Records from 2016 to 2023. Most recent: inspection, 24 March 2023.
Inspection history · 5
24 March 2023
PSC B
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7656430
18 October 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7079200
8 May 2020
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6947267
14 April 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6124157
2 January 2016
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5789703
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 14 April 2017
Resolved
Oil filtering equipment shall be design and approved by the administration and shall be such as will ensure that any oil mixture discharged into the sea after passing through the system has an oil content not exceeding 15ppm. The OWS OCM is leaking effluent into the control box. Continued in narritive
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 17 April 2017
Resolved 21 April 2017
Resolution: Repairs verified by class - see docs
Operations/Management › Pollution › Control of Garbage
Issued 14 April 2017
Resolved
Every ship of 100 gross tons and above shall carry a garbage management plan which the crew shall follow. The plan shall provide written procedures for collecting, storing, processing and disposing of garbage. Crew is not following garbage management plan resulting in mixed garbage. Continued in narrative
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2017
Resolved 14 April 2017
Resolution: Rectified
Documentation › Logs/Records › Ballast Water Logs/Records
Issued 14 April 2017
Resolved
Vessel must maintain a ballast water management plan that includes detailed fouling maintenance and sediment removal procedures. Vessel has a bio-fouling management plan to document and record fouling maintenance and sediment removal, but is not recording fouling maintenance and sediment removal in the record book of the bio-fouling management plan (continued in narrative)
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 April 2017
Resolved 14 April 2017
Resolution: Rectified
Lifesaving › Immersion Suits › General
Issued 14 April 2017
Resolved
In an immersion suit is to be worn in conjunction with a lifejacket, the lifejacket shall be worn over the immersion suit. Vessel's immersion suits require lifejackets to be worn in conjunction with the immersion suit. Continued in narrative
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 April 2017
Resolved 14 April 2017
Resolution: Rectified
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 14 April 2017
Resolved
Drills shall as far as practicable be conducted as if there were an actual emergency. Vessel's crew failed first abandon ship drill due to crew unfamiliarity with duties and responsibilities and incorrect installation of the fall prevention devices that prevented launch of lifeboat. 74SOLAS(14)19.3.1 10c
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 April 2017
Resolved 14 April 2017
Resolution: Rectified