Records from 1990 to 2019. Most recent: inspection, 26 December 2019.
Documentation record
Registered dimensions (L × B × D)53.0 ft × 28.0 ft × 5.8 ft
Registered tonnagegross 78 / net 53
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderKENNER MARINE & MARINERY · LAPLACE, LA, UNITED STATES · built 1975
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHOUMA, LA
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it78 - Regulatory (Subpart C or D), Gross Ton
53 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 29
26 December 2019
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6878963
26 December 2018
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6602880
19 November 2018
Examination of Repairs · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6583272
27 December 2017
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6329446
30 December 2016
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6064101
30 September 2015
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5732399
14 September 2015
Internal Structural Exam · COI Inspection · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5734024
9 June 2008
Internal Structural Exam · Periodic Inspection · Hull Examination
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3232557
3 August 2006
Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2738908
9 June 2005
Hull Examination · COI Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2385288
15 June 2004
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2101143
25 June 2003
Internal Structural Exam · Hull Examination · Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1826292
17 September 2002
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1676836
4 September 2001
Re-Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1373625
28 June 2000
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1443048
5 August 1999
Re-Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1446810
24 June 1998
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1416727
4 August 1997
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1364285
1 August 1996
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1355894
5 July 1996
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1086644
7 July 1995
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1412833
5 July 1994
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1425474
5 October 1993
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 847190
18 August 1993
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1393974
12 January 1993
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1133022
3 June 1992
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1384967
1 July 1991
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1247006
29 May 1990
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 925015
22 May 1990
Initial Certification · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1230420
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 26 December 2019
Resolved
Three (3) life jackets were not serviceable at the time of inspection. Vessel shall maintain serviceable life jackets at all times.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 December 2019
Resolved 27 December 2019
Resolution: Cleared to the satisfaction of the Marine Inspector
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 December 2019
Resolved
Port side generator was leaking excessive oil into the port engine room. Generator shall be maintained to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 January 2020
Resolved 21 January 2020
Resolution: Inspected repairs, all sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 26 December 2019
Resolved
General electrical safety, Vsl had several loose or broken cables entering boxes/ connection boxes and not water tight. 183.115 to 183.10-20(old T)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 January 2020
Resolved 27 December 2019
Resolution: Cleared to the satisfaction of the Marine Inspector
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 December 2019
Resolved
Permanent Repair was made to the fuel filter housing without prior approval that was not renewed to original. Permanent repairs or alterations shall be made with approval of OCMI.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 January 2020
Resolved 10 January 2020
Resolution: Repairs inspected, all sat
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 December 2019
Resolved
Name of vessel was not legible on both sides of the vessel that was observed. Name of vessel shall be legible
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 January 2020
Resolved 27 December 2019
Resolution: Cleared to the satifaction of the Marine Inspector.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 26 December 2019
Resolved
Pre use inspections are not completed or logged. Complete and log pre use inspections per API RP2D 4.2.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 January 2020
Resolved 27 December 2019
Resolution: Cleared to the satisfaction of the Marine Inspector.
Lifesaving › Lifebuoys › Serviceable
Issued 30 December 2016
Resolved
One ring life buoy found water logged and unservicable. Replace ringbuoy.
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: New ring buoy provided onboard.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 December 2016
Resolved
All electrical systems on board shall be designed and installed to protect persons from electrical shock. Place spliced wiring in head in junction box.
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: Proper repairs made to electrical wiring.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 30 December 2016
Resolved
All rotating machinery shall have sufficient guards to protect personnell from injury. Add guard to STBD PTO.
Action required: 705 - Other - as specified
Due 6 January 2017
Resolved 3 January 2017
Resolution: Suitable guards added to machinery installation.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 30 December 2016
Resolved
Provide certification for deck crane. Provide crane record book.
Action required: 705 - Other - as specified
Due 19 January 2017
Resolved 6 January 2017
Resolution: Crane inspected & maintained IAW API 2D, 60-month load test conducted per 46 CFR 107.26, and crane record book assembled.
Navigation › Piloting/Steering › Marine Charts
Issued 2 October 2015
Resolved
Vessel was in laid up status and did not have updated charts onboard.
Action required: 705 - Other - as specified
Due 5 October 2015
Resolved 5 October 2015
Resolution: Marine Inspector attended vessel and verified charts were up to date.
Engineering › Pressure Vessel › Relief Valve
Issued 2 October 2015
Resolved
Vessel's UPV did not have a relief valve on the cylinder. In addition, the pressure gauge only went to 100 psi.
Action required: 705 - Other - as specified
Due 5 October 2015
Resolved 5 October 2015
Resolution: Marine Inspector attended the vessel and observed a new relief valve and pressure guage installed.
Engineering › Diesel Engine (auxiliary) › Pump, Positive Displacement
Issued 17 September 2002
Resolved
Repair or replace leaking hydraulic lines from pump to crane.
Due 17 October 2002
Resolved 17 September 2002
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 17 September 2002
Resolved
Replace fibergrating steps with steel exiting engine room.
Due 17 October 2002
Resolved 17 September 2002
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 17 September 2002
Resolved
Provide current tide tables publication for vessel.
Due 17 October 2002
Resolved 17 September 2002
Lifesaving
Issued 4 August 1997
Resolved
REPLACE LIFE FLOAT PRIOR TO SAILING.
Condition: Unknown
Due 4 August 1997
Resolved 8 August 1997
Documentation
Issued 22 May 1990
Resolved
SUBMIT STABILITY CALCULATIONS TO COAST GUARD MARINE SAFETY CENTER FOR ISSUANCE OF STABILITY LETTER.
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Documentation
Issued 22 May 1990
Resolved
SUBMIT PLANS SHOWING GENERAL ARRANGEMENT, INBOARD AND OUTBOARD PROFILE AND A STRUCTURAL ANALYSIS OF ALL LEGS AND LEG TOWER SUPPORTS TO [name withheld].
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Unknown
Issued 22 May 1990
Resolved
SUBMIT OPERATING MANUAL MEETING THE APPLICABLE SECTIONS OF 46 CFR 109.121 TO [name withheld] FOR APPROVAL.
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990