← All vessels
PRESINGE
PRESINGE is a 2015 freight ship. The Coast Guard has recorded 16 inspections since 2016, most recently in May 2026, along with 7 deficiencies and 3 operational controls.
Records from 2016 to 2026. Most recent: inspection, 1 May 2026.
- Built
- 2015
- Last inspected
- 1 May 2026
- Documentation
- Not in the documentation file of 10 August 2026
- Deficiencies
- 7 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9715452
V7A5859
1371424
Flag
MARSHALL ISLANDS
Maury page id
psix-1371424
Inspections, by type
The 16 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.
Documentation record
Tonnage as PSIX records it27490 - Convention (Subpart B), Net Ton
94361 - Displacement, Metric Ton
81886 - Dead Weight, Metric Ton
43036 - Convention (Subpart B), Gross Ton
94361 - Displacement, Metric Ton
81886 - Dead Weight, Metric Ton
43036 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 16
1 May 2026
PSC B
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8358549
6 March 2025
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8089140
28 June 2023
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7718713
20 September 2021
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7292099
31 October 2020
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7087728
19 December 2019
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6876872
18 December 2019
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6876279
10 December 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6870696
10 December 2019
Ballast Water Examination · PII Safety Exam · ISPS Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6870780
9 December 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6876211
6 June 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6705390
8 May 2018
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6402744
2 May 2018
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6405880
29 March 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6113675
6 February 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6079407
7 January 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5793091
Deficiency record · 7
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 20 September 2021
Resolved
Before the ship leaves the port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed that the annual inspection for all liferrafts were due by 15SEP2021, and had not yet been completed.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 20 September 2021
Resolved
The ORB Part I shall be completed on each occasion whenever (4) discharge overboard or disposoal of otherwise the bilge under which has been accumulated in machinery. PSCO observed the throughput of the OWS exceeded the sysytem capabilities by 1.6M3. In addition, the wrong operation was entered as 15.3 versus 15.1. Lastly on 18SEO 21 no stop time was entered for internal transfer. MARPOL Annex I/ REG. 17.2.4 ac
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 December 2019
Resolved
99101 - Other (Safety in general) - On December 13, 2019, the crew onboard M/V PRESINGE discovered leaking of ballast water inside No. 7 cargo hold caused by suspected damages during cargo operations while in Port of Newark, New Jersey. The Coast Guard did not receive a report until approximately 0830 on December 17, 2019; during which time, M/V PRESINGE was anchored at Cape Charles Anchorage, Sector Virginia Captain of the Port zone. - 33 CFR 160.216
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 December 2019
Resolved
Main and auxilliary machinery essential for the safe operation shall be provided and safety of the ship shall be provided with effective means for its operation and control
Vessel's main propulsion engine is inoperable, engine alarm panel displays: M/E ECS
SOLAS 14 II/1.31.1
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 10 December 2019
Resolved
The oil record book part I shall be completed on each occassion on a tank-to-tank basis if appropriate, whenever any of the following machinery space operations takes place in the ship: bunkering of fuel or bulk lubricating oil.
Last bunkering operation from 05Dec19 was not recorded in the oil record book.
MARPOL I/17.2.5
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 6 February 2017
Resolved
1730- Oily water separating equipment-In considering the design of such equipment and approvals, the administration shall have regard to the specification recommended by the organization. PSCO observed that none of the engineers were able to retrieve the history of the oily water separator’s operations. MARPOL I/14.7 MEPC.107(49) 16a
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 6 February 2017
Resolved
1799- Other (MARPOL Annex I) Each loading arm and transfer system, including each metallic hose, must not leak under static liquid pressure at least 1.5 times the maximum allowable working pressure annually. Crew had been pressure testing bunker lines with air only. 33CFR 156.170 (c) (4) a
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.