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6402568
12 June 2017
Administrative Inspection · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6163580
29 September 2016
Examination of Repairs · Simplified Stability Test · Internal Structural Exam · Plan Review "T" Boat · Administrative Inspection · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6022695
11 May 2016
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5874138
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 April 2026
Resolved
Provide new float light, current one is inop and damaged.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 April 2026
Resolved 21 April 2026
Resolution: New light onboard.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 20 April 2026
Resolved
Provide 8" bell.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 April 2026
Resolved 21 April 2026
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 2 July 2025
Resolved
Each item of survival craft equipment must be of good quality and efficient for the purpose of it is intended to serve. Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light. Two paddles on the life float in poor deteriorating condition. Replace both paddles to the satisfaction of Marine Inspector.
46CFR 180.75 (d)
Action required: 10 - Deficiency Rectified
Due 2 July 2025
Resolved 2 July 2025
Resolution: Operator replaced both paddles
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 May 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Cable terminal on forward bulkhead of engine room is missing cover. Install cover to satisfaction of Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 20 May 2024
Resolution: Guard was fabricated and installed over electrical terminal in engine room
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 May 2024
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. Fuel shutoff marking is faded and does not indicate direction of operation. Apply new marking to satisfaction of Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 20 May 2024
Resolution: Operator installed new fuel shutoff placard on deck.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 May 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Electrical outlet on forward bulkhead of accommodation space has broken faceplate. Repair/replace to satisfaction of Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 20 May 2024
Resolution: New electrical outlet was installed in accommodation space.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 May 2024
Resolved
Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway. Generator control box is secured utilizing zip tie. Make appropriate repairs to adequately secure control box to satisfaction of Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2024
Resolved 20 May 2024
Resolution: Operator removed zip tie from generator control box and installed metallic brackets.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 15 May 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of electrical equipment and systems. Generator has water leak from water pump housing. Repair to satisfaction of Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2024
Resolved 30 May 2024
Resolution: Leaking water pump on generator replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 15 May 2024
Resolved
Except for engine exhausts, each inlet or discharge pipe that penetrates the hull below a line drawn parallel to and at least 150 millimeters (6 inches) above the deepest load waterline must have means to prevent water from entering the vessel if the pipe fractures or otherwise fails. Inlet pipe for wash down pump has broken handle on valve. Socket wrench is in place to actuate valve. Repair/replace valve to satisfaction of Marine Inspector prior to credit drydock. Until repaired, socket wrench is required to be next to valve while operating.
Action required: 705 - Other - as specified
Resolved 20 May 2024
Resolution: Handle for shutoff valve was replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 15 May 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances. Vessel's deck is delaminating from hull in several areas, specifically around drainage openings. This condition has allowed water to penetrate into the fuel tank/steering compartment and caused rot/more delamination. Make repairs to satisfaction of Marine Inspector prior to credit drydock. Provide repair proposal prior to starting work.
Action required: 705 - Other - as specified
Resolved 13 September 2024
Resolution: Vessel made repairs to delamination around drainage openings by removing existing glass and replacing with new. Verified satisfactory condition after repairs during drydock inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 7 June 2022
Resolved
While underway, MI observed the rudder post leaking excessively during certain rudder angles.
Require vsl to repair/fix failing component in 14 Days.
46cfr176.802
16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2022
Resolved 15 June 2022
Resolution: Rudder leak was fixed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 June 2022
Resolved
MI observed the generator fuel filter has a plastic draining valve on the flame sheild/bowl.
Require vsl to replace plastic valve with a metal vlave and plug in 14 days.
46cfr182.455
16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2022
Resolved 10 June 2022
Resolution: Replaced plastic vlave with metal plug.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 June 2022
Resolved
MI observed FCC radio station license was expired on 28APR22.
Require vsl to have a valid FCC radio station license in 14 days.
47cfr80.13
16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2022
Resolved 15 June 2022
Resolution: FCC station license was apply for/in process with new mssi and call sign.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2021
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Various dead end wires no longer in use were found. 02 on top of cabin, aft of life float. 02 were found in engine room most forward bulkhead. remove old wires, or have them terminate in an enclosure.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2021
Resolved 1 September 2021
Resolution: [name withheld] submitted pictures which showed corrections on the various dead end wires found during the inspection, deficiencies has been corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 September 2020
Resolved
Discovered wire nuts joining two wires on battery charger wiring. Install permanent wiring splice within an enclosure (terminal block etc)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 October 2020
Resolved 22 September 2020
Resolution: Owner submitted photographs of repairs to the electrical cables. Removed wire nuts and made permanent connections.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 August 2020
Resolved
Vessel's generator fuel filter was installed without a flame shield installed below filter. Fuel filters with bowls of other than steel construction must be approved by the Commandant, and be protected from mechanical damage. Install metal flame shield to fuel filter assembly.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2020
Resolved 21 September 2020
Resolution: Owner installed flame shield on fuel filter.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 7 May 2019
Resolved
Vessels on a Limited Coastwise route must carry six hand red and six hand orange distress signals. Acquire 12 appropriate distress signals. - 46 CFR 180.68(a)(1)(6)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2019
Resolved 1 July 2019
Resolution: See narrative.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 May 2019
Resolved
Watertight bulkheads must be maintained watertight. Two bulkhead penetrations between the forward space and the engine room must be sufficiently filled. - 46 CFR 178.320(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2019
Resolved 1 July 2019
Resolution: See narrative.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 April 2018
Resolved
PWG01) Replace non marine wires with properly sized marine grade wire connecting inverter to generator battery. Secure wire to bulkhead at least every 24 inches with a metallic support. 46 CFR 183.340.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2018
Resolved 31 May 2018
Resolution: Owner provided Spec sheets and documentary proof of replacement of inverter wire with 8 AWG UL Marine Grade Boat Cable.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 12 June 2017
Resolved
RT01: Label amount of life jackets stowed under seats for adults. 46 CFR 185.604(f) DUE 26 JUN 2017
Condition: Invalid
Action required: 705 - Other - as specified
Due 26 June 2017
Resolved 7 July 2017
Resolution: Received email containing pictures of the stowage of life jackets correctly labeled on both sides. Deficiency Cleared.
Electrical › Electric Generation Source (service) › Generator
Issued 29 September 2016
Resolved
Vessel submitted request to replace current generator. Vessel required to submit repower worksheet for generator, one line drawing, load analysis, and breaker/fuse/wire specs.
Action required: 705 - Other - as specified
Resolved 27 September 2018
Resolution: Review of activity 6022695 narrative found that the generator replacement was completed with CG oversight and the required documentation was provided.