Records from 2020 to 2026. Most recent: inspection, 28 July 2026.
Inspection history · 9
28 July 2026
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8448130
2 March 2026
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8318848
23 January 2026
PSC B · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8299488
3 January 2026
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8289405
30 October 2020
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7087508
30 October 2020
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7090942
28 September 2020
In-Service Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7066769
28 September 2020
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7067287
27 September 2020
PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7066050
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 28 July 2026
Resolved
If the vessel's automatic identification system (AIS) radar, radio navigation receivers, gyrocompass, echo depth sounding device, or primary steering gear stops operating properly, the person directing the movement of the vessel must report or cause to be reported that it is not operating properly to the nearest Captain of the Port, District Commander, or, if participating in a Vessel Traffic Service, to the Vessel Traffic Center, as soon as possible. PSCO Observed X-Band radar inop on board without notification to Coast Guard.
Action required: 10 - Deficiency Rectified
Due 28 July 2026
Resolved 28 July 2026
Resolution: Vessel was informed of the reporting requirements for non-operational equipment
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 28 July 2026
Resolved
All ships of 3000GT or more shall have a 3GHZ radar, or if considered approprate a second 9 GHZ radar. PSCO observed inop X-band radar
Action required: 15 - Rectify deficiencies by next port
Due 28 July 2026
Resolved 29 July 2026
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 3 January 2026
Resolved
FIRE PORTECTIONS SYSTEMS AND APPLANCES SHALL BE MAINTAINED
READY FOR USE. PSCO OBSERVED 02 COVERED SMOKE DETECTOR, 01
NEAR THE BOILER AND 01 IN THE WORKSHOP.
74SOLAS(2009)
II-2/14.1.1
17C
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2026
Resolution: Verified removal prior to departure.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 January 2026
Resolved
WHERE CABLES ARE INSTALLED IN HAZARDOUS AREAS INTRODUCE THE
RISK OF FIRE OR EXPLOSION. SPECIAL PRECAUTIONS AGAINST SUCH
RISKS SHALL BE TAKEN. PSCO OBSERVED APPROXIMATELY 06 OPEN
WIRES ON THE #2 GENERATOR.
74SOLAS(2004)
II-1/45.5.4
17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2026
Resolution: Verified corrections prior to departure.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 3 January 2026
Resolved
THE IGNITABILITY OF COMBUSTIBLE MATERIALS SHALL BE RESTRICTED
PSCO OBSERVED OILY RAGS, ACCUMULATION OF CARDBOARD BOXES
THROUGOUT THE ENGINE ROOM & DRUM CONTAINiNG APPROXIMATELY
01 GALLON OF OIL STORED ADJACENT TO THE STEERING GEAR ROOM
ENTRANCE.
74SOLAS(2009)
II-2/4.1.3
17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 January 2026
Resolution: Verified corrections prior to departure.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 January 2026
Resolved
MAINTENANCE, TESTING AND INSPECTIONS SHALL BE CARRIED OUT BASED ON THE GUIDELINES DEVELOPED BY THE ORGANIZATION AND IN A MANNER HAVING DUE REGARD TO ENSURING THE RELIABILITY OF FIRE FIGHTING SYSTEMS AND APPLIANCES. [name withheld] EXTINGUISHERS SITTING ON THE DECKPLATES & E-GEN FIRE EXTINGUISHER WITHOUT SIGNAGE OR WRITTEN COMPLETION OF MONTHLY CHECKS.
74SOLAS(2009)I-2/14.2.2.1
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2026
Resolved 10 February 2026
Resolution: Received class report.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 3 January 2026
Resolved
THE COMPANY SHOULD ESTABLISH PRDCEDURES, PLANS AND
INSTRUCTIONS, INCLUDING CHECKLISTS AS APPROPRIATE, FOR KEY
SHIPBOARD OPERATIONS CONCERNING THE SAFETY OF THE PERSONNEL, SHIP AND PROTECTION OF THE ENVIRONMENT. THE VARIOUS TASKS SHOULD BE DEFINED AND ASSIGNED TO QUALIFED PERSONNEL. CREW WAS UNABLE TO PROVIDE CHECKLIST AND LOGS FOR THE MONTHLY CHECKS OF FIRE FIGHTING APPLIANCES.
74SOLAS(2020)IX/3.1
ISM CODE 7
16AC
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 January 2026
Resolved 10 February 2026
Resolution: Received class report
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 3 January 2026
Resolved
FIRE CONTROL PLANS AND BOOKLETS SHALL BE KEPT UPTO DATE; ANY
ALTERATIONS THERE TO SHALL BE RECORDED AS SOON AS POSSIBLE.
PSCO OBSERVED VARIOUS CARGO HOLDS VENTILATION CLOSURES NOT
INDICATED ON THE VESSEL'S FIRE CONTROL PLAN.
74SOLAS(2009)II-2/15.2.4.1
50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 February 2026
Resolved 2 March 2026
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 3 January 2026
Resolved
FIRE CONTROL PLANS AND BOOKLETS SHALL BE KEPT UPTO DATE; ANY
ALTERATIONS THERE TO SHALL BE RECORDED AS SOON AS POSSIBLE.
PSCO OBSERVED LATEST FIRE CONTROL PLAN WAS NOT ENDORSED BY
THE VESSEL'S CLASS OR FLAG.
74SOLAS(2009)II-2/15.2.4.1
50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 February 2026
Resolved 2 March 2026
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 3 January 2026
Resolved
INDICATORS SHALL BE PROVIDED FOR SHELL DOORS OR OTHER
OPENINGS WHICH, COULD LEAD TO MAJOR FLOODING IF LEFT OPEN OR
NOT PROPERLY SECURED, SHALL BE PROVIDED WITH INDICATORS
SHOWING WHETHER DOORS ARE OPEN OR CLOSED, PSCO OBSERVED
INDICATOR LIGHTING ON WATER TIGHT DOORS ON FRAME 47 NOT
CLEARLY INDICATING WHICH DOORS ARE OPEN OR CLOSED.
74SOLAS(2004)II-1/23-1.2
50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 February 2026
Resolved 10 February 2026
Resolution: Received class report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 October 2020
Resolved
Agent reported vessel loss propulsion in transit; resulting to pilot utilizing tugs to ensure safe handling and maneuverability to pier.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 2 November 2020
Resolved 31 October 2020
Resolution: Received class report BV stating all outstanding deficiencies have been rectified.